Road Conditions

Print this page

Region

QLD map - click for road conditions in each region
Click a region to view local road conditions

Road report information is compiled by RACQ in partnership with The Department of Transport and Main Roads, Queensland Police Service and other government sources/websites (see disclaimer).

Queensland State Government logoQueensland Police logo

1 - South Coast (Logan, Gold Coast, Boonah...) 2 - Metropolitan (Brisbane, Ipswich, Cleveland...) 3 - North Coast (Sunshine Coast, Caboolture, Redcliffe, Kilcoy, Esk...) 4 - Wide Bay & Burnett (Gympie, Bundaberg, Maryborough...) 12 - Darling Downs (Toowoomba, Miles, Stanthorpe...) 4 - Wide Bay & Burnett (Gympie, Bundaberg, Maryborough...) 5 - Fitzroy (Gladstone, Rockhampton, Emerald...) 6- Mackay/Whitsunday (Bowen, St. Lawrence, Clermont...) 7 - Northern (Ingham, Townsville, Ayr, Charters Towers...) 8- Far North (Cooktown, Cairns, Tully...) 9- North West (Mount Isa, Normanton, Hughenden...) 10- Central West (Boulia, Winton, Barcaldine, Blackall, Longreach...) 11- South West (Roma, St. George, Charleville...) 12 - Darling Downs (Toowoomba, Miles, Stanthorpe...) Please use the map detail (zoomed rectangle) above

Cause

Central West
Road Closures/Load Limits
RICHMOND WINTON ROAD, KYNUNA, 4823 - Open (with caution) proceed with caution. .Last edited: 31 Mar 2015 09:36 Next update:as conditions change
Last report received from DTMR: 2015-03-31T09:36:21
Roadworks
WINTON ROAD, BOULIA, 4829 - Planned Roadworks Both Directions Gravel Sidetrack in use at Granton Creek - 60km from Boulia. Commencing: 11 May 2015, at 7:00am Concluding:30 June 2015, at 12:00am No blockage No delays expected. Proceed with caution. Gravel Sidetrack in use at Granton Creek - 60km from Boulia Last edited: 06 May 2015 12:47
Last report received from DTMR: 2015-05-06T12:47:22
Darling Downs
Incidents
WARREGO HIGHWAY, COLLEGE VIEW, 4343 - Potholes or road surface damage Hazard Eastbound Road Surface Damage at Moroney Road. No delays expected. Reduced speed limit (80km/h). Last edited: 19 May 2015 14:32
Last report received from DTMR: 2015-05-19T14:32:52
Roadworks
CHALK DRIVE, TOOWOOMBA CITY, 4350 - Planned Roadworks Both Directions Intersection Chalk Drive and Neil Street. Commencing: 28 May 2015, between the hours of 9:30am and 2:30pm Concluding: 29 May 2015. Limited to one lane No delays expected. Changed traffic conditions. On Site During Working Hours: Thursday 28th May Eastbound Slow Lane Closed, reduced speed 40km/hr. Friday 29th May Westbound Slow Lane Closed, reduced speed 40km/hr. On Site After Hours: Return to normal traffic conditions. Last edited: 28 May 2015 10:29
Last report received from DTMR: 2015-05-28T10:30:01
WARREGO HIGHWAY, COLUMBOOLA, 4415 - Planned Roadworks Both Directions Level Railway Crossing Columboola. Commencing: 28 May 2015 Concluding: 05 June 2015, weather permitting Single lane in operation Long delays expected. Changed traffic conditions. On Site: 28 May 2015 to 30 May 2015 6:00am to 6:00pm: Single Lane in Operation, Reduced Speed 40km/hr Portable Traffic Signals with delays of up to 15mins , Please Allow for Extra Travel Time. AFTER HOURS: 28 May 2015 to 30 May 2015 6:00pm to 6:00am: Reduced Speed 60km/hr On Site: 31 May 2015 to 01 June 2015, 24hrs a day Road closed both directions, Sidetrack in Operation, Reduced Speed 40km/hr Portable Traffic Signals with delays of up to 30mins , Please Allow for Extra Travel Time. On Site: 02 June 2015 to 05 June 2015 6:00am to 6:00pm: Single Lane in Operation, Reduced Speed 40km/hr Portable Traffic Signals with delays of up to 15mins , Please Allow for Extra Travel Time. AFTER HOURS: 02 June 2015 to 05 June 2015, 6:00pm to 6:00am: Reduced Speed 60km/hr Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 21 May 2015 11:13
Last report received from DTMR: 2015-05-21T11:14:19
WARREGO HIGHWAY, REDWOOD, 4350 - Planned Roadworks Westbound Toowoomba Range, Westbound, above The Saddle. Commencing: 25 May 2015 at 06.00PM Concluding: 21 June 2015 at 05.30AM Limited to one lane Delays expected. Changed traffic conditions. NIGHT WORKS TOOWOOMBA RANGE Work Hours: 7 days, 06.00PM - 05.30AM, single lane in operation, speed reduced to 40km/hour, traffic control in place, delays up to 10 minutes are to be expected. After Hours: Speed reduced to 60km/hour Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 20 May 2015 14:14
Last report received from DTMR: 2015-05-20T14:14:17
RUTHVEN STREET, TOOWOOMBA CITY, 4350 - Planned Roadworks Northbound Between Bridge Street and Chalk Drive). Commencing: 22 May 2015, betweem the hours of 6:00am to 6:00pm Concluding: 10 June 2015. Limited to one lane No delays expected. Changed traffic conditions. On Site During Work Hours: Northbound limited to one lane with reduced speed 40km/hr. Afterhours: Return to normal traffic conditions. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 21 May 2015 15:26
Last report received from DTMR: 2015-05-21T15:26:25
SPENCER STREET, GATTON, 4343 - Planned Roadworks Both Directions Intersection Spencer Street and Balantine Street, Aquatic Centre. Commencing: 19 May 2015, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 10 June 2015, weather permitting. Limited to one lane No delays expected. Changed traffic conditions. On Site during work hours: No right turn into Aquatic Centre and Ballantine Street, limted to one lane both directions, No delays expected but traffic control will be on scene, Reduced speed 40km/h. On Site after hours: Return to normal traffic conditions. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 18 May 2015 14:04
Last report received from DTMR: 2015-05-18T14:04:24
NEW ENGLAND HIGHWAY, COALBANK, 4352 - Planned Roadworks Both Directions Approximatley 1.3 kilometres south of Rocky Gully Road. Commencing: 27 April 2015, between the hours of 6:00am and 6:00pm,Monday to Friday. Concluding: 29 May 2015, weather permitting. All lanes affected Delays expected. Changed traffic conditions. On site during working hours: Single Lane in Operation, Reduced Speed 40km/hr, Traffic Control with Possible Delays of up to 15mins, Please Allow for Extra Travel Time. On site after hours: Single Lane in Operation, Reduced Speed 40km/hr, Portable Traffic Signals with Possible Delays of up to 5mins. Last edited: 20 Apr 2015 11:59
Last report received from DTMR: 2015-04-20T11:59:07
KOGAN CONDAMINE ROAD, KOGAN, 4406 - Planned Roadworks Both Directions Three separate work sites over a 35 kilometer stretch of road beginning at Kogan township and heading West. Only one work site will be operational at a time. Commencing: 30 March 2015 at 06.00AM Concluding: 13 July 2015 at 06.00AM Single lane in operation Delays expected. Changed traffic conditions. Work Hours: Monday - Friday, single lane in operation, portable signals, reduced speed to 40km/hour, with delays of up to 5 minutes. After Hours: Single lane in operation, speed reduced to 60km/hour with delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 26 Mar 2015 07:41
Last report received from DTMR: 2015-03-26T07:41:17
WARREGO HIGHWAY, COTSWOLD HILLS, 4350 - Planned Roadworks Both Directions From Nugent Pinch Road through to Charlton . Commencing: 23 February 2015 at 6.00am Concluding: 30 June 2016 at 6.00pm weather permitting. All lanes affected Delays expected. Changed traffic conditions. Work Hours: 6 days a week, minor detours and sidetracks in place, reduced speed to 60km/h, portable signals, delays up to 15 minutes and traffic control After Hours: Minor detours and sidetracks, reduced speed to 80km/h, portable signals. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 06 May 2015 06:44
Last report received from DTMR: 2015-05-06T06:44:06
Special Events
VICTORIA STREET, FOREST HILL, 4342 - Special Event Both Directions Gallipoli Rememberence March. Victoria Street Forest Hill, between Church Street and William Steet. Commencing: 22 August 2015, between the hours of 10:30am and 11:15am Concluding: 22 August 2015. Road closed both directions No delays expected. Use alternative route. Last edited: 08 May 2015 09:35
Last report received from DTMR: 2015-05-08T09:35:14
GREENMOUNT HIRSTVALE ROAD, ASCOT, 4007 - Special Event All directions Lockyer Antique Motor Association Tractor Trek. Commencing: 8 August 2015 at 09.00AM Concluding:9 August 2015 at 05.00PM No blockage No delays expected. Proceed with caution. Motorists are advised that the following roads may have an increase in traffic volumes; Gatton Clifton Road, Greenmount Hirstvale Road, Nobby Connection Road and Mount Sylvia Road. For more information please visit http://lama.org.au/tagged/events Last edited: 21 May 2015 08:51
Last report received from DTMR: 2015-05-21T08:51:28
GATTON HELIDON ROAD, GATTON, 4343 - Special Event All directions Cunningham Classic Cycle Race. Commencing: 1 August 2015 at 09.00AM Concluding: 1 August 2015 at 05.00PM Partial lane closures No delays expected. Proceed with caution. Motorists are advised to use caution when travelling on the following roads, as there will be an increase in cyclist volumes. Gatton Helidon Road, Gatton Clifton Road, New England Highway, Clifton Leyburn Road, Toowoomba Karara Road, Leyburn Cunningham Road, Ryeford Pratten Road, Dalrymple Creek Road, Warwick Allora Road. For further information on what roads will be affected please visit www.cunninghamclassic.com.au Last edited: 21 May 2015 09:11
Last report received from DTMR: 2015-05-21T09:11:39
WARREGO HIGHWAY, KINGSTHORPE, 4400 - Special Event Both Directions CRT FARMFEST 2015 Warrego Highway, between Gowrie Mountain School Road and Brimblecombe Road. Commencing: 30 May 2015 Concluding: 07 June 2015 All lanes affected No delays expected. Changed traffic conditions. Between 30 May 2015 and 01 June 2015 Reduced Speed 80km/hr, between Gowrie Mountain School Road and Brimblecombe Road. Between 02 June 2015 and 04 June 2015 Reduced Speed 60km/hr, between Gowrie Mountain School Road and Brimblecombe Road. Between 05 June 2015 and 07 June 2015 Reduced Speed 80km/hr, between Gowrie Mountain School Road and Brimblecombe Road. For more information on this event please vist:- http://www.farmonline.com.au/events/farmfest/home/feature/159 Last edited: 25 May 2015 11:19
Last report received from DTMR: 2015-05-25T11:19:37
Far North
Incidents
GRAFTON STREET, CAIRNS CITY, 4870 - Signal fault Hazard All directions Intersection of Spence Street and Grafton Street. All lanes affected Unknown traffic impact. Proceed with caution. Last edited: 28 May 2015 10:19
Last report received from DTMR: 2015-05-28T10:20:02
PORTLAND ROAD, LOCKHART, 4871 - Potholes or road surface damage Hazard Both Directions River crossings subject to flash flooding. Do not drive into flood waters. Road otherwise open subject to rough surface. Drive according to conditions. Unknown traffic impact. Do not drive in flood waters. Contact Lockhart River Aboriginal Shire Council 4 0 6 0 7 1 4 4 Last edited: 15 Apr 2015 12:00
Last report received from DTMR: 2015-04-15T12:00:35
MALANDA MILLAA MILLAA ROAD, MILLAA MILLAA, 4886 - Potholes or road surface damage Hazard Road shoulder slip in vicinity of Gillies Avenue. Travel with care. Traffic management in place and temporary traffic lights to be installed. One lane closed Delays expected. Proceed with caution. Last edited: 21 Feb 2015 07:57
Last report received from DTMR: 2015-02-21T07:57:12
Road Closures/Load Limits
ENDEAVOUR VALLEY ROAD, COOKTOWN, 4895 - Isabella Creek and other creeks and crossings. Open (with caution) proceed with caution. Last edited: 28 May 2015 07:09 Next update:as conditions change
Last report received from DTMR: 2015-05-28T07:09:01
GREGORY DEVELOPMENTAL ROAD, EINASLEIGH, 4871 - The Lynd to Einasleigh Open (with caution) proceed with caution. Last edited: 28 May 2015 07:09 Next update:as conditions change
Last report received from DTMR: 2015-05-28T07:09:00
PENINSULA DEVELOPMENTAL ROAD, LAURA, 4871 - Laura to Coen Open (with caution) proceed with caution. Last edited: 28 May 2015 07:08 Next update:as conditions change
Last report received from DTMR: 2015-05-28T07:08:59
PENINSULA DEVELOPMENTAL ROAD, COEN, 4871 - Coen Airport to Weipa Open (with caution) do not drive in flood waters. Last edited: 28 May 2015 07:08 Next update:as conditions change
Last report received from DTMR: 2015-05-28T07:08:58
BURKE DEVELOPMENTAL ROAD, HIGHBURY, 4871 - 40 km east of Dunbar to Mungana turnoff Open (with caution) do not drive in flood waters. Last edited: 28 May 2015 07:08 Next update:as conditions change
Last report received from DTMR: 2015-05-28T07:08:55
KENNEDY HIGHWAY, UPPER BARRON, 4883 - 21km from Atherton Open (with caution) Reduced lanes due to land slip.Last edited: 28 May 2015 07:08 Next update:as conditions change
Last report received from DTMR: 2015-05-28T07:08:54
MULGRAVE ROAD, PARRAMATTA PARK, 4870 - Between Buchan St and Severin St. Buses Excepted. Subject to a 25 tonne GVM limit Due to road works for drain replacement under the road, a 25 tonne load limit has been placed on Mulgrave Rd between Buchan St and Aumuller St Buses are excepted.Last edited: 28 May 2015 07:08 Next update:as conditions change
Last report received from DTMR: 2015-05-28T07:08:52
Roadworks
CAPTAIN COOK HIGHWAY, CLIFTON BEACH, 4879 - Planned Roadworks Outbound Commencing: 20 May 7:00pm Concluding:June 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Night Works from 7:00pm - 6:00am Last edited: 15 May 2015 12:56
Last report received from DTMR: 2015-05-15T12:57:25
KENNEDY HIGHWAY, MAREEBA, 4880 - Planned Roadworks All directions Malone Road and Godfrey Road intersection upgrade works. Commencing: 13 May 6:30am Concluding:June 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Last edited: 08 May 2015 12:55
Last report received from DTMR: 2015-05-08T12:55:29
KENNEDY HIGHWAY, MACALISTER RANGE, 4871 - Planned Roadworks Both Directions Asphalt works. Commencing: Sunday 10 May 9:00am Concluding:Friday 15 May 3:00pm Single lane in operation Delays expected. Allow extra travel time. Last edited: 06 May 2015 12:23
Last report received from DTMR: 2015-05-06T12:23:43
BRINSMEAD KAMERUNGA ROAD, KAMERUNGA, 4870 - Planned Roadworks Both Directions Intersection of Harley Street. Commencing: 11 May Concluding:July 2015 Both lanes affected Unknown traffic impact. Changed traffic conditions. Last edited: 05 May 2015 16:20
Last report received from DTMR: 2015-05-05T16:20:27
SHIPTONS FLAT ROAD, ROSSVILLE, 4895 - Planned Roadworks Both Directions Wallaby Creek Bridge Repairs. Commencing: 26 May 6:30am Concluding:mid July 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Last edited: 12 May 2015 12:49
Last report received from DTMR: 2015-05-12T12:50:14
MULGRAVE ROAD, PARRAMATTA PARK, 4870 - Planned Roadworks Both Directions Between Severin Street and Gregory Street. Commencing: 30 April 2015, at 12:00am Concluding:13 July 2015, at 12:00am Partial lane closures Delays expected. Proceed with caution. Reconstruction of culverts. Works commence 27 April 2015 to 13 July 2015 Last edited: 30 Apr 2015 13:02
Last report received from DTMR: 2015-04-30T13:02:21
MULLIGAN HIGHWAY, DESAILLY, 4871 - Planned Roadworks Both Directions McLeod River Bridge. Commencing: in progress Concluding:2 May 2015 at 3pm One lane closed Unknown traffic impact. Changed traffic conditions. For the safety of work crews and road users, bridge closures of no more than thirty minutes will be required each day from 30 April 2015 to 2 May 2015. For the convenience of road users, crews will limit these closures between 10:00am and 3:00pm. Road users should expect delays during this time and plan their trips accordingly. Last edited: 28 Apr 2015 12:26
Last report received from DTMR: 2015-04-28T12:26:24
MULLIGAN HIGHWAY, MOUNT MOLLOY, 4871 - Planned Roadworks All directions Pavement rehabilitation works from Brown Street to Mossman Mt Molloy Road. Commencing: in progress Concluding:Mid May 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Last edited: 24 Apr 2015 07:46
Last report received from DTMR: 2015-04-24T07:46:15
CAPTAIN COOK HIGHWAY, SHANNONVALE, 4873 - Planned Roadworks Both Directions Vicinity of Bonnie Doon Road to Shannonvale Road. Commencing: in progress Concluding:mid June 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Last edited: 12 May 2015 08:30
Last report received from DTMR: 2015-05-12T08:31:12
KENNEDY HIGHWAY, RAVENSHOE, 4888 - Planned Roadworks Both Directions From Millstream Bridge to Millstream Falls Road. Commencing: in progress Concluding:mid June 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Last edited: 08 May 2015 07:00
Last report received from DTMR: 2015-05-08T07:00:56
BRUCE HIGHWAY, SOUTH INNISFAIL, 4860 - Planned Roadworks Southbound Intersection upgrade at Mourilyan Road and Rifle Range Roads. Commencing: in progress Concluding:May 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. No left turn for southbound traffic from Bruce Highway into Mourilyan Rd from Tuesday 17 February 2015 Last edited: 24 Apr 2015 07:48
Last report received from DTMR: 2015-04-24T07:48:36
MOSSMAN MOUNT MOLLOY ROAD, MOUNT MOLLOY, 4871 - Planned Roadworks Both Directions Pavement rehabilitation works. Commencing: in progress Concluding:June 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Temporary traffic signals in operation Last edited: 24 Apr 2015 07:46
Last report received from DTMR: 2015-04-24T07:46:50
ENDEAVOUR VALLEY ROAD, COOKTOWN, 4895 - Planned Roadworks Both Directions Commencing: in progress Concluding:mid May 2015 Lane or lanes reduced Delays expected. Changed traffic conditions. Last edited: 24 Apr 2015 07:52
Last report received from DTMR: 2015-04-24T07:51:59
BRUCE HIGHWAY, KENNEDY, 4816 - Planned Roadworks Both Directions Between Cairns Rd to Maitland Rd. Commencing: in progress Concluding:May 2015 One lane closed Unknown traffic impact. Changed traffic conditions. Last edited: 14 Jan 2015 07:53
Last report received from DTMR: 2015-01-14T07:53:34
Special Events
MAREEBA DIMBULAH ROAD, MAREEBA, 4880 - Special Event Both Directions Mareeba Rodeo Grounds for FNQ Field Days. Commencing: 27 May 7:30am Concluding:28 May 6:00pm Partial lane closures Delays expected. Traffic control on scene. Traffic controllers will b managing traffic entering and exiting car park Last edited: 30 Apr 2015 11:49
Last report received from DTMR: 2015-04-30T11:49:10
Fitzroy
Incidents
BRUCE HIGHWAY, PORT CURTIS, 4700 - Congestion Both Directions Yeppen South Project between Burnett Highway intersection at Egan's Hill and the Yeppen Roundabout (south of Rockhampton). All lanes affected Delays expected. Allow extra travel time. Intermittment delays will be experienced between 9am and 1pm weekdays due to between two to four road closures per day to transport girders to construction site. Stop-Go traffic control on site, maximum closure of 10 minutes each movement. Commencing Friday 24 April 2015. Last edited: 19 May 2015 14:23
Last report received from DTMR: 2015-05-19T14:24:03
BRUCE HIGHWAY, MIRIAM VALE, 4677 - Potholes or road surface damage Hazard Both Directions Approximately 2 kilometres north of Miriam Vale at Norton's Corner. Speed restrictions in place. Motorists are advised to obey all signage and drive to conditions. No delays expected. Reduced speed limit (80km/h). Last edited: 09 May 2015 09:56
Last report received from DTMR: 2015-05-09T09:57:27
Road Closures/Load Limits
GLADSTONE MONTO ROAD, CALLIOPE, 4680 - Calliope to Many Peaks. 4-Wheel Drive local traffic only. Open (with caution) proceed with caution. Last edited: 25 Mar 2015 13:46 Next update:as conditions change
Last report received from DTMR: 2015-03-25T13:46:23
Roadworks
FITZROY BRIDGE, ROCKHAMPTON CITY, 4700 - Planned Roadworks Northbound Commencing: 25 May 2015, at 9:00am Concluding:30 May 2015, at 6:00pm Partial lane closures Delays expected. Allow extra travel time. Under bridge works will be undertaken between 9am and 3pm daily. Last edited: 19 May 2015 14:21
Last report received from DTMR: 2015-05-19T14:22:09
GEORGE STREET, ROCKHAMPTON CITY, 4700 - Planned Roadworks All directions Traffic signal upgrade at the George St / Denham St intersection. Commencing: 18 May 2015, at 6:00am Concluding:31 July 2015, at 6:00pm Partial lane closures Delays expected. Traffic control on scene. Day and night works. Last edited: 12 May 2015 13:03
Last report received from DTMR: 2015-05-12T13:04:39
BURNETT HIGHWAY, GRACEMERE, 4702 - Planned Roadworks Both Directions Intersection of Burnett Highway and Bruce Highway. Commencing: 18 May 12:00am Concluding:30 July 2015, at 12:00pm Road closed both directions No delays expected. Use alternative route. Access between the Bruce Highway and Burnett Highway is closed to all traffic, with a detour in place via Gavial-Gracemere Road. Last edited: 18 May 2015 15:59
Last report received from DTMR: 2015-05-18T15:59:25
DAWSON HIGHWAY, KIN KORA, 4680 - Planned Roadworks All directions Kin Kora roundabout. Commencing: 12 May 2015, at 11:58am Concluding:29 January 2016, at 6:00pm Partial lane closures Delays expected. Changed traffic conditions. Works to upgrade the Dawson Highway / Philip Street intersection are underway. There will be not traffic impacts during daytime hours however lane closures will occur at night. Traffic control will be in place. Last edited: 12 May 2015 11:59
Last report received from DTMR: 2015-05-12T12:03:38
BRUCE HIGHWAY, RAGLAN, 4697 - Planned Roadworks Bruce Highway / Gentle Annie Road intersection. Commencing: 28 April 2015, at 6:00am Concluding:19 June 2015, at 6:00pm Single lane in operation Delays expected. Changed traffic conditions. 24hours traffic control in place. Last edited: 22 Apr 2015 11:17
Last report received from DTMR: 2015-04-22T11:17:24
BRUCE HIGHWAY, PORT CURTIS, 4700 - Planned Roadworks Both Directions Commencing: 17 February 2015, at 12:00am Concluding:30 July 2015, at 12:00am No blockage No delays expected. Observe signage. Traffic changes will be introduced at the Yeppen South project, south of Rockhampton, from 17 February 2015. From this date, access between the Bruce Highway and Burnett Highway will be closed to all traffic, with a detour in place via Gavial-Gracemere Road. Last edited: 11 Feb 2015 09:34
Last report received from DTMR: 2015-02-11T09:34:42
BRUCE HIGHWAY, PORT CURTIS, 4700 - Planned Roadworks Both Directions Bruce Highway - Egans Hill to Yeppen Roundabout. Commencing: 10 April 10:29am Concluding:31 March, at 12:00am No delays expected. Changed traffic conditions. Construction has commenced on the $296 million Yeppen South project between Egans Hill and Yeppen roundabout, south of Rockhampton. Speed restrictions are in place. Last edited: 10 Apr 2014 10:30
Last report received from DTMR: 2014-04-10T10:30:46
Mackay/Whitsunday
Roadworks
BRUCE HIGHWAY, FARLEIGH, 4741 - Planned Roadworks Both Directions Asphalt works on sections of the Bruce Highway between cane railway crossing (north of Sugarshed Road) and the Conningsby School access.. Commencing: 27 May 2015, at 8:31am Concluding:04 June 2015, at 12:00am Partial lane closures Delays expected. Observe signage. Last edited: 27 May 2015 08:33
Last report received from DTMR: 2015-05-27T08:33:43
MACKAY EUNGELLA ROAD, MARIAN, 4753 - Planned Roadworks Mt Vince Road intersection will be closed to assist in managing traffic on the approach to the roadworks.. Commencing: 21 May 2015, at 4:34pm Concluding:15 July 2015, at 12:00am No delays expected. Use alternative route. Last edited: 21 May 2015 16:35
Last report received from DTMR: 2015-05-21T16:35:54
MILTON STREET, MACKAY, 4740 - Planned Roadworks Southbound Emergency excavation works being undertaken by Ergon. Southbound left turning lane and through lane closure.. Commencing: 21 May 2015, at 4:22pm Concluding:31 May 2015, at 12:00am Lane or lanes reduced Delays expected. Use alternative route. Last edited: 21 May 2015 16:22
Last report received from DTMR: 2015-05-21T16:23:06
CHRISTENSENS ROAD, BALBERRA, 4740 - Planned Roadworks Both Directions Commencing: 20 May 2015, at 12:35pm Concluding:30 June 2015, at 12:00am Partial lane closures Delays expected. Changed traffic conditions. Last edited: 20 May 2015 12:35
Last report received from DTMR: 2015-05-20T12:36:02
GORDON STREET EXIT, MACKAY, 4740 - Planned Roadworks All directions Showgrounds and Shakespeare Street Intersection upgrades Changed traffic conditions. Commencing: 21 April 2015, at 3:55pm Concluding:31 October 2015, at 12:00am Partial lane closures Delays expected. Proceed with caution. Last edited: 21 Apr 2015 15:56
Last report received from DTMR: 2015-04-21T15:56:15
BRUCE HIGHWAY, MACKAY, 4740 - Planned Roadworks All directions Showgrounds and Shakespeare Street Intersection upgrades Changed traffic conditions. Commencing: 21 April 2015, at 3:53pm Concluding:31 October 2015, at 12:00am Partial lane closures Delays expected. Changed traffic conditions. Last edited: 21 Apr 2015 15:54
Last report received from DTMR: 2015-04-21T15:54:12
SHAKESPEARE STREET, MACKAY, 4740 - Planned Roadworks All directions Showgrounds and Shakespeare Street Intersection upgrades Changed traffic conditions. Commencing: 21 April 2015, at 3:50pm Concluding:31 October 2015, at 12:00am Partial lane closures Delays expected. Observe signage. Last edited: 21 Apr 2015 15:50
Last report received from DTMR: 2015-04-21T15:51:00
BRUCE HIGHWAY, ILBILBIE, 4738 - Planned Roadworks Both Directions Shoulder widening and line marking either side of Ilbilbie. Motorists can expect short term lane closures and reduced speed limits of 60kph.. Commencing: 13 April 2015, at 6:00am Concluding:30 June 2015, at 12:00am Partial lane closures No delays expected. Reduced speed limit (60km/h). Please drive carefully through roadworks. Last edited: 02 Apr 2015 14:12
Last report received from DTMR: 2015-04-02T14:12:17
MACKAY EUNGELLA ROAD, MIRANI, 4754 - Planned Roadworks Both Directions Adjacent to Melba House. Commencing: 07 April 2015, at 6:30am Concluding:30 June 2015, at 5:30pm Partial lane closures Delays expected. Reduced speed limit (40km/h). Rehabilitation, shoulder widening and safety improvement works. 6am - 5.30pm Last edited: 26 Mar 2015 14:21
Last report received from DTMR: 2015-03-26T14:21:57
Metropolitan
Incidents
GYMPIE ROAD, KEDRON, 4031 - Multi-vehicle Crash Northbound Right lane after Kitchener Road. Partial lane closures Delays expected. Proceed with caution. Last edited: 28 May 2015 17:39
Last report received from DTMR: 2015-05-28T17:40:13
LOGAN MOTORWAY, LARAPINTA, 4110 - Congestion Eastbound No blockage Delays expected. Motorists are urged to show patience. Allow extra travel time Last edited: 28 May 2015 17:23
Last report received from DTMR: 2015-05-28T17:23:42
LINK STREET, UPPER MOUNT GRAVATT, 4122 - Multi-vehicle Crash Both Directions Near Logan Road. Partial lane closures No delays expected. Proceed with caution. Last edited: 28 May 2015 17:08
Last report received from DTMR: 2015-05-28T17:09:14
IPSWICH MOTORWAY, ROCKLEA, 4106 - Congestion Westbound Between Rocklea and Oxley. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:53
Last report received from DTMR: 2015-05-28T16:54:19
PACIFIC MOTORWAY, EIGHT MILE PLAINS, 4113 - Congestion Southbound From Eight Mile Plains to Slacks Creek. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:43
Last report received from DTMR: 2015-05-28T16:44:21
GATEWAY MOTORWAY, NUDGEE, 4014 - Congestion Northbound Congestion between Nudgee and Bracken Ridge due to earlier fire. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:39
Last report received from DTMR: 2015-05-28T16:39:55
PACIFIC MOTORWAY, WOOLLOONGABBA, 4102 - Congestion Northbound From Woolloongabba to Brisbane City. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:32
Last report received from DTMR: 2015-05-28T16:33:11
PACIFIC MOTORWAY, BRISBANE CITY, 0000 - Congestion Southbound From Brisbane City to Greenslopes. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:23
Last report received from DTMR: 2015-05-28T16:24:12
WESTERN FREEWAY, INDOOROOPILLY, 4068 - Congestion Outbound To Fig Tree Pocket. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:09
Last report received from DTMR: 2015-05-28T16:10:01
SAMFORD ROAD, MITCHELTON, 4053 - Signal fault Hazard Both Directions Power outage affecting traffic lights. No blockage No delays expected. Proceed with caution. Last edited: 28 May 2015 16:03
Last report received from DTMR: 2015-05-28T16:04:15
LOGAN MOTORWAY, DREWVALE, 4116 - Congestion Westbound Beaudesert Road Off Ramp. Delays expected. Allow extra travel time. Last edited: 28 May 2015 15:26
Last report received from DTMR: 2015-05-28T15:49:45
Roadworks
SWANBANK ROAD, RACEVIEW, 4305 - Planned Roadworks Cunningham Highway. Commencing: 30 May 2015, at 6:00am Concluding:31 May 2015, at 12:00pm All lanes affected Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) is carrying out works to repair damaged sections of the Swanbank Road Bridge overpass at the Cunningham Highway interchange in Swanbank. For the safety of road users and onsite workers a full closure of the Swanbank Road Bridge overpass will be required. The closure will occur from 6:00am Saturday 30 May 2015 to 12:00pm Sunday 31 May 2015, weather and construction condition permitting. What to expect during these works: • changed traffic conditions, motorists will be required to use either the Ripley Road or Redbank Road overpasses • stop and go traffic control and detour signage to direct motorists Every effort will be made to keep disruptions to a minimum and TMR appreciates your patience while these important works are being carried out. If you require any further information on this project please contact the Metropolitan Region by email at: metropolitanregion@tmr.qld.gov.au during business hours. Alternatively, please contact the Department of Transport and Main Roads on 13QGOV (13 74 68) during business hours. For up-to-date information on road closures and traffic conditions across Queensland, please visit www.131940.qld.gov.au or call 131940. Last edited: 27 May 2015 11:23
Last report received from DTMR: 2015-05-27T11:25:16
MOUNT GRAVATT CAPALABA ROAD, WISHART, 4122 - Planned Roadworks Both Directions Commencing: 26 May 2015, at 8:00pm Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. Motorists are advised that works to complete asphalting, medians, line marking and signals on Mt Gravatt-Capalaba Road between Broadwater and Gardner Roads are continuing in various locations on site during May and June 2015, weather and construction conditions permitting. In order to minimise disruption to traffic and ensure the safety of motorists and road workers, some of these works will be required to take place during night works. Night time construction activities may occur between 8pm and 5am, up to five nights per week. Changed traffic conditions and traffic management, including reduced speed limits and lane closure, will be required during these works. Minor delays may also be experienced due to some shoulder, lane and ramp closures that may occur off-peak and at night. Motorists are reminded to pay attention, follow the direction of signage and traffic controllers and be aware of changed traffic conditions. For further information contact the project team on 1800 799 686. Further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth Last edited: 26 May 2015 19:39
Last report received from DTMR: 2015-05-26T19:40:12
ALLAWAH ROAD, CHUWAR, 4306 - Planned Roadworks Both Directions Mount Crosby Weir Bridge - changed traffic conditions. Commencing: 25 May 2015, at 9:39am Concluding:25 May 2017, at 6:00am No blockage No delays expected. Changed traffic conditions. •Traffic conditions along the Mount Crosby Weir Bridge will change from May 2015 as a precaution for the community in the interest of safety. •A 9 tonne weight limit has been imposed on Mount Crosby Weir Bridge from 2 May 2015. •The weight limit and 20kph speed limit for the bridge are required to protect public safety. •Exceptions to the weight limit and speed cannot be made. •Any vehicle that exceeds the 9 tonne weight limit should consider an alternative route. •Changes to signage will be installed to inform the local community of these changes. #106 Last edited: 25 May 2015 09:42
Last report received from DTMR: 2015-05-25T09:42:29
SANDGATE ROAD, CLAYFIELD, 4011 - Planned Roadworks Junction Road. Commencing: 24 May 2015, at 12:00am Concluding:30 May 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of works for the Sandgate and Junction Roads intersection upgrade at Clayfield. The location and timing of these works are as follows: • Franz Road and Junction Road intersection, commencing Monday 25 May from 9:30am to 3:00pm, for approximately three weeks, weather and construction conditions permitting. • Sandgate and Junction Road Intersection, commencing Sunday 24 May 2015 from 7:00pm to 5:00am for approximately one week, weather and construction conditions permitting. Motorists may experience short traffic delays, lane closures and reduced speed limits during the works. Traffic control will be in place to ensure the safety of road workers and motorists. Last edited: 19 May 2015 15:32
Last report received from DTMR: 2015-05-19T15:32:23
BRADFIELD HIGHWAY, KANGAROO POINT, 4169 - Planned Roadworks All directions Story Bridge. Commencing: 23 May 2015, at 6:00am Concluding:30 May 2015, at 5:00pm Two lanes blocked Delays expected. Use alternative route. The Story Bridge will be reduced to two lanes in each direction between 6:00am and 5:00pm on Saturday 23rd and Sunday 24th May and also Saturday 30th and Sunday 31st May 2015. Motorists are to expect moderate delays during this time. For any other information, please contact 3043 8888. Last edited: 08 May 2015 15:29
Last report received from DTMR: 2015-05-08T15:29:15
CUNNINGHAM HIGHWAY, WILLOWBANK, 4306 - Planned Roadworks At the Mount Walker Creek Bridge. Commencing: 11 May 2015, at 12:00am Concluding:30 June 2015, at 12:00am Partial lane closures No delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) will be undertaking repair works on Mt Walker Creek Bridge to improve safety. Construction works will occur between 6:00am to 6:00pm, Monday to Friday and are expected to start in mid May 2015 and will continue through unti late June 2015, weather and construction conditions permitting. Motorists may experience short traffic delays, lane closures and reduced speed limits during the works. Traffic control will be in place to ensure the safety of road workers and motorists. Every effort will be made to keep disruptions to a minimum and TMR appreciates your patience while these important works are being carried out. Please slow down – roadwork is your responsibility too. If you require further information on this project, please contact Metropolitan Region by email metropolitanregion@tmr.qld.gov.au during business hours. Alternatively, please contact the Department of Transport and Main Roads on 13QGOV (13 74 68) during business hours. Last edited: 05 May 2015 13:55
Last report received from DTMR: 2015-05-05T14:03:25
MOGGILL ROAD, INDOOROOPILLY, 4068 - Planned Roadworks Southbound Moggill Road, Indooroopilly, Western Freeway on and off-ramps at Moggill Road, Indooroopilly Russell Terrace, Indooroopilly Centenary Bikeway . Commencing: 10 May 2015, at 8:00pm Concluding:25 May 2016, at 5:00am Road closed single direction Delays expected. Changed traffic conditions. Motorists are advised that the southbound on-ramp to the Western Freeway from Moggill Road will be temporarily closed from 8pm to 5am, Sunday to Thursday nights from Sunday 10 May to Thursday 24 May, 2015, weather permitting, as part of works for the Moggill Road cycle bridge.During this closure, a detour will be in place for motorsists wishing to travel south on the Centenary Motorway from Moggill Road. Motorists will continue on Moggill Road, detouring onto Fig Tree Pocket Road before entering the Motorway southbound at Fig Tree Pocket. Signage will be in place to guide motorists during this detour. Traffic management including reduced speed limits and signage will be in place during the closure. Minor delays may be expected. For further information please call 13 QGOV (13 7468) Last edited: 06 May 2015 11:53
Last report received from DTMR: 2015-05-06T11:53:51
OLD NORTHERN ROAD, EVERTON PARK, 4053 - Planned Roadworks Outbound Commencing: 01 May 2015, at 8:00pm Concluding:31 May 2015, at 5:00am One lane closed Delays expected. Traffic control on scene. Developer works will be carried out during May between 8pm and 5am, weather and construction conditions permitting. Works will include upgrades to stormwater drainage. Changed traffic conditions may include reduced speed limits through the worksite and possible lane closures to facilitate the work. Traffic control will be onsite as required. Last edited: 07 Apr 2015 12:35
Last report received from DTMR: 2015-04-07T12:35:52
OLD CLEVELAND ROAD, CHANDLER, 4155 - Planned Roadworks Both Directions Commencing: 19 April 2015, at 7:00pm Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) will be undertaking cycle lane safety improvement work along Old Cleveland Road through Carindale, Belmont, Chandler and Capalaba West. Works will be carried out from Mid April 2015 to late June 2015, weather and construction conditions permitting. Overnight works will be between 7pm to 5am, Sunday to Thursday nights. Night works are undertaken for safety and traffic management reasons. Occasional day works will be undertaken between 6am to 6pm, Monday to Friday. Works will include: • installing green bicycle pavement markings • linemarking • pavement widening on Old Cleveland Road What to expect during works: • minor traffic delays (reduced speed limits, temporary lane closures) • additional work lighting • some dust and vibration • minimal noise (from the use of machinery and reversing vehicle beepers). Safety: Traffic control will also be in place to ensure the safety of pedestrians, motorists and road workers. Please follow the direction of roadside signs and traffic controls. Nearby residents may experience additional work lighting, noise from the use of machinery and reversing beepers on vehicles on some nights. Last edited: 10 Apr 2015 19:16
Last report received from DTMR: 2015-04-10T19:16:17
SANDGATE ROAD, NUNDAH, 4012 - Planned Roadworks Both Directions Sandgate Road from Nundah, Virginia, Northgate, Boondall, and Deagon. Starting at Sangate Road, corner of Eton Street Nundah through to Radley Street, Deagon. . Commencing: 19 April 2015, at 7:00pm Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) will be undertaking safety improvement work for cyclists and pedestrians along Sandgate Road through Nundah, Northgate, Virginia, Boondall and Deagon. Works will be carried out from Mid April 2015 to late June 2015, weather and construction conditions permitting. Overnight works will be between 7pm to 5am, Sunday to Thursday nights for cycle safety works. Night works are undertaken for safety and traffic management reasons. Occasional day works will be undertaken between 9am to 3pm, Monday to Friday for pedestrian safety work. Works will include: • realigning and reconstructing the traffic island and median • linemarking • installing green bicycle pavement markings • installing kerb ramps • tactile ground surface indicators – for pram ramps • removing and reinstating signage and road marking as required • fence upgrade (Jeffcott Street and Hamilton Road, Nundah). What to expect during works: • minor traffic delays (reduced speed limits, temporary lane closures) • additional work lighting • some dust and vibration • minimal noise (from the use of machinery and reversing vehicle beepers). Safety: Traffic control will also be in place to ensure the safety of pedestrians, motorists and road workers. Please follow the direction of roadside signs and traffic controls. Nearby residents may experience additional work lighting, noise from the use of machinery and reversing beepers on vehicles on some nights. Last edited: 10 Apr 2015 19:22
Last report received from DTMR: 2015-04-10T19:22:01
SOUTH EAST BUSWAY, WOOLLOONGABBA, 4102 - Planned Roadworks Both Directions Between Woolloongabba and Upper Mount Gravatt. Commencing: 16 April 2015, at 8:00pm Concluding:30 June 2015, at 6:00pm Partial lane closures Delays expected. The Department of Transport and Main Roads will be undertaking safety improvement works on the South East Busway, between Woolloongabba and Upper Mount Gravatt, from mid-April until late June 2015. Work will be undertaken at night, Sunday to Thursday. Work on Sundays will take place between 7pm and 4:45am, work from Monday to Thursday will take place between 8pm and 4:45am, weather and construction conditions permitting. Bus services will continue to operate, however some minor delays to services between 8pm to 12am will be experienced. Some temporary closures to the Holland Park Bus Station and Klumpp Road entrance to the busway will take place during late May and early June. Traffic control will be in place to direct busway users during closures. TMR appreciates your patience while these important works are being carried out. Last edited: 10 Apr 2015 12:01
Last report received from DTMR: 2015-04-10T12:01:22
CUNNINGHAM HIGHWAY, RACEVIEW, 4305 - Planned Roadworks Swanbank Road. Commencing: 13 April 2015, at 8:00pm Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) will carry out works to repair damaged sections of the Swanbank Road Bridge overpass at the Cunningham Highway interchange in Swanbank. Construction works will occur between 6am and 3pm, Monday to Friday and are expected to start in mid April 2015 and will continue through to the end of June 2015, weather and construction conditions permitting. What to expect during these works: * changed traffic conditions on the bridge with traffic down to one lane during construction * the Cunningham Highway outbound lanes will be reduced to one lane during construction * temporary lane closures with diversions in place when required * stop and go traffic controllers (short delays may occur) * possible full closure of the bridge for a period of 24 hours. This may occur on two separate occasions. Further information will be provided about these closures closer to the time. For the safety of road users and onsite workers, night works are required some of the work near the highway. Night works will occur between 8pm and 5am, Monday to Thursday, when required. Every effort will be made to keep disruptions to a minimum and TMR appreciates your patience while these important works are being carried out. Please slow down – roadwork is your responsibility too. If you require further information on this project, please contact Metropolitan Region by email metropolitanregion@tmr.qld.gov.au during business hours. Alternatively, please contact the Department of Transport and Main Roads on 13QGOV (13 74 68) during business hours. #71 Last edited: 20 May 2015 13:29
Last report received from DTMR: 2015-05-20T13:29:12
PACIFIC MOTORWAY ON RAMP, HOLLAND PARK WEST, 4121 - Planned Roadworks Southbound Commencing: 13 April 2015, at 7:00pm Concluding:30 June 2015, at 5:00am Partial lane closures No delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) will be undertaking works on the Gaza Road southbound on-ramp to Pacific Motorway at Holland Park West. These works are undertaken to better control the flow of traffic and enable vehicles to merge safely onto the motorway. Works will be carried out between early April 2015 to late June 2015 between 7pm and 5am, weather and construction conditions permitting. Night works are undertaken for safety and traffic management reasons. Occassional weekend works may be required and may be undertaken between 9am and 3pm, weather and construction conditions permitting. The works involve: o installing ramp signals on the Gaza Road southbound on-ramp to Pacific Motorway to better control the flow of traffic and enable vehicles to merge safely onto the motorway o installing a traffic monitoring camera o extending the length of the kerb by 15m o installing line marking and signage as required.. Changes to traffic conditions are expected during construction hours which includes traffic delays, reduced speed limits, and temporary lane closures. The temporary lane closure which will be in place at night while the works are undertaken will be removed by 5am every day to enable regular flow of traffic during the day. Last edited: 31 Mar 2015 14:00
Last report received from DTMR: 2015-03-31T14:00:38
SANDGATE ROAD, BOONDALL, 4034 - Planned Roadworks Between Garozzo Street and Roscommon Road . Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on selected traffic islands at Boondall from mid May to June 2015 (weather and roadwork conditions permitting) along Sandgate Road between Garozzo Street and Roscommon Road. Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:21
Last report received from DTMR: 2015-04-10T14:21:29
LOGAN ROAD, UPPER MOUNT GRAVATT, 4122 - Planned Roadworks Between Kessels Road and MacGregor Street . Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on selected traffic islands along Logan Road (between Kessels Road and MacGregor Street)at Upper Mount Gravatt from mid April to mid June 2015 (weather and roadwork conditions permitting). Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:21
Last report received from DTMR: 2015-04-10T14:21:58
ROUEN ROAD, BARDON, 4065 - Planned Roadworks Along Rouen Road between Birdwood Terrace and Vimy Street, Boundary Road roundabout at the intersection of Latrobe and MacGregor terraces. . Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on selected traffic islands in Bardon from mid May and the end of June 2015 (weather and road work conditions permitting) at the folllowing locations: •along Rouen Road (between Birdwood Terrace and Vimy Street) •Boundary Road •roundabout at the intersection of Latrobe and MacGregor terraces. Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:25
Last report received from DTMR: 2015-04-10T14:25:10
OLD CLEVELAND ROAD, CARINDALE, 4152 - Planned Roadworks Near the Gateway Motorway at Carindale and Belmont . Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on selected traffic islands along Old Cleveland Road (near the Gateway Motorway) at Carindale and Belmont during June 2015, weather and roadwork conditions permitting. Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:29
Last report received from DTMR: 2015-04-10T14:29:48
CENTENARY HIGHWAY, RIPLEY, 4306 - Planned Roadworks At Deebing Heights and Ripley at the following roundabouts Ripley Road and Grampion Drive. . Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on selected traffic islands along the Centenary Motorway at Deebing Heights and Ripley between mid April and the end of June 2015 (weather and roadwork conditions permitting) at the following roundabouts: •Ripley Road •Grampion Drive. Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:25
Last report received from DTMR: 2015-04-10T14:25:41
KESSELS ROAD, COOPERS PLAINS, 4108 - Planned Roadworks Kessels Road between Estoril Street and Launceston Street Intersection of Riawena and Orange Grove roads Intersection of Granard, Riawena and Beaudesert roads. Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on selected traffic islands in Coopers Plains from mid April to mid June 2015 (weather and roadwork conditions permitting) at the following locations: •Kessels Road between Estoril Street and Launceston Street •Intersection of Riawena and Orange Grove roads •Intersection of Granard, Riawena and Beaudesert roads. Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:26
Last report received from DTMR: 2015-04-10T14:26:03
COLBURN AVENUE, VICTORIA POINT, 4165 - Planned Roadworks At the junction of Colburn Avenue and Point O’Halloran Road. Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on the traffic island at the junction of Colburn Avenue and Point O'Halloran Road, Victoria Point during June 2015, weather and roadwork conditions permitting. Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:26
Last report received from DTMR: 2015-04-10T14:26:38
FINUCANE ROAD, ALEXANDRA HILLS, 4161 - Planned Roadworks Finucane Road between Old Cleveland Road and MacDonald Road Roundabout at Boundary Road and Redland Bay Road Roundabout at Mount Cotton Road and Boundary Road Roundabout at Cleveland-Redland Bay Road and Boundary Road.. Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on selected traffic islands in Alexandra Hills from May to the end of June 2015 (weather and road work conditions permitting) at the following locations: •Finucane Road between Old Cleveland Road and MacDonald Road •Roundabout at Boundary Road and Redland Bay Road •Roundabout at Mount Cotton Road and Boundary Road •Roundabout at Cleveland-Redland Bay Road and Boundary Road. Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:26
Last report received from DTMR: 2015-04-10T14:26:22
MOGGILL ROAD, BELLBOWRIE, 4070 - Planned Roadworks Intersection with Birkin Road. Commencing: 13 April 2015, at 5:00am Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of maintenance works on traffic islands in Bellbowrie at the intersection of Moggill and Birkin roads during May 2015 (weather and roadwork conditions permitting). Works will involve the removal of vegetation and existing materials from the traffic islands and replacing it with new concrete. By improving the islands, TMR will increase road safety and reduce overgrown vegetation impacting visibility for motorists. What to expect: •temporary partial lane closures with reduced speed limits •possible underground service relocation for some islands •stop and go traffic controllers (short delays may occur) •every effort will be made to minimise impacts where possible. These may include noise, dust and vibration. For the safety of road users and onsite workers, these works will occur at night between Sunday and Friday from 7pm to 5am. TMR asks all road users to drive carefully, expect on-road changes, and follow the direction of roadside signs and traffic controllers during works. There may be some temporary traffic delays during works and road users are requested to drive safely and allow for additional travel time through worksites. If you require further information on this project, please contact the project team on 07 3297 4640 or by email metropolitanregion@tmr.qld.gov.au during business hours. For information during construction hours please contact the project manager on 0457 525 539.. Last edited: 10 Apr 2015 14:31
Last report received from DTMR: 2015-04-10T14:31:50
MOGGILL ROAD, INDOOROOPILLY, 4068 - Planned Roadworks Both Directions Commencing: 10 April 2015, at 10:00am Concluding:01 February 2016, at 5:00pm No blockage No delays expected. Changed traffic conditions. Motorists are advised that construction of the Moggill Road cycle bridge will commence in April 2015 and will continue through to early 2016. Traffic management including reduced speed limits, traffic controllers and devices will be in place where required. To ensure the safety of motorists and workers, some traffic control including shoulder and lane closures will be required at times. For further information about the project, please call 13QGOV. Last edited: 10 Apr 2015 12:51
Last report received from DTMR: 2015-04-10T12:51:53
LOGAN ROAD, EIGHT MILE PLAINS, 4113 - Planned Roadworks Southbound Works on the Logan Road Southbound on-ramp to Pacific Motorway at Eight Mile Plains. Commencing: 07 April 2015, at 7:00pm Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) will be undertaking works on the Logan Road southbound on-ramp to Pacific Motorway at Eight Mile Plains. These works are undertaken to better manage the flow of traffic on the on-ramp and enable vehicles to merge safely onto the motorway. Works will be carried out between early April 2015 and late June 2015 between 7pm and 5am, weather and construction conditions permitting. Night works are undertaken for safety and traffic management reasons. Occasional weekend works may be required and may be undertaken between 9am and 3pm, weather and construction conditions permitting. The works involve: • installing ramp signals on the southbound on-ramp to the Pacific Motorway at Eight Mile Plains, to better manage the flow on the on-ramp and enable vehicles to merge safely onto the motorway • on-ramp pavement widening • extending the length of the median kerb between the southbound on-ramp and Pacific Motorway by 10 meters • line marking and signage works as required • installing a traffic monitoring camera. Changes to traffic conditions are expected during construction hours which includes traffic delays, reduced speed limits, and temporary lane closures. The temporary lane closure which will be in place at night while the works are undertaken will be removed by 5am every day to enable regular flow of traffic during the day.       Last edited: 27 Mar 2015 14:56
Last report received from DTMR: 2015-03-27T14:57:07
SOUTHERN CROSS WAY, EAGLE FARM, 4009 - Planned Roadworks All directions Intersection of Fison Avenue West, Eagleview Place and Southern Cross Way off-ramp at Eagle Farm. Commencing: 16 March 2015, at 7:00pm Concluding:30 June 2015, at 5:00am Partial lane closures Delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) will be undertaking safety improvement works to the intersection of Fison Ave West, Eagleview Pl and Southern Cross Way off-ramp at Eagle Farm. Works are expected to be carried out Monday to Friday from mid March to late June 2015, between 7pm to 5am, weather permitting. This safety project involves: Installation of traffic signals on the Southern Cross Way off ramp and Fison Avenue West for vehicles travelling east Improved directional signage and pavement widening Construction of a footpath adjacent to the very northern and very southern lanes of Fison Avenue West TMR apologises for any inconvenience these works may cause and appreciates your patience while these important works are being carried out. #47 Last edited: 05 Mar 2015 13:33
Last report received from DTMR: 2015-03-05T14:22:15
MOUNT COTTON ROAD, MOUNT COTTON, 4165 - Planned Roadworks Mt Cotton Road between Woodlands Drive and Double Jump Road. Commencing: 16 March 2015, at 7:00pm Concluding:30 June 2015, at 5:00am Partial lane closures No delays expected. Changed traffic conditions. Works will be carried out from late March 2015 until mid 2015, weather and construction conditions permitting. Construction will predominantly be undertaken Monday to Friday between 7pm and 6am to reduce the impact to surrounding residents and motorists. However, some works may need to be undertaken during the day or on weekends for the safety of roadworkers and motorists. Short traffic delays, lane closures and reduced speed limits can be expected during the works. Traffic control will be in place to ensure the safety of road workers and motorists. TMR apologises for any inconvenience these works may cause and appreciates your patience while these important works are carried out. Last edited: 16 Mar 2015 17:51
Last report received from DTMR: 2015-03-16T17:51:15
IPSWICH MOTORWAY, DARRA, 4076 - Planned Roadworks Both Directions Between Darra and Rocklea . Commencing: 12 March 2015, at 1:11pm Concluding:31 May 2015, at 6:00am Partial lane closures Delays expected. Proceed with caution. The Department of Transport and Main Roads (TMR) will carry out works to investigate the location of the existing underground services, ground conditions in the vicinity of Oxley Creek and the composition of the existing motorway pavement. These investigations will provide valuable information for the detailed design for the future upgrade of the motorway between Rocklea and Darra. What to expect during these works: - changed traffic conditions on the motorway including temporary lane closures between 8pm and 5am, Monday to Thursday - construction vehicles and plant operating in the area - residents and businesses may notice increased noise and some task lighting during work hours - minor delays. For the safety of onsite workers and road users, and to minimise disruptions to traffic flow during peak travel times; the pavement investigations will occur at night between 8pm and 5am, Monday to Thursday. Ground investigations will typically occur during the day. Works are expected to start in mid March 2015 and will continue through to mid May 2015, weather and construction conditions permitting. If you require further information on this project, please contact the project team on 1800 204 990 during business hours or by email darra2rocklea@tmr.qld.gov.au. Up-to-date project information is also available at http://www.tmr.qld.gov.au/Projects/Name/I/Ipswich-Motorway-Planning-Study-Darra-to-Rocklea.aspx Alternatively, please contact the Department of Transport and Main Roads on 13QGOV (13 74 68) during business hours. Last edited: 12 Mar 2015 13:15
Last report received from DTMR: 2015-03-12T13:16:11
GATEWAY MOTORWAY, NUDGEE, 4014 - Planned Roadworks Both Directions Commencing: 01 March 2015, at 8:00pm Concluding:01 August 2015, at 5:00am Partial lane closures Delays expected. Allow extra travel time. Night Works are required on the Gateway Motorway between Southern Cross Way, and the Bicentennial exit between 01/032015 and 31/07/2015. Last edited: 24 Feb 2015 13:52
Last report received from DTMR: 2015-02-24T13:52:14
LOGAN ROAD, EIGHT MILE PLAINS, 4113 - Planned Roadworks Commencing: 26 February 2015, at 1:17pm Concluding:30 July 2015, at 5:00pm Single lane in operation Delays expected. Changed traffic conditions. Logan Road Service Road will have changed traffic conditions for approximately 3 months while a new service road is being constructed as part of the Warrigal Road bus solution. #42 Last edited: 26 Feb 2015 13:22
Last report received from DTMR: 2015-02-26T13:22:50
WESTERN FREEWAY, INDOOROOPILLY, 4068 - Planned Roadworks Both Directions Western Freeway, Toowong to Indooroopilly. Commencing: 20 February 2015, at 1:45pm Concluding:30 May 2015, at 12:00pm Delays expected. Allow extra travel time. The Department of Transport and Main Roads (TMR) is upgrading the Western Freeway between Indooroopilly and Toowong. The upgrade involves widening the Western Freeway from two to three lanes in each direction. Work on the upgrade began in early 2014 and is expected to be completed in 2015, weather and construction conditions permitting. The majority of work will be undertaken between 6.30am to 6.30pm, Monday to Saturday. Some activities are also required to be undertaken at night between 8pm and 5am on the inbound and outbound lanes of the Western Freeway. Minor traffic delays, lane closures and reduced speed limits will apply through the work area. For further information please call 1800 778 772. Last edited: 20 Feb 2015 13:47
Last report received from DTMR: 2015-02-20T13:47:41
WARREGO HIGHWAY, HAIGSLEA, 4306 - Planned Roadworks All directions Warrego Highway Intersections Improvements. Commencing: 16 February 2015, at 6:00am Concluding:01 June 2015, at 6:00pm Partial lane closures No delays expected. Observe signage. Works will be carried out from mid 2015 until mid 2015, weather and construction conditions permitting. Construction will be predominantly undertaken Monday to Saturday between 6:00am and 6:00pm to reduce the impact to residents and motorists. However, some works may need to be undertaken during the night or on weekends and TMR will endeavour to notify directly affected residents before this occurs. Short traffic delays, lane closures and reduced speed limits can be expected during the works. Traffic control will be in place to ensure the safety of road workers and motorists. Please be advised during construction the westbound off ramp to Haigslea-Malabar Road will be closed and access for motorists to and from the highway will be via the Claus Road intersection, approximately 200m west of the existing off ramp Last edited: 04 Feb 2015 10:17
Last report received from DTMR: 2015-02-04T10:17:28
MOGGILL ROAD, KENMORE, 4069 - Planned Roadworks Inbound At Cedarleigh Road.. Commencing: 19 January 2015, at 11:37am Concluding:31 May 2015, at 6:30pm Partial lane closures Delays expected. Changed traffic conditions. Upcoming construction at 2005 Moggill Road and associated road works near the Cedarleigh and Moggill Road intersection, Kenmore. Aspect Design and Development Pty Ltd, as engaged by the developer, will be starting roadworks in to comply with conditions of their development approval for a new service station. The works include: • Constructing a new petrol station at 2005 Moggill Road • Widening Moggill Road near the Cedarleigh and Moggill Road intersection to provide a left-turn pocket into the site. • Re-aligning the existing footpath to cater for the turn lane. Construction of the petrol station is expected to start on(week commencing 19 January 2015) and be completed by the end of May 2015, weather dependant. The works associated with widening Moggill Road to provide the left-turn pocket and re-alignment of the foot path is expected to start mid-April and take approximately two weeks to complete, weather and construction conditions permitting. • To undertake these works and ensure the safety of motorists and road workers, traffic controllers, single lane closures and speed restrictions will be used as required. • Construction works will be undertaken between 6.30am and 6.30pm, Monday to Saturday. • Pedestrian access will be maintained; however paths may be temporarily relocated and pedestrians should proceed with caution through the work zone. Last edited: 19 Jan 2015 11:43
Last report received from DTMR: 2015-01-19T11:43:10
SANDGATE ROAD, VIRGINIA, 4014 - Planned Roadworks Both Directions Commencing: 12 January 2015, at 7:00pm Concluding:31 May 2015, at 5:00am Partial lane closures Delays expected. Observe signage. The Department of Transport and Main Roads (TMR) will be installing guardrail on Sandgate Road between Gympie Street and the Virginia rail overpass periodically from mid January to late May 2015. TMR appreciates your patience while these important works are being carried out. Last edited: 08 Jan 2015 13:30
Last report received from DTMR: 2015-01-08T13:30:41
MOUNT GRAVATT CAPALABA ROAD, WISHART, 4122 - Planned Roadworks Both Directions Mt Gravatt Capalaba Road, Wishart, between Broadwater and Gardner/Mt Petrie Roads. Gateway Motorway on and off ramps, Mackenzie. Commencing: 12 May 2014, at 1:00pm Concluding:31 December 2015, at 5:00am Lane or lanes reduced Delays expected. Changed traffic conditions. Motorists are advised that construction of Gateway Upgrade South Stage 2a (Mt Gravatt Capalaba Road) commenced in April 2014 and will continue through to late 2015, weather and construction conditions permitting. The Australian Government and Queensland Government are jointly funding the upgrade of Mt Gravatt-Capalaba Road (Broadwater to Gardner Road) as part of the second stage of Gateway Upgrade South projects. Bridge duplication works and general road construction activities will be carried out Monday to Saturday between 7am and 5pm. Nightworks and temporary lane closures, on Mount Gravatt-Capalaba Road, Wishart and Gateway Motorway on and off-ramps, Mackenzie will be required 8pm to 5am up to 5 nights per week and may also occur off-peak during the day. Traffic management including reduced speed limits, traffic controllers and devices will be in place to guide motorists where required. During construction, minor traffic delays and some noise, dust and vibration may be experienced. The project team will endeavour to minimise impacts where possible. Please slow down – roadwork safety is your responsibility too. For further information contact the project team on 1800 799 686. A map and further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth. #128 Last edited: 15 Sep 2014 04:28
Last report received from DTMR: 2014-09-15T04:28:48
Special Events
BRADFIELD HIGHWAY, KANGAROO POINT, 4169 - Special Event All directions Commencing: 05 July 2015, at 7:00am Concluding:05 July 2015, at 7:00pm All lanes affected Long delays expected. Use alternative route. Brisbane City Council wishes to advise that the Story Bridge shall be fully closed to all traffic on Sunday 5th July between the hours of 7am and 7pm. Motorists are encouraged to plan their travel ahead as major delays will occur north and south of the bridge. Traffic will need to travel via the Pacific Motorway / Captian Cook Bridge to cross the river, or use the Clem7 Tunnel (Tolls will not apply during the road closure times). For further information on this event please visit www.brisbane.qld.gov.au/whats-brisbane/featured-events/story bridge or phone Council (07) 31785511 Last edited: 25 May 2015 09:13
Last report received from DTMR: 2015-05-25T09:13:53
CAXTON STREET, PADDINGTON, 4064 - Special Event All directions Caxton Street Festival. Commencing: 07 June 2015, at 5:00am Concluding:08 June 2015, at 4:00am All lanes affected Delays expected. Diversions are in place. Brisbane City Council wishes to advise that due to the holiday of this years Caxton Street Festival on Sunday 7th June, Caxton St between Petrie Tce and Castlemain St and the Caxton St off ramp from the ICB shall be closed from 5am Sunday 7th June to 4am Monday 8th June. Various other local closures of changed traffic conditions may be in place for the safe and effective regulation of traffic. For the further information on this event please visit www.caxtonstreetfestival.com.au Event Day – Hotline Number 0431 297 180 Last edited: 20 May 2015 22:37
Last report received from DTMR: 2015-05-20T22:37:28
STANLEY STREET, WOOLLOONGABBA, 4102 - Special Event All directions At the Gabba Stadium. 15 minute parking restrictions apply. Commencing: 31 May 2015, at 1:10pm Concluding:31 May 2015, at 3:45pm Partial lane closures Delays expected. Allow extra travel time. The Brisbane Lions v St Kilda AFL game will be held at the Gabba on Sunday 31st May from 1.10pm. Traffic congestion may be experienced on Stanley St, Vulture St, and Ipswich Rd from 11.40am on match day. Motorists on the Pacific Motorway may also experience congestion from this time at the northbound Stanley St exit 2 and Stanley St onramp and southbound across the Captain Cook Bridge to the Vulture St exit 2, Stanley St onramp and Main St. Road closures will be in place approximately 45 minutes before the end of the event on Stanley St and Vulture St. Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Gabba Traffic Area on match days. Last edited: 24 May 2015 01:41
Last report received from DTMR: 2015-05-24T01:41:51
GREGORY TERRACE, SPRING HILL, 4000 - Special Event All directions Commencing: 28 May 2015, at 12:01pm Concluding:11 June 2015, at 11:55am All lanes affected Delays expected. Changed traffic conditions. Brisbane City Council wishes to advise that due to the staging of this years Caravan and Camping Show being held during the period 3rd to 9th June, various road and lane closures, revised street signage and parking arrangements shall be in place in the vicinity of the RNA from Thursday 28th May to and including Thursday 11th June. For further information on closures for this event please contact Council's Call Centre on 34038888 Last edited: 17 May 2015 01:50
Last report received from DTMR: 2015-05-17T01:50:10
North Coast
Road Closures/Load Limits
PALMWOODS MONTVILLE ROAD, PALMWOODS, 4555 - Reduced to one lane due to slippage between McDonalds Rd and Montville Road. Traffic signals in place top and bottom of range Open (with caution) Reduced speed limit (40Km/h). Last edited: 26 May 2015 08:49 Next Update: as conditions change
Last report received from DTMR: 2015-05-26T08:49:37
MAHON ROAD, COOMINYA, - Closed to all vehicles use alternative route. Last edited: 11 Feb 2015 Next update:06 May 2015
Last report received from DTMR: 2015-02-11T11:41:00
OBI OBI ROAD, OBI OBI, 4574 - Subject to a 10 tonne GVM limit Observe signage. Obi Obi Road, Obi Obi – The downhill section of Obi Obi Road westbound between Mapleton and Kenilworth is open to traffic. Last edited: 26 May 2015 08:48 Next Update: as conditions change
Last report received from DTMR: 2015-05-26T08:48:55
Roadworks
WARREGO HIGHWAY, PRENZLAU, 4311 - Planned Roadworks Both Directions West of Waldron Road and Hermanns Road or near Freedom Fuels Service Station. Commencing: 25 May 2015, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 26 June 2015, weather permitting. Limited to one lane No delays expected. Changed traffic conditions. On Site during Working Hours: Limited to one lane each direction, reduced speed 40km/hr, no delays expected, please proceed with caution. On Site during NON Working Hours: Lane closure affecting Westbound traffic with a reduced speed to 60km/hour and a reduced speed to 80km/hour affecting Eastbound Traffic. Last edited: 28 May 2015 17:40
Last report received from DTMR: 2015-05-28T17:40:43
BRIBIE BRIDGE, SANDSTONE POINT, 4511 - Planned Roadworks Both Directions One lane closed 7pm to 5am for works on bridge . Commencing: 22 March 2015, at 7:00pm Concluding:29 May 2015, at 5:00am One lane closed Delays expected. Traffic control on scene. Painting of the bridge and the installation of pedestrian passing bays. Traffic controllers will be on scene and some delays may occur. Works will occur at night between 7am and 5am. Last edited: 20 Mar 2015 10:52
Last report received from DTMR: 2015-03-20T10:52:26
BRUCE HIGHWAY, COOROY, 4563 - Planned Roadworks Both Directions Cooroy to Federal (including Black Mountain). Commencing: 20 March 2015, at 7:25pm Concluding:31 July 2015, at 12:00pm Delays expected. Proceed with caution. Cudgerie Drive to Sankeys Road From 1 March 2015, Bruce Highway traffic diverted onto the new highway lanes between Cudgerie Drive and Black Mountain Range Road, with an 80km/h speed limit in place. The northbound passing lane near Black Mountain Range Road has been partially closed as part of this switch. From April 2015 until late 2015, southbound traffic exiting to Cooroy and Noosa (Exit 230A) is being diverted from the new highway lanes via a side track to Elm Street. Cooroy southern interchange to Cudgerie Drive The speed limit has been reduced through the Cooroy southern interchange to 70km/h, and just north of the interchange to 80km/h. Motorists may experience minor delays. Traffic changes are in place around the Cooroy southern interchange connection road including single lane closures, signage, traffic controllers and stop-go operations until late 2015. . Bridge deck installation for the new Cooroy southern interchange off-ramp has temporarily reduced the clearance height to 5.0m until late 2015. From January 2015, northbound highway traffic will share the southbound highway lanes for approximately 1km just south of the Cooroy southern interchange, with single northbound and southbound traffic lanes in operation. Vehicles wider than 4m should observe the requirements of their over dimensional permits along this section of the highway. An alternative route is available via the Eumundi exit of the Bruce Highway in the south and Pomona Connection Road in the north. Cooroy can then be reached via the old highway (Eumundi Range Road/Nandroya Road/Myall Street) and Pomona can be reached via Elm Street and Yurol Forest Drive. Please note a maximum 5.0m ground contact width northbound and southbound. More details are available on TMR’s Conditions of Operation database at www.tmr.qld.gov.au. Proceed with caution. Last edited: 25 May 2015 10:01
Last report received from DTMR: 2015-05-25T10:01:47
BRUCE HIGHWAY, KALLANGUR, 4503 - Planned Roadworks Both Directions The Department of Transport and Main Roads (TMR) would like to advise you that work will begin on Monday 23 February 2015 on Stage 2 of the Kallangur Noise Barrier project. Commencing: 24 February 2015, at 2:40pm Concluding:Mid 2015 Unknown traffic impact. Traffic control on scene. The Department of Transport and Main Roads (TMR) would like to advise you that work will begin on Monday 23 February 2015 on Stage 2 of the Kallangur Noise Barrier project. TMR completed on-site noise testing along the Bruce Highway between Pine Rivers Bridge and Boundary Road. The results identified that the noise barriers located between Orchid Avenue and Duffield Road to the west of the highway and along the boundary fence of Kerr Road to the east of the highway in Kallangur require upgrading. These noise barriers are being upgraded in two stages. Stage 1 of the project was constructed by Downer Mouchel and involved replacing wooden barriers on the western side of the Bruce Highway between Duffield Road and Jillian Street in Kallangur with 3.6 metre high concrete panels. This stage was completed in late 2014. The construction contract for Stage 2 has been awarded to Epoca Constructions, and works involve upgrading the existing timber barrier on the western side of the Bruce Highway between Orchid Avenue and Duffield Road to concrete panels, as well as installing a new barrier on the eastern side of the highway behind the existing barrier near Kerr Road. Work over the coming weeks will involve the removal of vegetation on either side of the existing barrier to allow for access and a clear and safe project site, followed the removal of the existing barriers and post hole digging and construction for the new barriers. Full construction of the new barriers is expected to be completed by mid-2015, weather permitting. Nearby residents may experience some minor construction noise and while works are occurring near their property. The department will endeavour to progress the works as quickly as possible and minimise any inconvenience to these residents. For further information about the project, please contact Project Manager Geoff Bates on 5451 7055. Further information about the project can be found at www.tmr.qld.gov.au under projects ‘Kallangur noise barrier project’. For up-to-date information on traffic disruptions please visit www.131940.qld.gov.au or call 13 19 40. Last edited: 24 Feb 2015 14:33
Last report received from DTMR: 2015-02-24T14:33:22
PRICE STREET, NAMBOUR, 4560 - Planned Roadworks All directions The Department of Transport and Main Roads (TMR) would like to inform you of upcoming construction works at the Nambour park ‘n’ ride project site located on the eastern side of Price Street near the intersection with Hospital Road. Commencing: 17 November 2014, at 6:00am Concluding:End January 2015, weather permitting Delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) would like to inform you of upcoming construction works at the Nambour park ‘n’ ride project site located on the eastern side of Price Street near the intersection with Hospital Road. Works will involve constructing an additional 50 parking spaces at the Nambour rail and bus interchange to improve parking opportunities for passengers using the bus and rail services in Nambour. Work is scheduled to commence 17 November 2014, and will be undertaken Monday to Saturday from 6am to 6pm. Works are scheduled for completion by end of January 2015, weather permitting. Motorists may experience minor traffic disruptions while work is taking place. TMR understands roadworks can be frustrating for nearby residents and road users and would like to thank you in advance for your patience and cooperation. Signage and traffic control will be in place during works to safeguard motorists and roadworkers. Motorists are encouraged to drive to the changed traffic conditions and obey signs and traffic controller directions at all times. For up-to-date information on traffic disruptions please visit www.131940.qld.gov.au or call 13 19 40. For information or enquiries on roadworks and traffic conditions, or to report an incident, call 13 19 40 or visit www.131940.qld.gov.au. Last edited: 13 Nov 2014 14:00
Last report received from DTMR: 2014-11-13T14:01:06
BRISBANE VALLEY HIGHWAY, BRAEMORE, 4313 - Planned Roadworks Both Directions The Department of Transport and Main Roads (TMR) would like to advise that construction of the new overtaking lane on the Brisbane Valley Highway just south of Braemore. Commencing: 03 November 2014, at 9:11am Concluding:Mid 2015 Lane or lanes reduced Delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) would like to advise that construction of the new overtaking lane on the Brisbane Valley Highway just south of Braemore. The project will involve widening and sealing the existing road formation and upgrading the Scrub Creek Road intersection with the highway to improve turning movements through the intersection. Works will also involve provision of a 1m wide painted median to separate the northbound and southbound traffic and improve safety for travelling motorists. Works are scheduled to commence 20 October 2014, weather permitting, and will be undertaken Monday to Friday between 6am and 6pm. Some weekend works may be required. The project is scheduled for completion by mid-2015. Reduced speed limits, lane closure, signage and traffic control will be in place during works to safeguard motorist and roadworkers. Motorists are encouraged to drive to the changed traffic conditions and obey signs and traffic controller directions at all times. TMR is committed to keeping you informed as construction progresses. Further information on the upgrade is available at www.tmr.qld.gov.au, click on ‘projects’ and search for the ‘Brisbane Valley Highway overtaking lane’ project page. For up-to-date information on traffic conditions, please visit www.131940.qld.gov.au or call 13 19 40. Last edited: 03 Nov 2014 09:12
Last report received from DTMR: 2014-11-03T09:12:39
BRUCE HIGHWAY, NORTH LAKES, 4509 - Planned Roadworks Southbound Works will commence on the Anzac Avenue southbound on-ramp to the Bruce Highway as part of the Bruce Highway Managed Motorway Project. Commencing: 18 September 2014, at 5:45pm Concluding:Mid 2015 Lane or lanes reduced Delays expected. Traffic control on scene. Last edited: 19 Sep 2014 12:01
Last report received from DTMR: 2014-09-19T12:02:01
BRUCE HIGHWAY, BELLS CREEK, 4551 - Planned Roadworks Both Directions Construction of a new interchange on the Bruce Highway at Roys Road and Bells Creek Road, Beerwah. Reduced speed limit of 80km/h is in place in the roadworks area. Motorists may experience some minor delays. Work is expected to be complete by mid-2015. . Commencing: 09 July 2014, at 1:34pm Concluding:30 June 2015, at 12:00am Delays expected. Reduced speed limit (80km/h). The Department of Transport and Main Roads (TMR) would like to advise that pavement works will be underway on a section of the Bruce Highway southbound lanes, north of Coochin Creek, from 3 September 2014 to early December 2014, weather permitting. These works are part of the Bells Creek Road/Roys Road interchange upgrade project. To minimise traffic disruptions, works will be carried out Sunday to Thursday, between 8pm and 5am. For safe and efficient traffic management, lane closures and reduced speed limits will be in place on the Bruce Highway. Variable message signs and traffic controllers will direct motorists to the appropriate lanes during these works. TMR apologises for any inconvenience this work may cause and thanks road users for their patience. More information about the interchange upgrade is available on TMR’s website at www.tmr.qld.gov.au by searching ‘Bruce Highway interchange at Roys Road and Bells Creek Road’. If you require further information, please call the North Coast office in Maroochydore on 5451 7055 or email northcoast@tmr.qld.gov.au. Last edited: 19 Sep 2014 12:02
Last report received from DTMR: 2014-09-19T12:02:29
Special Events
NAMBOUR CONNECTION ROAD, WOOMBYE, 4559 - Special Event Northbound Nambour Connection Road and Bruce Highway north bound exit 201. . Commencing: 28 May 2015, at 7:25am Concluding:31 May 2015, at 7:27am Lane or lanes reduced Delays expected. Proceed with caution. Speed reductions and traffic control on Nambour Connection road westbound, and Bruce Highway, northbound at exit 201. Last edited: 28 May 2015 07:28
Last report received from DTMR: 2015-05-28T07:29:15
North West
Incidents
WILLS DEVELOPMENTAL ROAD, GREGORY, 4830 - Infrastructure damage Hazard Both Directions No blockage No delays expected. Reduced speed limit (40km/h). Damage to cattle grid - please reduce speed and take caution. Last edited: 19 May 2015 11:38
Last report received from DTMR: 2015-05-19T11:38:24
Road Closures/Load Limits
HUGHENDEN MUTTABURRA ROAD, HUGHENDEN, 4821 - Hughenden - Muttaburra Open (with caution) Observe signage. Drive with caution, rough surface in some sections due to Flood Damage Last edited: 20 May 2015 14:00 Next Update: 23 May 2015
Last report received from DTMR: 2015-05-20T14:01:04
TORRENS CREEK ARAMAC ROAD, TORRENS CREEK, 4816 - Aramac - Torrens Creek Open (with caution) Observe signage. “OPEN WITH CARE” Drive with caution, rough surface in some sections due to flood damage Last edited: 20 May 2015 14:00 Next Update: 23 May 2015
Last report received from DTMR: 2015-05-20T14:00:45
KENNEDY DEVELOPMENTAL ROAD, HUGHENDEN, 4821 - Hughenden - Flinders Shire Boundary Open (with caution) Observe signage. “OPEN WITH CARE” Drive with caution, rough surface in some sections due to flood damage Last edited: 20 May 2015 14:00 Next Update: 23 May 2015
Last report received from DTMR: 2015-05-20T14:00:29
BURKE DEVELOPMENTAL ROAD, HOWITT, 4890 - Walkers creek to Mareeba shire/Tablelands regional boundary Restricted to four wheel drive vehicles only Proceed with caution. Please take extreme care when travelling, due to sections of road damaged from washouts Last edited: 26 May 2015 16:04 Next Update: 29 May 2015
Last report received from DTMR: 2015-05-26T16:04:43
KENNEDY DEVELOPMENTAL ROAD, HUGHENDEN, 4821 - Hughenden - Winton Open (with caution) Observe signage. Drive with caution, rough surface in some sections due to Flood Damage Last edited: 20 May 2015 14:00 Next Update: 23 May 2015
Last report received from DTMR: 2015-05-20T14:00:11
Roadworks
RICHMOND WINTON ROAD, RICHMOND, 4822 - Planned Roadworks Both Directions Commencing: 19 May 2015, at 11:55am Concluding:31 May 2015, at 12:00am No blockage No delays expected. Proceed with caution. Roadworks currently in progress south of Richmond. Proceed with caution and observe all traffic signage. Last edited: 19 May 2015 11:55
Last report received from DTMR: 2015-05-19T11:56:48
RAMSAY STREET, CLONCURRY, 4824 - Planned Roadworks Both Directions Heavy Vehicle Bypass - via Railway Street closed and part closure of Hensley Drive to ALL Heavy Vehicles (including all excess dimension and over mass vehicles). Commencing: 17 October 12:00am Concluding:29 May 2015, at 3:38pm Road closed both directions No delays expected. Use alternative route. From 25/2/15 - 2/4/15 there will be a part closure of Hensley Drive between Sir Hudson Fysh Drive and Burke Developmental Road Alternative route Burke Developmental Road, Barkly Highway or Station Street, Alice Street, Isley Street or Station Street, Alice Street, Sir Hudson Fysh Drive Last edited: 08 Apr 2015 12:17
Last report received from DTMR: 2015-04-08T12:17:00
Northern
Incidents
BRUCE HIGHWAY, INKERMAN, 4806 - Smoke or poor visibility Hazard All directions Possible smoke hazard between Cape Upstart and Mt Inkerman. All lanes affected Unknown traffic impact. Proceed with caution. Last edited: 27 May 2015 13:55
Last report received from DTMR: 2015-05-27T13:56:25
Roadworks
BRUCE HIGHWAY, COOLBIE, 4850 - Planned Roadworks All directions Commencing: 28 May 2015, at 7:01am Concluding:30 May 2015, at 5:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:39
Last report received from DTMR: 2015-05-25T17:40:01
BRUCE HIGHWAY, SHAW, 4818 - Planned Roadworks All directions Commencing: 27 May 2015, at 8:00pm Concluding:19 June 2015, at 6:00am Partial lane closures Unknown traffic impact. Changed traffic conditions. Last edited: 25 May 2015 16:51
Last report received from DTMR: 2015-05-25T16:51:44
BRUCE HIGHWAY, INGHAM, 4850 - Planned Roadworks Both Directions Various locations along Bruce Highway 27/05 - Home Hill, Plantation Creek, Brandon 28/05 - Ingham, Hawkins Creek Road, MacIlwraith St, Forest Beach Road, Trebonne, Gregory Development Road, Rainbow Road 29/05 - Charters Towers. Commencing: 27 May 2015, at 6:00pm Concluding:29 May 2015, at 6:00am Partial lane closures Delays expected. Changed traffic conditions. 3 minutes delays expected Last edited: 27 May 2015 16:05
Last report received from DTMR: 2015-05-27T16:06:10
BRUCE HIGHWAY, MCDESME, 4807 - Planned Roadworks Both Directions Commencing: 25 May 2015, at 9:00am Concluding:12 June 2015, at 2:45pm Partial lane closures Delays expected. Changed traffic conditions. Burdekin Bridge Works, Home Hill Motorists are advised that maintenance works will be completed on the Burdekin Bridge, Home Hill between the hours of 9.00am to 2.45pm on the following dates: 25 May 2015 to 29 May 2015 2 June 2015 to 5 June 2015 8 June 2015 to 12 June 2015 Speed restrictions and changed traffic conditions including single lane closures and stop/go controls will be in place. Motorists can expect minor delays. The Department thanks motorists for their patience and cooperation while these works are being completed Last edited: 25 May 2015 17:37
Last report received from DTMR: 2015-05-25T17:37:54
BRUCE HIGHWAY, MCDESME, 4807 - Planned Roadworks All directions Commencing: 25 May 2015, at 6:00am Concluding:28 May 2015, at 6:00pm Partial lane closures No delays expected. Observe signage. Last edited: 25 May 2015 17:40
Last report received from DTMR: 2015-05-25T17:41:07
CHARTERS TOWERS ROAD, HYDE PARK, 4812 - Planned Roadworks Various locations along Charters Towers Road, Bowen Road and Ross River Road. Commencing: 21 May 2015, at 6:00am Concluding:02 June 2015, at 6:00pm No blockage No delays expected. Observe signage. Parking lane blocked Last edited: 25 May 2015 17:41
Last report received from DTMR: 2015-05-25T17:41:53
DALRYMPLE ROAD, GARBUTT, 4814 - Planned Roadworks Both Directions Commencing: 19 May 2015, at 7:00am Concluding:30 June 2015, at 4:30pm No blockage No delays expected. Changed traffic conditions. Speed restrictions and traffic controllers in place Last edited: 25 May 2015 17:40
Last report received from DTMR: 2015-05-25T17:40:22
WOOLCOCK STREET, HYDE PARK, 4812 - Planned Roadworks Both Directions Installation of new water mains on various state controlled roads - Woolcock Street, Ross River Road, Bowen Road and Charters Towers Road. Commencing: 15 May 2015, at 7:00am Concluding:30 September 2015, at 2:00pm Partial lane closures Unknown traffic impact. Changed traffic conditions. Last edited: 25 May 2015 17:32
Last report received from DTMR: 2015-05-25T17:32:45
BRUCE HIGHWAY, GIRU, 4809 - Planned Roadworks Both Directions Between Hodel Road to Upper Haughton Road, Giru. Commencing: 10 May 2015, at 6:00am Concluding:07 June 2015, at 6:00pm No blockage Unknown traffic impact. Changed traffic conditions. Last edited: 25 May 2015 17:35
Last report received from DTMR: 2015-05-25T17:35:44
EYRE STREET, NORTH WARD, 4810 - Planned Roadworks Eastbound Repairs to footpath. Commencing: 08 May 2015, at 11:18am Concluding:09 May 2015, at 3:00pm Partial lane closures Unknown traffic impact. Changed traffic conditions. Last edited: 25 May 2015 17:37
Last report received from DTMR: 2015-05-25T17:37:31
WOOLCOCK STREET, HYDE PARK, 4812 - Planned Roadworks Woolcock Street (near Church Street). Commencing: 07 May 2015, at 11:58am Concluding:07 May 2015, at 2:30pm No blockage Unknown traffic impact. Changed traffic conditions. Last edited: 25 May 2015 17:34
Last report received from DTMR: 2015-05-25T17:34:41
THE RING ROAD, BOHLE PLAINS, 4817 - Planned Roadworks Both Directions Townsville Ring Road Section 4 From Kalynda Chase intersection to Mt Low intersection of the Bruce Highway . Commencing: 07 May 2015, at 10:30am Concluding:31 May 2017, at 12:00am No blockage No delays expected. Changed traffic conditions. Motorists are advised there will be increased heavy vehicles in the vicinity of Kalynda Parade and Dalrymple Road for the duration of this project which is expected to be completed by mid 2017. Last edited: 25 May 2015 17:34
Last report received from DTMR: 2015-05-25T17:35:01
CHARTERS TOWERS ROAD, HERMIT PARK, 4812 - Planned Roadworks Both Directions Roadwords at along Ackers Street.. Commencing: 04 May 8:51am Concluding:06 June 2015, at 4:00pm Partial lane closures Unknown traffic impact. Changed traffic conditions. speed restrictions and detours are in place. Last edited: 25 May 2015 17:41
Last report received from DTMR: 2015-05-25T17:42:16
AYR DALBEG ROAD, AIRVILLE, 4807 - Planned Roadworks Both Directions Tudehope Road intersection. Commencing: 04 May 2015, at 6:00am Concluding:05 June 2015, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:32
Last report received from DTMR: 2015-05-25T17:32:26
EYRE STREET, NORTH WARD, 4810 - Planned Roadworks Both Directions Commencing: 30 April 2015, at 7:00am Concluding:01 June 2015, at 5:26pm Partial lane closures No delays expected. Observe signage. Last edited: 25 May 2015 17:40
Last report received from DTMR: 2015-05-25T17:40:43
BRUCE HIGHWAY, GIRU, 4809 - Planned Roadworks Both Directions Commencing: 27 April 2015, at 6:00am Concluding:03 July 2015, at 6:00pm Partial lane closures No delays expected. Observe signage. Last edited: 25 May 2015 17:31
Last report received from DTMR: 2015-05-25T17:32:04
BRUCE HIGHWAY, COOLBIE, 4850 - Planned Roadworks Eastbound Commencing: 24 April 2015, at 6:00am Concluding:30 May 2015, at 6:00pm Partial lane closures No delays expected. Observe signage. Last edited: 25 May 2015 17:30
Last report received from DTMR: 2015-05-25T17:30:55
BRUCE HIGHWAY, GIRU, 4809 - Planned Roadworks Northbound Commencing: 24 April 2015, at 6:00am Concluding:03 July 2015, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:30
Last report received from DTMR: 2015-05-25T17:31:14
DALRYMPLE ROAD, MOUNT LOUISA, 4814 - Planned Roadworks Eastbound Commencing: 21 April 2015, at 6:01am Concluding:04 August 2015, at 6:00pm Partial lane closures Unknown traffic impact. Observe signage. Last edited: 25 May 2015 17:24
Last report received from DTMR: 2015-05-25T17:24:33
ABBOTT STREET, OONOONBA, 4811 - Planned Roadworks Southbound Intersection with Oonoonba Road. Commencing: 13 April 2015, at 11:01pm Concluding:01 June 2015, at 7:00am No delays expected. Observe signage. Last edited: 25 May 2015 17:29
Last report received from DTMR: 2015-05-25T17:30:09
VICTORIA MILL ROAD, INGHAM, 4850 - Planned Roadworks Both Directions Construction works along Forest Beach Road. Commencing: 07 April 6:00am Concluding:30 November 2015, at 6:00pm Both lanes affected No delays expected. Changed traffic conditions. Last edited: 25 May 2015 17:22
Last report received from DTMR: 2015-05-25T17:22:44
ABERGOWRIE ROAD, ABERGOWRIE, 4850 - Planned Roadworks Both Directions Works being completed on Sportsman Parade. Commencing: 06 April 6:00am Concluding:30 May 2015, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:30
Last report received from DTMR: 2015-05-25T17:30:35
HERBERT STREET, INGHAM, 4850 - Planned Roadworks Both Directions Works on toilet block. Commencing: 01 April 2015, at 7:04am Concluding:30 June 2015, at 4:00pm Unknown traffic impact. Observe signage. Last edited: 25 May 2015 17:20
Last report received from DTMR: 2015-05-25T17:20:58
CHARTERS TOWERS ROAD, HYDE PARK, 4812 - Planned Roadworks Charters Towers Road, Bowen Road and Ross River Road. Commencing: 28 March 2015, at 6:00am Concluding:01 July 2015, at 6:00pm Unknown traffic impact. Observe signage. Last edited: 25 May 2015 17:24
Last report received from DTMR: 2015-05-25T17:25:16
THURINGOWA DRIVE, KIRWAN, 4817 - Planned Roadworks All directions Bike path works will be taking place at the Greenwood Drive roundabout. Commencing: 24 March 6:30am Concluding:01 June 2015, at 4:30pm Partial lane closures Delays expected. Changed traffic conditions. Bike lane works commenced on 25th March Temporary lane closures, speed restrictions and traffic control will occurr between 7:00am and 4:30pm. Last edited: 25 May 2015 17:15
Last report received from DTMR: 2015-05-25T17:15:44
WOOLCOCK STREET, WEST END, 4101 - Planned Roadworks Various Roads within Townsville region. Commencing: 12 March 2015, at 4:34pm Concluding:09 March 2016, at 3:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:21
Last report received from DTMR: 2015-05-25T17:21:40
RIVERWAY DRIVE, CONDON, 4815 - Planned Roadworks Southbound Between Gouldian Avenue & Village Boulevard. Commencing: 10 March 2015, at 4:12pm Concluding:30 June 2015, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:23
Last report received from DTMR: 2015-05-25T17:23:31
TOWNSVILLE ROAD, INGHAM, 4850 - Planned Roadworks Both Directions Macrossan Avenue. Commencing: 09 March 2015, at 6:00am Concluding:30 May 2015, at 6:15pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:31
Last report received from DTMR: 2015-05-25T17:31:34
DALRYMPLE ROAD, GARBUTT, 4814 - Planned Roadworks Inbound Dalrymple Service Road. Commencing: 03 March 2015, at 4:08pm Concluding:29 May 2015, at 5:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:19
Last report received from DTMR: 2015-05-25T17:20:10
PERCY STREET, WEST END, 4101 - Planned Roadworks Adjacent Crauford Street. Commencing: 23 February 2015, at 6:00am Concluding:30 May 2015, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:16
Last report received from DTMR: 2015-05-25T17:16:58
DALRYMPLE ROAD, VINCENT, 4814 - Planned Roadworks Both Directions Commencing: 19 February 2015, at 4:29pm Concluding:29 May 2015, at 5:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:14
Last report received from DTMR: 2015-05-25T17:14:27
BRUCE HIGHWAY, STUART, 4811 - Planned Roadworks Various low impact areas around Townsville. Commencing: 19 February 2015, at 7:00am Concluding:21 March 2016, at 6:00pm Partial lane closures No delays expected. Observe signage. Last edited: 25 May 2015 17:13
Last report received from DTMR: 2015-05-25T17:13:57
BRUCE HIGHWAY, DEERAGUN, 4818 - Planned Roadworks Both Directions Street light maintenance between Veales Road and Garland Road. Commencing: 18 February 2015, at 8:02am Concluding:30 June 2015, at 5:00pm Partial lane closures No delays expected. Observe signage. Last edited: 25 May 2015 17:35
Last report received from DTMR: 2015-05-25T17:35:21
DALRYMPLE ROAD, MOUNT LOUISA, 4814 - Planned Roadworks Various locations along Woolcock Street and Dalrymple Road. Commencing: 09 February 2015, at 7:00am Concluding:09 August 2015, at 6:00pm No blockage Unknown traffic impact. Observe signage. Last edited: 25 May 2015 17:25
Last report received from DTMR: 2015-05-25T17:25:55
BRUCE HIGHWAY, BLUEWATER, 4818 - Planned Roadworks Both Directions Speed reductions are in place on the Bruce Highway to allow for water main works near the intersection of Toolakea Beach Road. Commencing: 02 February 7:00am Concluding:30 June 2015, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:24
Last report received from DTMR: 2015-05-25T17:24:54
STUART DRIVE, STUART, 4811 - Planned Roadworks Both Directions At various locations along Stuart Drive. Commencing: 06 December 2014, at 7:00am Concluding:30 June 2015, at 6:01pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:23
Last report received from DTMR: 2015-05-25T17:24:09
BRUCE HIGHWAY, DEERAGUN, 4818 - Planned Roadworks Slashing of road reserve on various State-controlled roads. Commencing: 27 October 2014, at 6:00am Concluding:27 October 2015, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:33
Last report received from DTMR: 2015-05-25T17:33:32
ROSS RIVER ROAD, AITKENVALE, 4814 - Planned Roadworks Both Directions Civil works will be occurring on various roads including Denham Street, Dean Street, Saunders Street, Railway Avenue, Ross River Road,Percy Street, Hugh Street, Woolcock Street and Dalrymple Road. Commencing: 24 October 2014, at 2:40pm Concluding:30 June 2015, at 12:00am No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:32
Last report received from DTMR: 2015-05-25T17:33:06
WOOLCOCK STREET, GARBUTT, 4814 - Planned Roadworks Both Directions Replacement of street lights and fittings at several locations around Townsville. Commencing: 20 October 2014, at 6:00am Concluding:30 June 2015, at 6:00pm No blockage Unknown traffic impact. Observe signage. Last edited: 25 May 2015 17:17
Last report received from DTMR: 2015-05-25T17:17:25
HERVEY RANGE ROAD, RANGEWOOD, 4817 - Planned Roadworks Both Directions Powerline works are taking place between Kalynda Parade and Ridge Drive, resulting in intermittent closures in both directions. Commencing: 14 October 2014, at 8:00am Concluding:31 May 2015, at 5:22pm Lane or lanes reduced Delays expected. Traffic control on scene. Last edited: 25 May 2015 17:22
Last report received from DTMR: 2015-05-25T17:22:23
RIVERWAY DRIVE, THURINGOWA CENTRAL, 4817 - Planned Roadworks Both Directions Commencing: 10 October 2014, at 7:00am Concluding:31 December 2015, at 5:00pm No blockage Unknown traffic impact. Observe signage. Last edited: 25 May 2015 17:34
Last report received from DTMR: 2015-05-25T17:34:19
SAUNDERS STREET, RAILWAY ESTATE, 4810 - Planned Roadworks Commencing: 13 June 2014, at 2:30pm Concluding:12 August 2015, at 8:00pm No blockage Unknown traffic impact. Changed traffic conditions. Last edited: 25 May 2015 17:28
Last report received from DTMR: 2015-05-25T17:29:16
HERVEY RANGE ROAD, BOHLE PLAINS, 4817 - Planned Roadworks Works occurring on road reserve in the vicinity of Gumlow Road. Commencing: 02 June 2014, at 6:00am Concluding:29 May 2015 No blockage No delays expected. Observe signage. Last edited: 25 May 2015 17:29
Last report received from DTMR: 2015-05-25T17:29:49
BRUCE HIGHWAY, STUART, 4811 - Planned Roadworks Both Directions Bruce Highway Upgrade (Vantassel to Cluden) - Highway Duplication. Commencing: 09 October 2013, at 9:00am Concluding:Mid 2015 Partial lane closures Delays expected. Changed traffic conditions. Works continuing on the Bruce Highway Upgrade (Vantassel to Cluden). Speed restrictions and changed traffic conditions, including lane closures, traffic diversions, stop/go controls and temporary sidetracks are in place on the Bruce Highway between Zinc Avenue and Cluden Drive. Motorists should expect delays when travelling on this section of the Bruce Highway and be prepared for regularly changing traffic conditions. There is also increased construction traffic and heavy vehicles using the highway. Please slow down and obey all signage. A 60km/h speed restriction is in place between Zinc Avenue and Cluden Drive. This project is due for completion in mid-2015. Major traffic changes are in place at the following intersections: Bruce Highway / Zinc Avenue • Temporary diversions and lane closures are in place Bruce Highway / Hunter Street • Temporary diversions and lane closures are in place Abbott Street • A temporary road closure is in place along Abbott Street until Friday 26 June 2015 (weather permitting) • Access along Abbott Street between Keenan Street and the Townsville Sewerage Pump station will be maintained for local traffic only • During the closure access to the Bruce Highway and the city will be via Lakeside Drive, Idalia and access to Racecourse Road will be via a newly constructed road • Travelling to the city: o Access to the city will be via Lakeside Drive, Idalia o Access to Racecourse Road will be via a newly constructed road o No through traffic will be permitted beyond Racecourse Road • Travelling from the city: o Access to the Bruce Highway will be via Lakeside Drive, Idalia o Access along Abbott Street between Keenan Street and, the Townsville sewerage pump station will be maintained o No through Traffic will be permitted beyond the Townsville Sewerage Pump Station • Speed restrictions and signage will be in place to direct motorists. Lakeside Drive • Temporary diversions and lane closures are in place University Road / Stuart Drive • Diversions, road closures and temporary signage will be in place from Thursday 21 May 2015 to allow for the reconstruction of University Road and Stuart Drive intersection • Motorists will be diverted on to the newly constructed southbound lanes • Access to Newton Street will be via a temporary roundabout and side track located at the University Road and Cluden Driver intersection • Advanced warning signs will be used to notify road users of the new arrangements • University Road / Cluden Drive • Temporary roundabout in place from Thursday 21 May to access Cluden Drive and Newton Street • No right turn from Cluden Drive on to University Road The Department of Transport and Main Roads encourages all users to drive safely and observe signs and instructions during these works. We thank you for your patience and understanding while we safely complete these works. Last edited: 25 May 2015 17:38
Last report received from DTMR: 2015-05-25T17:38:40
Special Events
WOOLCOCK STREET, MOUNT LOUISA, 4814 - Special Event Both Directions Charity ride commences on Woolcock Street and travels various road throughout Townsville and ends at the Woolcock Road Service road . Commencing: 31 May 10:00am Concluding:31 May 2015, at 11:30am No blockage Delays expected. Allow extra travel time. Police escorted ride Last edited: 18 May 2015 08:46
Last report received from DTMR: 2015-05-18T08:46:36
FLINDERS STREET, TOWNSVILLE CITY, 4810 - Special Event Both Directions Between Denham Street and Stokes Street. Sundays 6am to 3pm. Commencing: 02 August, at 6:00am Concluding:17 June 2021, at 3:00pm Unknown traffic impact. Use alternative route. Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event. Last edited: 14 May 2015 10:49
Last report received from DTMR: 2015-05-14T10:50:29
South Coast
Incidents
PACIFIC MOTORWAY, DAISY HILL, 4127 - Multi-vehicle Crash Southbound After Loganlea Road overpass. Lane or lanes reduced Delays expected. Proceed with caution. Last edited: 28 May 2015 17:40
Last report received from DTMR: 2015-05-28T17:44:38
PACIFIC HIGHWAY, REEDY CREEK, - Congestion Northbound From Reedy Creek to Robina. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:43
Last report received from DTMR: 2015-05-28T16:43:59
PACIFIC MOTORWAY, ARUNDEL, 4214 - Congestion Southbound Up to Exit 66 off ramp. No blockage Delays expected. Proceed with caution. Last edited: 28 May 2015 16:06
Last report received from DTMR: 2015-05-28T16:06:57
PACIFIC HIGHWAY, ROBINA, 4226 - Congestion Southbound Mudgeeraba Exit 79 to Palm Beach Exit 92. No blockage Delays expected. Allow extra travel time. Last edited: 28 May 2015 16:34
Last report received from DTMR: 2015-05-28T16:34:40
Roadworks
KINGSTON ROAD, SLACKS CREEK, 4127 - Planned Roadworks Both Directions Nightworks on Brisbane-Beenleigh Road (Kingston Road) on 27 May and 28 May 2015 from 7pm each night, until 5am the next morning. Commencing: 27 May 2015, at 7:00pm Concluding:29 May 2015, at 5:00am Lane or lanes reduced Unknown traffic impact. Observe signage. Works are carried out in sections. Wednesday night 27 May 2015, northbound, between Park Road and Booran Drive. Thursday night 28 May 2015, southbound, between Reserve Road and Macarthur Crescent. Please drive safely and obey road work signage. Last edited: 27 May 2015 14:56
Last report received from DTMR: 2015-05-27T14:56:38
OCEANIC DRIVE, MERMAID WATERS, 4218 - Planned Roadworks Eastbound Road restoration along Oceanic Drive with eastbound lane closed and detours in place. Commencing: 25 May 2015, at 7:00am Concluding:30 June 2015, at 5:00pm One lane closed Delays expected. Changed traffic conditions. Last edited: 21 May 2015 12:36
Last report received from DTMR: 2015-05-21T12:36:48
LAMINGTON NATIONAL PARK ROAD, SARABAH, 4275 - Planned Roadworks Both Directions Night time road closures 15.5 km from Canungra. Commencing: Night time road closures from 7pm to 5am Concluding:mid-July 2015 Both lanes affected Delays expected. Changed traffic conditions. Last edited: 15 May 2015 14:53
Last report received from DTMR: 2015-05-15T14:54:24
TAMBORINE OXENFORD ROAD, WONGAWALLAN, 4210 - Planned Roadworks Both Directions Stop/slow traffic control near Hayes Road weekdays between 6.30am and 5pm. Commencing: 20 May 6:30am Concluding:30 September 2015, at 5:00pm Limited to one lane Delays expected. Allow extra travel time. Last edited: 20 May 2015 16:29
Last report received from DTMR: 2015-05-20T16:29:25
SMITH STREET, PARKWOOD, 4214 - Planned Roadworks All directions Westbound onramp Olsen Ave to Smith St (towards M1) closed to all traffic 8pm to 5am Thurs 28/5 Eastbound off-ramp Smith St to Olsen Ave also closed 8pm to 5am 28/05. Commencing: 28 April 12:00am Concluding:31 July 2015, at 12:00am All lanes affected Delays expected. Use alternative route. Works are expected to finish by mid 2015 Last edited: 28 May 2015 13:58
Last report received from DTMR: 2015-05-28T13:59:05
WEST BURLEIGH ROAD, BURLEIGH HEADS, 4220 - Planned Roadworks All directions Night time electrical works at the intersection of West Burleigh Road/Burleigh Street/James Street. Commencing: 20 April 2015, at 6:00pm Concluding:end June 2015 Lane or lanes reduced No delays expected. Changed traffic conditions. Last edited: 12 May 2015 08:11
Last report received from DTMR: 2015-05-12T08:12:49
STAPYLTON JACOBS WELL ROAD, YATALA, 4207 - Planned Roadworks Both Directions Roadworks between Yatala North interchange (Exit 38) and Quinns Hill West. Commencing: 08 April 2015, at 7:00am Concluding:31 May 2015, at 8:00pm Partial lane closures Unknown traffic impact. Changed traffic conditions. Speed restriction in place. Please drive with care. Last edited: 12 May 2015 12:42
Last report received from DTMR: 2015-05-12T12:43:25
STAPYLTON JACOBS WELL ROAD, ALBERTON, 4207 - Planned Roadworks Both Directions Roadworks on Stapylton-Jacobs Well Road between Woolshed Road and The Esplanade, Jacobs Well. Work will be carried out in sections during the day, and some works at night. Commencing: 08 April 2015, at 7:00am Concluding:31 May 2015, at 7:00am Partial lane closures Unknown traffic impact. Observe signage. Stop/slow traffic control in place. Please drive with care and watch out for signage and speed restrictions. Last edited: 12 May 2015 12:41
Last report received from DTMR: 2015-05-12T12:42:44
GOLD COAST SPRINGBROOK ROAD, MUDGEERABA, 4213 - Planned Roadworks All directions Near the intersection of Monaro Road. Commencing: late February 2015 Concluding:mid 2015 Lane or lanes reduced Delays expected. Allow extra travel time. Last edited: 12 May 2015 08:12
Last report received from DTMR: 2015-05-12T08:13:46
PRICE STREET, NERANG, 4211 - Planned Roadworks All directions No right turn from Short Street into Southport-Nerang Road . Commencing: early May 2015 Concluding:late May 2015 Partial lane closures No delays expected. Changed traffic conditions. No right turns allowed from Short Street into Southport-Nerang Road. Last edited: 12 May 2015 08:12
Last report received from DTMR: 2015-05-12T08:13:14
OLSEN AVENUE, SOUTHPORT, 4215 - Planned Roadworks All directions Westbound onramp Olsen Ave to Smith St (towards M1) closed to all traffic 8pm to 5am Thurs 28/5 Eastbound off-ramp Smith St to Olsen Ave also closed 8pm to 5am 28/05. Commencing: 15 December 10:28am Concluding:01 October 2015, at 12:00am All lanes affected Long delays expected. Allow extra travel time. Check out TMR's web page for further details on this project www.tmr.qld.gov.au/projects Call 1800 600 163 to register for free SMS or email traffic alerts when traffic conditions change on this project Last edited: 28 May 2015 13:58
Last report received from DTMR: 2015-05-28T13:58:25
Special Events
MUSGRAVE STREET, COOLANGATTA, 4225 - Special Event All directions COOLY ROCKS ON - Musgrave St through to end of Marine Pde. Commencing: 28 May 2015, at 8:00am Concluding:08 June 2015, at 5:30pm Road closed both directions Long delays expected. Observe signage. Last edited: 22 May 2015 09:00
Last report received from DTMR: 2015-05-22T09:00:26
South West
Roadworks
WARREGO HIGHWAY, JACKSON, 4426 - Planned Roadworks Both Directions Just west of Jackson Township. Commencing: 25 May 2015, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding:26 June 2015, weather permitting. Single lane in operation Delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, reduced speed 40km/hr, Portable Traffic Signals with possible delays of up to 5mins. On Site after hours: Single lane in operation, reduced speed 60km/hr, Portable Traffic Signals with possible delays of up to 5mins. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 28 May 2015 11:49
Last report received from DTMR: 2015-05-28T11:50:31
MITCHELL HIGHWAY, CHARLEVILLE, 4470 - Planned Roadworks Both Directions Construction of Angellala Creek Bridge, approximately 30km south of Charleville. Commencing: 18 May 2015, between the hours of 6:00am and 6:00pm, 7 days a week. Concluding: 20 October 2015, weather permitting. No blockage No delays expected. Proceed with caution. On site During work hours: Reduced speed 40km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays. On site After work hours: Reduced speed 60km/hr, No blockage, constuction is isolated from traffic via a Sidetrack, no delays. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 28 May 2015 11:13
Last report received from DTMR: 2015-05-28T11:13:55
Wide Bay/Burnett
Road Closures/Load Limits
MONTO MOUNT PERRY ROAD, YARROL, 4630 - at the Burnett River Bridge Closed to all vehicles use alternative route. Last edited: 15 Apr 2015 15:24 Next update:as conditions change
Last report received from DTMR: 2015-04-15T15:24:43
Roadworks
ALICE STREET, MARYBOROUGH, 4650 - Planned Roadworks All directions Betweem John Lane and Fort Street. Commencing: 25 May 8:00am Concluding:30 June 2015, at 12:00am Lane or lanes reduced Delays expected. Changed traffic conditions. Works are scheduled to start on Monday 25 May 2015, and are expected to take about one month to complete, weather permitting. As there is not enough width in the road corridor for works to occur under two-way traffic, during this period a one-way detour will be in place for traffic wanting to travel eastbound through the works site to Lennox Street. The eastbound detour route will be via Ferry Street, Ann Street and Lennox Street. Single-lane access along Alice Street will remain available for westbound traffic for the duration of works. Detour signage will be put in place to assist motorists. Last edited: 22 May 2015 15:02
Last report received from DTMR: 2015-05-22T15:02:32
MIVA ROAD, MIVA, 4570 - Planned Roadworks All directions Dickabram Bridge on Miva Road. Commencing: 25 May 8:00am Concluding:27 July 2015, at 4:00pm Road closed both directions Delays expected. Use alternative route. To ensure crews can access all parts of the bridge safely and efficiently, temporary closures will be put in place. Load testing work will be carried out from Monday, 25 May, to Friday, 29 May, between 7am and 5pm, weather permitting. The bridge will be open to motorists at night. Structural works will be carried out from 1 June between 9.30am Monday and 1pm Friday, weather permitting. The bridge will remain closed at night and open to motorists at the weekend. During the closure, motorists should use the local road network or use Bauple-Woolooga Road. Variable message signs will be put in place at each end of Miva Road alerting motorists to the changed conditions ahead. Transport and Main Roads thanks everyone in advance for their patience and cooperation while these important bridge works are underway. If you require further information about the works, please contact the Bundaberg office on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au. Last edited: 22 May 2015 15:15
Last report received from DTMR: 2015-05-22T15:16:04
JOHN STREET, MARYBOROUGH, 4650 - Planned Roadworks All directions Commencing: 01 May 7:00pm Concluding:31 May 2015, at 6:00am Lane or lanes reduced Delays expected. Changed traffic conditions. Night-time asphalt works on sections of the state-controlled road network in Maryborough including: • a short section of Ferry Street near the Walker Street intersection • Walker Street between Ferry Street and John Street • John Street between Walker Street and Mouquet Lane Works involve removing sections of the existing pavement and replacing with asphalt to provide safer and smoother travelling conditions for motorists. Wide Bay Water is also taking the opportunity to complete works at the Walker and John streets intersection as part of this project. The works will require a full weekend closure of the intersection from 6pm on 1 May 2015 to 6pm on 3 May 2015. The entire project is expected to take about four weeks to complete, weather permitting Last edited: 30 Apr 2015 16:04
Last report received from DTMR: 2015-04-30T16:04:46
BURNETT BRIDGE, BUNDABERG CENTRAL, 4670 - Planned Roadworks Both Directions Commencing: Sunday 19 April at 8:00pm Concluding:late April, weather permitting Road closed both directions No delays expected. Use alternative route. Temporary night closures of the Burnett Traffic Bridge will begin on Sunday 19 April. Between 8pm and 5am, Sunday to Thursday, diversions will be in place and motorists are advised to use the Tallon Bridge as an alternative route. Full access will be restored across the bridge outside of these hours. Pedestrian access will remain available across the Burnett Traffic Bridge while works are underway. For further information, please phone Transport and Main Roads on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au. Last edited: 15 Apr 2015 15:22
Last report received from DTMR: 2015-04-15T15:22:38
BRUCE HIGHWAY, GLENORCHY, 4650 - Planned Roadworks Both Directions Between south of Eight Mile Road/Old Gympie Road and north of Seven Mile Road. Commencing: late April Concluding:late 2015, weather permitting Both lanes affected Delays expected. Allow extra travel time. Works will generally be undertaken between 6am and 6pm, Monday to Saturday. Motorists are advised to expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au. Last edited: 17 Apr 2015 11:57
Last report received from DTMR: 2015-04-17T11:57:58
WALKER STREET, BUNDABERG SOUTH, 4670 - Planned Roadworks Both Directions Between Maryborough Street and Barolin Street. Commencing: May 2015 Concluding:May 2015, weather permitting Lane or lanes reduced Delays expected. Traffic control on scene. Works will generally be undertaken between 6pm and 6am. Motorists are advised to expect changed conditions and observe all safety signage. Last edited: 20 Apr 2015 17:43
Last report received from DTMR: 2015-04-20T17:43:14
QUAY STREET, BUNDABERG CENTRAL, 4670 - Planned Roadworks Both Directions Various sections of Quay, Toonburra and Bourbong streets between the Bundaberg Court House and just east of the Kennedy Bridge. Commencing: late April Concluding:May 2015, weather permitting Lane or lanes reduced Delays expected. Traffic control on scene. Works will generally be undertaken between 6pm and 6am. Motorists should expect changed conditions and observe all safety signage. Last edited: 20 Apr 2015 17:41
Last report received from DTMR: 2015-04-20T17:41:39
MUNGAR ROAD, TIARO, 4650 - Planned Roadworks Both Directions Mary River Bridge. Commencing: Monday 20 April Concluding:late May, weather permitting Road closed both directions Delays expected. Use alternative route. The bridge will be closed to all traffic between 9am and 2.30pm, Monday to Friday. Full access will be restored across the bridge outside these times. Last edited: 17 Apr 2015 18:35
Last report received from DTMR: 2015-04-17T18:35:12
BRUCE HIGHWAY, DUCKINWILLA, 4650 - Planned Roadworks Both Directions Near Wongi State Forest, south of Torbanlea. Commencing: late April Concluding:Late 2015, weather permitting Lane or lanes reduced Delays expected. Allow extra travel time. Works will generally be undertaken from 6am to 6pm, Monday to Saturday. Motorists should expect changed conditions, including reduced speed limits and partial lane closures, while works are underway. For further information, contact Transport and Main Roads on 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au. Last edited: 17 Apr 2015 11:57
Last report received from DTMR: 2015-04-17T11:57:31
CHILDERS ROAD, BRANYAN, 4670 - Planned Roadworks Both Directions At the Cummins Road, Bonna Road and Palomino Avenue intersections. Commencing: Tuesday 27 January 2015 Concluding:Mid-May 2015, weather permitting Limited to one lane Delays expected. Observe signage. Last edited: 20 Mar 2015 14:22
Last report received from DTMR: 2015-03-20T14:22:05
MOUNT PERRY ROAD, BUNDABERG NORTH, 4670 - Planned Roadworks Both Directions Between Barber Street and Walters Street. Commencing: March 2015 Concluding:mid-2015 Partial lane closures Unknown traffic impact. Changed traffic conditions. Bundaberg Regional Council is undertaking works to upgrade a section of Mount Perry Road in North Bundaberg. Motorists are advised to expect changed traffic conditions, and should allow additional travel time. For further information, phone council on 1300 883 699. Last edited: 11 Mar 2015 15:58
Last report received from DTMR: 2015-03-11T15:58:07
TAKALVAN STREET, SVENSSON HEIGHTS, 4670 - Planned Roadworks Both Directions At the Walker Street intersection. Commencing: February Concluding:mid-2015, weather permitting Partial lane closures Delays expected. Changed traffic conditions. Last edited: 24 Mar 2015 16:15
Last report received from DTMR: 2015-03-24T16:15:39
BUNYA HIGHWAY, WOOROOLIN, 4608 - Planned Roadworks Both Directions Just north of Wooroolin. Commencing: Concluding:May 2015, weather permitting Limited to one lane Delays expected. Allow extra travel time. Last edited: 13 Feb 2015 12:42
Last report received from DTMR: 2015-02-13T12:42:59
GYMPIE ROAD, TINANA, 4650 - Planned Roadworks Both Directions Between Tinana Street and Schultz Bridge. Commencing: early February Concluding:mid-2015, weather permitting Partial lane closures Delays expected. Allow extra travel time. Works will generally be undertaken between 6am and 6pm, Monday to Friday. Motorists should expect delays if travelling during these hours, and are advised to allow additional travel time or use an alternative route if available. Some weekend and night works may also be undertaken as required. For further information contact Transport and Main Roads in Bundaberg on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au. Last edited: 05 Feb 2015 09:22
Last report received from DTMR: 2015-02-05T09:22:57
MONTO MOUNT PERRY ROAD, YARROL, 4630 - Planned Roadworks Both Directions Between the Burnett Highway and Kerwee Road. Commencing: late January Concluding:late 2015, weather permitting Road closed both directions No delays expected. Allow extra travel time. Works to seal three sections of Monto-Mount Perry Road, between the Burnett River and Eastern Creek, are underway. A full road closure is in place between the Burnett Highway and Kerwee Road, and all through traffic will be detoured via Kerwee Road while works are underway. Access will strictly be provided for local traffic only. Motorists should allow additional travel time while using the detour. We apologise for any inconvenience this may cause, and thank you for your patience and cooperation. For further information, contact Transport and Main Roads in Bundaberg on 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au Last edited: 10 Feb 2015 14:37