Road Conditions

Print this page

Region

QLD map - click for road conditions in each region
Click a region to view local road conditions

Road report information is compiled by RACQ in partnership with The Department of Transport and Main Roads, Queensland Police Service and other government sources/websites (see disclaimer).

Queensland State Government logoQueensland Police logo

1 - South Coast (Logan, Gold Coast, Boonah...) 2 - Metropolitan (Brisbane, Ipswich, Cleveland...) 3 - North Coast (Sunshine Coast, Caboolture, Redcliffe, Kilcoy, Esk...) 4 - Wide Bay & Burnett (Gympie, Bundaberg, Maryborough...) 12 - Darling Downs (Toowoomba, Miles, Stanthorpe...) 4 - Wide Bay & Burnett (Gympie, Bundaberg, Maryborough...) 5 - Fitzroy (Gladstone, Rockhampton, Emerald...) 6- Mackay/Whitsunday (Bowen, St. Lawrence, Clermont...) 7 - Northern (Ingham, Townsville, Ayr, Charters Towers...) 8- Far North (Cooktown, Cairns, Tully...) 9- North West (Mount Isa, Normanton, Hughenden...) 10- Central West (Boulia, Winton, Barcaldine, Blackall, Longreach...) 11- South West (Roma, St. George, Charleville...) 12 - Darling Downs (Toowoomba, Miles, Stanthorpe...) Please use the map detail (zoomed rectangle) above

Cause

Metropolitan
Special
LAIDLEY ROSEWOOD ROAD, LAIDLEY, 4341 - Special Event Westbound Royal Flying Doctors Service M+K 2014 Ridewest Brisbane to Longreach. Commencing: 02 May 2014, between the hours of approximately 7:00am and 5:00pm Concluding:08 May 2014 No delays expected. Motorists are urged to show patience. The following roads will be affected: DAY 1: 02 MAY 2014 Laidley Rosewood Rd Laidley Plainlands Rd Gatton Laidley Rd Gatton Helidon Rd Murphy's Ck Rd New England Highway Oakey Connection Rd DAY 2: 03 MAY 2014 Oakey Connection Rd Warrego Highway Oakey Pittsworth Rd Toowoomba Cecil Plains Rd Bowenville-Norwin Rd Dalby-Cecil Plains Rd Moonie Highway Daandine-Nandi Rd Dalby Kogan Rd Kogan Condamine Rd DAY 3: 04 MAY 2014 Kogan-Condamine Rd Leichhardt Highway Roma-Condamine Rd Carnarvon Highway (Surat-Roma) Warrego Highway (Roma) DAY 4: 05 MAY 2014 Warrego Highway (Roma-Mitchell) DAY 5: 06 MAY 2014 Warrego Highway (Mitchell-Morven) Landsborough Highway (Morven-Augathella) DAY 6: 07 May 2014 Landsborough Highway (Augathella-Blackall) DAY 7: 08 May 2014 Landsborough Highway (Blackall-Longreach) Last edited: 24 Mar 2014 12:05
Last report received from DTMR: 2014-04-21T07:50:21
MILTON ROAD, MILTON, 4064 - Special Event All directions Commencing: 27 April, at 5:00pm Concluding:27 April, at 7:30pm Medium delays expected. Use alternative route. The Brisbane Road V TBC A-league match will be held at Suncorp Stadium on Sunday 27th April, 2014, from 5:00pm. Roads closed for 2 ½ hours before and 1 hour after the event are: • Milton Rd inbound between Park Rd and Castlemaine St • Castlemaine St between Heussler Tce and Black St • Chippendall St, Finchley St, Mayneview St, and Parkview St, excepting local traffic. Other partial closure will be in place for 3 hours before and 1 hour after the event are: • Petrie Tce between Milton Rd and Caxton St, and • Upper Roma St inbound between Skew St and Countess St Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Suncorp Traffic Area on match days. Coronation Dr and Hale St will remain open at all times Last edited: 20 Apr 2014 23:15
Last report received from DTMR: 2014-04-21T07:50:21
MILTON ROAD, MILTON, 4064 - Special Event All directions Commencing: 25 April, at 8:00pm Concluding:25 April, at 10:30pm Medium delays expected. Use alternative route. The Brisbane Broncos V South Sydney Rabbitohs rugby leage game will be held at Suncorp Stadium on Friday 25th April, 2014, from 8:00pm. Major Roads closed for an hour following the Game: • Roma St inbound will be closed between Skew St and Turbot St. • Petrie Terrace closed between Milton Rd and Caxton St, excepting local traffic. • Milton Rd closed inbound between Park Rd and Petrie Tce, and • Caxton St closed between Hale St and Petrie Tce Coronation Dr and Hale St will remain open at all times. Re-directional signs will be placed on the major routes approaching the Stadium. Minor Roads closed for an hour following the Game are: • Cribb St between Railway Tce and Milton Rd. • Paten St, Black St, Granzella St. Minor Roads closed for 2 ½ hours before and 1 hour following the Game are: • Castlemaine St, Chippendall St Finchley St, Mayneview St, Parkview St, and Cordova St. Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Suncorp Traffic Area on match days. Last edited: 20 Apr 2014 22:15
Last report received from DTMR: 2014-04-21T07:50:21
ELIZABETH STREET, BRISBANE CITY, 4000 - Special Event All directions Brisbane CBD Streets. Commencing: 25 April, at 7:00am Concluding:25 April, at 1:00pm Medium delays expected. Diversions are in place. ANZAC DAY 2014 Brisbane City Council wishes to advise of the following road closures associated with this year’s ANZAC Day Parade and Dawn Service in Brisbane CBD on Friday 25th April, 2014 Dawn Service – Roads Closed 2am to 5am Adelaide and Ann Streets closed between George and Creek Street. Edward Street closed between Queen and Ann Street. Queen Sreet closed between Edward and Creek Street Main Parade From 7am to 1pm • Elizabeth St off ramp from the Riverside Expressway • Elizabeth Street between William and Creek Streets From 8am to 1pm • George Street between Ann and Margaret Street • William Street between Queen and Margaret Street (access for local traffic and buses only) • Albert Street between Adelaide and Charlotte Street • Mary Street between George and Albert Street • Charlotte Street between George and Albert Street • Adelaide Street between North Quay and Wharf Street • Creek Street between Ann and Elizabeth Street • Edward Street between Ann and Charlotte Street • Queen Street between William and Wharf Street • North Quay between Turbot and Queen Street • Burnett Lane between George and Albert Street • General Traffic lanes of the Victoria Bridge From 9am to 11am - Grey St, South Brisbane It is anticipated that the closures and diversions will cause moderate to significant traffic disruptions and delays. #83 Last edited: 27 Mar 2014 11:45
Last report received from DTMR: 2014-04-21T07:50:21
ANN STREET, BRISBANE CITY, 4000 - Special Event Westbound Commencing: 23 April, at 10:00am Concluding:23 April, at 12:00pm Medium delays expected. Diversions are in place. Brisbane City Council wishes to advise that Ann St, Brisbane CBD between Edward and Creek St shall be closed to all traffic on Wednesday 23rd April between the hours 10am until approximately 12 midday for the holding of the Student's Anzac Ceremony. Last edited: 21 Mar 2014 21:56
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
PACIFIC MOTORWAY, MACGREGOR, 4109 - Planned Roadworks Both Directions Commencing: 28 April, at 6:00pm Concluding:31 July, at 6:00pm Short delays expected. Changed traffic conditions. Bridge pier protection system upgrade works on the Pacific Motorway on MacGregor Street, Kessels Road and Tora Street overpass bridges will be carried from Monday 28 April to late July 2014, weather and construction conditions permitting. The works will be carried out 24 hours each day, from Sunday 6pm to Friday 6pm. One lane (the fast lane) will be closed each direction, northbound and southbound. Motorists can expect some traffic delays, construction noise and reduced speed limits through the work site. Traffic controllers will be on site. Last edited: 14 Apr 2014 10:07
Last report received from DTMR: 2014-04-21T07:50:21
CENTENARY HIGHWAY, FOREST LAKE, 4078 - Planned Roadworks Northbound Between Springfield Parkway Springfield and Logan Motorway. Commencing: 23 April, at 8:00pm Concluding:25 April, at 5:00am No delays expected. Use alternative route. Darra to Springfield Transport Corridor Stage 2 Richlands to Springfield Project Night closure: Centenary Highway northbound, Springfield to Forest Lake (23 & 24 April) Centenary Highway northbound will be temporarily closed between Springfield Parkway, Springfield and Logan Motorway, Forest Lake on Wednesday 23 & Thursday 24 April 2014, between 8pm and 5am (weather permitting). A detour will be in place along: 1. Springfield Parkway, Springfield 2. Old Logan Road, Camira 3. Formation Street, Carole Park 4. Boundary Road, Wacol 5. Progress Road, Wacol. Traffic control and signage will be in place to direct motorists. Please note this detour is for motorists only. Heavy vehicles should use Cunningham Highway. Please note that closures will also occur on Centenary Highway southbound. These closures will not be scheduled for the same nights. The northbound works will commence when the southbound works are complete. Motorists using the detour should plan their journey and allow extra travel time. Please slow down and drive carefully in the changed conditions. These closures are necessary for works to occur on the Centenary Highway Upgrade component of the Richlands to Springfield project. For more information, please contact the project team on 1800 067 684 or email info@trackstar.com.au. A detour map for motorists is available on the project website www.trackstar.com.au. Last edited: 17 Apr 2014 09:19
Last report received from DTMR: 2014-04-21T07:50:21
CENTENARY HIGHWAY, RICHLANDS, 4077 - Planned Roadworks Southbound Commencing: 22 April, at 8:00pm Concluding:24 April, at 5:00am No delays expected. Use alternative route. Darra to Springfield Transport Corridor Stage 2 Richlands to Springfield Project Night closures: Centenary Highway southbound (22 & 23 Apr) Centenary Highway southbound will be temporarily closed between Garden Road, Richlands and Springfield Parkway, Springfield on Tuesday 22 & Wednesday 23 April 2014, between 8pm and 5am (weather permitting). A 14km detour will be in place along: 1. Garden Road, Richlands 2. Progress Road, Richlands 3. Boundary Road, Wacol 4. Formation Street, Wacol 5. Old Logan Road, Camira 6. Springfield Parkway, Springfield 7. Centenary Highway, Springfield. Traffic control and signage will be in place to direct motorists. Access onto Centenary Highway southbound from Logan Motorway will also be affected. Motorists should follow detour signage. After these works are complete, night closures will occur on Centenary Highway northbound between Springfield Parkway, Springfield and Logan Motorway, Forest Lake. These closures will not occur simultaneously. Motorists using the detour should plan their journey and allow extra travel time. Please slow down and drive carefully in the changed conditions. These closures are necessary for works to be undertaken safely on the Centenary Highway Upgrade component of the Richlands to Springfield Project. For more information, please contact the project team on 1800 067 684 or email info@trackstar.com.au. A detour map for motorists is available on the project website www.trackstar.com.au. Last edited: 17 Apr 2014 10:16
Last report received from DTMR: 2014-04-21T07:50:21
GATEWAY MOTORWAY, TAIGUM, 4018 - Planned Roadworks Both Directions Routine maitenance - culvert cleaning and inspection. Commencing: 14 April, at 10:00am Concluding:30 June, at 5:00am Short delays expected. Changed traffic conditions. Routine maintenance works beside the Gateway Motorway between Nudgee (near the Nudgee Service Centre) and Sandgate Road, Taigum will require intermittent single lane closures to provide a safe location for equipment and work crews. Single lane closures and reduced speed limits may apply. Motorists may experience some minor delays. Work is expected to be completed by 30 June 2014. For more information, phone Transport and Main Roads on PH 1800288355. Last edited: 14 Apr 2014 09:58
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, GATTON, 4343 - Planned Roadworks All directions Near the intersection of Gatton Esk Road. Commencing: 14th April, 2014 at 06.00am Concluding: Mid May 2014 Medium delays expected. Traffic control on scene. WORK HOURS: 24 hours, 7 days a week, lane closed it both directions, speed reduced to 40km/hour with delays of up to 10 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 08 Apr 2014 08:00
Last report received from DTMR: 2014-04-21T07:50:21
MOUNT GRAVATT CAPALABA ROAD, WISHART, 4122 - Planned Roadworks Both Directions Between Broadwater Road and Gardner, Mount Petrie Roads. Commencing: 13 April, at 8:00pm Concluding:03 May, at 5:00am Short delays expected. Changed traffic conditions. Motorists are advised that construction of GUS2a will commence in early April 2014 and will continue through to late 2015, Site establishment works and ongoing relocation of underground services are occurring on Mount Gravatt-Capalaba Road between Broadwater and Mt Petrie/Gardner Roads from April 2014. Nightworks and temporary lane closures, east and westbound on Mount Gravatt-Capalaba Road, Wishart, will be required 8pm to 5am on the following dates: - from Sunday 13 to Thursday 17 April, - Tuesday 22 to Wednesday 23 April, and - Monday 28 April to Friday 2 May, 2014. Traffic control will be in place to guide motorists, as required. Please slow down - roadwork is your responsibility too. For further information contact the project team on 1800 799 686. A map and further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth. #101 Last edited: 10 Apr 2014 18:16
Last report received from DTMR: 2014-04-21T07:50:21
MOUNT GRAVATT CAPALABA ROAD, WISHART, 4122 - Planned Roadworks Both Directions Between Broadwater and Gardner, Mount Petrie Roads. Commencing: 13 April, at 8:00pm Concluding:31 December, at 5:00am Short delays expected. Changed traffic conditions. The Australian Government and Queensland Government are jointly funding the upgrade of Mt Gravatt-Capalaba Road (Broadwater to Gardner Road) as part of the second stage of Gateway Upgrade South projects. Works commenced in April 2014 and are scheduled for completion in late 2015, weather and construction conditions permitting. Works will be carried out Monday to Saturday between 7am and 5pm, with some night works as required. Minor traffic delays, lane closures and reduced speed limits through the work site may be expected. Traffic controllers will be on-site when required to ensure safety of road workers, motorists and pedestrians. Please slow down - roadwork is your responsibility too. For further information contact the project team on 1800 799 686. A map and further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth. #100 Last edited: 10 Apr 2014 18:43
Last report received from DTMR: 2014-04-21T07:50:21
GATEWAY MOTORWAY, DEAGON, 4017 - Planned Roadworks Both Directions At Cabbage Tree Creek . Commencing: 10 April, at 8:00pm Concluding:30 July, at 5:00am Short delays expected. Traffic control on scene. From early April to August 2014, there will be intermittent night time traffic stoppages and traffic control on the Gateway Motorway at Cabbage Tree Creek, Deagon to allow the safe installation of bridge piles. When required, the night works will take place between 8pm and 5am and short-term traffic stoppages of up to 10 minutes may be experienced for safety reasons. For more information, contact the Gateway Additional Lane project, phone 1800 897 778 Last edited: 07 Apr 2014 09:12
Last report received from DTMR: 2014-04-21T07:50:21
WARDELL STREET, ENOGGERA, 4051 - Planned Roadworks Outbound Commencing: 09 April, at 8:37pm Concluding:13 May, at 12:00am No delays expected. Reduced speed limit (40km/h). Work in footpath on Wardell Street between Lloyd Street and Audrey Street in Enoggera. Speed limit reduced to 40 km/hour. Motorists outbound on Wardell Street may be stopped temporarily to allow for construciton vehicle movements. #99 Last edited: 09 Apr 2014 20:44
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, POSTMANS RIDGE, 4352 - Planned Roadworks Westbound Guardrail damage repairs West of Connoles Road. Commencing: 9th April 2014 Concluding: TBA No delays expected. Reduced speed limit (80km/h). Last edited: 10 Apr 2014 13:22
Last report received from DTMR: 2014-04-21T07:50:21
OLD CLEVELAND ROAD, BELMONT, 4153 - Planned Roadworks Both Directions Commencing: 07 April, at 7:00pm Concluding:30 June, at 5:00am Short delays expected. Changed traffic conditions. Works are occurring on the Old Cleveland and Stanbrough Roads intersection, Belmont from late 7 April 2014 to late June 2014, weather and constuction conditions permitting. Overnight works will be carried out Monday to Friday between 7pm and 5am, and some day works will occur Monday to Friday between 9am and 3pm. Traffic delays, some construction noise and reduced speed limits may be expected through the work site. Traffic controllers will be on-site when required to ensure safety of road workers and motorists. # 94 Last edited: 04 Apr 2014 00:13
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, PLAINLAND, 4341 - Planned Roadworks Both Directions Commencing: 07 April, at 6:00am Concluding:20 June, at 5:00pm Short delays expected. Changed traffic conditions. The Department of Transport and Main Roads would like to advise of upcoming works on the eastern and western sides of the Summerholm Road intersection of the Warrego Highway, Plainlands (chainage 38.94 – 40.70km). Work will be carried out from Monday 7 April 2014 until Friday 20 June 2014 between 6am to 5pm, weather and construction conditions permitting. During construction, traffic delays, lane closures and construction noise can be expected. Last edited: 15 Apr 2014 08:36
Last report received from DTMR: 2014-04-21T07:50:21
BRISBANE STREET, IPSWICH, 4305 - Planned Roadworks Both Directions At Milford Street. Commencing: 06 April, at 7:00pm Concluding:31 May, at 5:00am Short delays expected. Changed traffic conditions. Works are occurring on the Brisbane and Milford Streets intersection, Ipswich from 6 April to 31 May 2014, weather and construction conditions permitting. Work will generally be carried out Sunday to Thursday between 7pm and 5am. Occasional daytime works may be required between 10am and 2pm. Changed traffic conditions include minor traffic delays, lane closures, pedestrian detours, reduced speed limits and traffic control. #90 Last edited: 01 Apr 2014 15:56
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, CROWLEY VALE, 4342 - Planned Roadworks Both Directions Approximately between the intersection with Forest Hill Fernvale Road and Crowley Vale Road. Commencing: 04 April 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: 30 September 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Traffic under Contraflow, Reduced Speed Limit 60km/h, Possible delays of up to 5 minutes. On Site During NON working hours: Traffic under Contraflow, Reduced Speed Limit 60km/h Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 07 Apr 2014 12:12
Last report received from DTMR: 2014-04-21T07:50:21
SAMFORD ROAD, ENOGGERA, 4051 - Planned Roadworks Both Directions Commencing: 02 April, at 12:01am Concluding:02 May, at 11:59am No delays expected. Changed traffic conditions. Samford Road and Wardell Street intersection upgrade inbound traffic on Samford Road at Enoggera, near Imbros Street, will be diverted onto a newly constructed temporary side track on 2 April 2014. There will also be changes for outbound traffic. Signage will be in place to direct motorists. From this time motorists will no longer be able to make a right turn into or out of Ardentallen Road, Malcolm Street and Cairo Street. Norman Terrace will become a permanent cul-de-sac at its intersection with Samford Road. The speed limit for traffic through this area is 40 km/hour. For more information, please phone the project team on 1800 045 348. Last edited: 27 Mar 2014 11:54
Last report received from DTMR: 2014-04-21T07:50:21
DRAYTON STREET, LAIDLEY, 4341 - Planned Roadworks Eastbound Narda Lagoon,between Pioneer Street and Vaux Street, Laidley . Commencing: 24 March 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: 31 May 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Please proceed with caution. On Site During NON working hours: Single lane in operation, Reduced Speed Limit 40km/h. Portable traffic signals with possible delays of up to 5 minutes, Please proceed with caution. Last edited: 24 Mar 2014 12:06
Last report received from DTMR: 2014-04-21T07:50:21
CREEK ROAD, CARINDALE, 4152 - Planned Roadworks Both Directions Between Old Cleveland Road to Winstanley Street and Millenium Boulevard Carindale to Creek Road to Bedivere Street . Commencing: 21 March, at 6:00am Concluding:15 November, at 6:00pm Short delays expected. Use alternative route. Brisbane City Council- Field Services Group will be replacing the northbound road bridge. Northbound traffic will travel via a contra flow closure over the median island onto the southern road and continue north in the median lane and return to the northern roadway after the bridge working area. Southbound traffic will be reduced to two lanes. Closures will be continuous from 6am Friday 21st March through to 6pm Saturday 15th November. Motorists are advised to avoid this section of Creek Rd and seek alternate routes in this area. For more information please contact Sarah Gladstone from City Projects Office on 07-3403 8888 Last edited: 18 Mar 2014 11:21
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, MARBURG, 4346 - Planned Roadworks Both Directions Commencing: 28 February, at 6:00am Concluding:15 May, at 6:00am Short delays expected. Changed traffic conditions. Reconstruction works on the Warrego Highway at Marburg. Works will be carried out consecutively on the eastbound and westbound carriageways from approximately Peipers Road to Seminary Road. Changed traffic conditions include reduced speed limits and contraflow. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au #53 Last edited: 25 Feb 2014 11:03
Last report received from DTMR: 2014-04-21T07:50:21
GEHRKE ROAD, PLAINLAND, 4341 - Planned Roadworks All directions Commencing: 10 February 7:00am Concluding:10 May, at 5:00pm Short delays expected. Changed traffic conditions. he Department of Transport and Main Roads will undertake safety improvement works on Gehrke Road between the Warrego Highway off ramp and Laidley-Plainlands Road, outside Schultes Central, Plainlands. Works will be carried out from Monday 10 February until late April 2014 between 7am to 5pm, weather and construction conditions permitting. Minor traffic delays, construction noise, and reduced speed limits through the work site may be expected. Traffic controllers will be in place to ensure the safety of road workers, motorists, pedestrians and cyclists as well as managing traffic flow. This project will improve road safety for motorists, pedestrians and cyclists. The Department of Transport and Main Roads apologises for any inconvenience these works may cause and appreciates your patience while these important works are being carried out. 29 Last edited: 03 Feb 2014 20:09
Last report received from DTMR: 2014-04-21T07:50:21
CLEVELAND REDLAND BAY ROAD, VICTORIA POINT, 4165 - Planned Roadworks Both Directions Commencing: 10 February 6:00am Concluding:15 May, at 5:00pm Short delays expected. Changed traffic conditions. The Department of Transport and Main Roads will undertake works to rehabilitate two corrugated steel pipe culverts at Moogurropum Creek on Cleveland-Redland Bay Road. Works will be carried out from Monday 10 February until Thursday 15 May 2014 between 6am to 5pm, weather and construction conditions permitting. Night works will take place for one week at the start of construction period (7pm-5am) and occasionally thereafter. Minor traffic delays, construction noise, single lane closures and reduced speed limits through the work site may be expected. Traffic controllers will be in place to ensure the safety of road workers, motorists, pedestrians and cyclists as well as managing traffic flow. 27 Last edited: 03 Feb 2014 19:51
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, BLACKSOIL, 4306 - Planned Roadworks Both Directions Permanent closure of right turn from Warrego Highway eastbound into Wulkuraka Connection Road at Blacksoil. Also permanent closure of right turn out of Wulkuraka Connection Road onto Warrego Highway. Commencing: 06 February, at 8:00pm Concluding:06 July, at 11:59pm Short delays expected. Changed traffic conditions. From 7 February 2014, the right turn from the Warrego Highway eastbound to Wulkuraka Connection Road will close permanently. Traffic wishing to access Wulkuraka Connection Road will need to use the Pine Mountain Road interchange to access the westbound Warrego Highway lanes. Additionally, the right turn from Wulkuraka Connection Road onto the warrego Highway eastbound will also close permanently. Motorists will be able able to access the warrego highway eastbound via a new u-turn facility on the westbound carriageway, slightly west of Wulkuraka Connection Road. For more information, contact the project team on 0418 495 367 Last edited: 03 Feb 2014 21:01
Last report received from DTMR: 2014-04-21T07:50:21
FOREST HILL FERNVALE ROAD, FOREST HILL, 4342 - Planned Roadworks Both Directions First Location: between approximately Glendene Road and Harvey Road Forest Hill. Second Location: between approximately Lockrose Road Lockrose and intersection Coominya Connection Road. Commencing: 03 February 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday, Concluding:30 June 2014, weather permitting Short delays expected. Changed traffic conditions. On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Single lane in operation, Traffic Control with possible delays of up to 5 minutes. On Site During NON working hours: Reduced speed limit 60km/h Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 05 Feb 2014 17:55
Last report received from DTMR: 2014-04-21T07:50:21
GATTON LAIDLEY ROAD WEST, GATTON, 4343 - Planned Roadworks Both Directions Three sites between approximately Hausers/Fitzgerald Road Gatton and Burnham Street Forest Hill.. Commencing: 03 February 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday, Concluding:30 June 2014, weather permitting Short delays expected. Changed traffic conditions. On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Single lane in operation, Traffic Control with possible delays of up to 5 minutes. On Site During NON working hours: Reduced speed limit 60km/h Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 05 Feb 2014 18:03
Last report received from DTMR: 2014-04-21T07:50:21
BEAUDESERT ROAD, PARKINSON, 4115 - Planned Roadworks Both Directions Commencing: 03 February, at 6:00am Concluding:30 June, at 6:00pm Short delays expected. Changed traffic conditions. The Department of Transport and Main Roads will complete safety improvement works on Beaudesert Road. The works will involve pedestrian crossing facilities improvements,guardrail installation, roadside hazard removal, signage and line marking, and electrical works (replacing light poles). These weekday works will be implemented in stages and are planned to commence: * Early February 2014- until mid June 2014 * Construction will occur primarily during the day from 6:00am until 4:00pm Monday- Friday * Occasional night work 8:00pm- 6:00am Works are subject to weather and construction conditions. Every effort will be made to minimize the impacts on the local community and we thank you for your cooperation and patience during these important works. Phone: 131940 for traffic reports and incidents Last edited: 23 Jan 2014 22:30
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, HELIDON SPA, 4344 - Planned Roadworks Both Directions Between Helidon exit and Kelly's Road. Commencing: 03 February 2014, 24hours a day 7 days a week, Concluding:15 August 2014, weather permitting Short delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 60km/h, Possible delays of up to 5 minutes. On Site During NON working hours: Reduced Speed Limit 60km/h Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 04 Feb 2014 10:54
Last report received from DTMR: 2014-04-21T07:50:21
KESSELS ROAD, UPPER MOUNT GRAVATT, 4122 - Planned Roadworks Both Directions Macgregor Street Logan Road Newnham Road and Link Street East. Commencing: 27 January, at 8:00pm Concluding:15 July, at 5:00am Short delays expected. Changed traffic conditions. Nightworks are occurring (in front of the shopping complex) from Kessels Road up to the Logan Road intersection, Logan Road and up to Link Street - Newnham Road intersections, and Macgregor Street (near bus depot). These works will be undertaken from late January 2014 until mid July 2014, weather and construction conditions permitting between 8pm and 5am, Sunday to Friday. Occasional daytime works may be required between 10am and 3pm, Monday to Saturday. Works include realignment of kerbing and medians, road widening and improved turning lanes, street lighting and signal upgrades, stormwater drainage upgrades, and footpath and cycleway construction, and landscaping. For more information please contact the project hotline on 0427 784 606. Last edited: 16 Apr 2014 16:10
Last report received from DTMR: 2014-04-21T07:50:21
PACIFIC MOTORWAY, ROCHEDALE, 4123 - Planned Roadworks Both Directions Commencing: 18 January, at 9:00am Concluding:01 May, at 9:00am Short delays expected. Changed traffic conditions. The Australian Government and Queensland Government are jointly funding the upgrade of the Gateway Motorway southbound on-ramp to the Pacific Motorway. In addition, the Queensland Government has contributed funding towards the extension of the South East Busway. Works commenced in late 2012 and are scheduled for completion in 2014, weather and construction conditions permitting. Works will be carried out Monday to Friday between 6am and 5pm and Saturdays 6am to 2pm, with some night works and Sundays as required. Minor traffic delays, lane closures and reduced speed limits through the work site may be expected. Traffic controllers will be on-site when required to ensure safety of road workers, motorists and pedestrians. Works will include: Realigning a section of the Gateway Motorway on-ramp to the Pacific Motorway to improve safety. Lengthening the on-ramp by 500 metres to provide motorists more time to merge. Extending the South East Busway from Eight Mile Plains to School Road, Rochedale to provide improved connection and reduced travel time for buses servicing the Rochedale area. For further information about the project contact 1800 799 686 or visit the TMR website. #12 Last edited: 17 Jan 2014 18:13
Last report received from DTMR: 2014-04-21T07:50:21
MURPHYS CREEK ROAD, MURPHYS CREEK, 4352 - Planned Roadworks Both Directions Approximately 21 separate works sites, 1 kilometer each in length. Starting at Postmans Ridge and finishing at Lucks Road (Ballard). Commencing: 15 January 2014, between the hours of 6:00am and 6:00pm, 6 days a week. (Monday to Saturday) Concluding:30th of April 2014, weather permitting. Long delays expected. Changed traffic conditions. On Site during working hours (6am-6pm): Single lane in operation, Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 30 minutes. On Site During NON working hours: Single lane in operation, Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 10 Jan 2014 12:54
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, MARBURG, 4346 - Planned Roadworks Both Directions Commencing: 06 January, at 6:00am Concluding:30 April, at 6:00am Short delays expected. Changed traffic conditions. Reconstruction works will begin in January 2014 to repair pavement damage on the Warrego Highway at Marburg approximately 1km east of Peipers Road to Telrader Road Changed traffic conditions include temporary lane closures in December to prepare for the implementation of contraflow when construction construction begins. For more information please contact project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au Last edited: 11 Dec 2013 21:12
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, BLACKSOIL, 4306 - Planned Roadworks All directions Commencing: 18 December, at 8:00pm Concluding:30 April, at 5:00am Short delays expected. Changed traffic conditions. From 18 December 2013, the right turn from the Warrego Highway westbound to Eleazer Drive will close permantly. Traffic wishing to access Eleazer Drive will need to use the Brisbane Valley Highway exit, turn onto the Warrego Highway eastbound and then turn left into Eleazar Drive. Last edited: 14 Jan 2014 11:32
Last report received from DTMR: 2014-04-21T07:50:21
GATTON LAIDLEY ROAD WEST, GATTON, 4343 - Planned Roadworks Both Directions Between the intersection Gatton Helidon Road and John Street Laidley. Commencing: 17 September 2013, between the hours of 6:00am to 6:00pm, Monday to Saturday Concluding:April 2014, weather permitting Short delays expected. Changed traffic conditions. On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Traffic Control with possible delays of up to 5 minutes. On Site During NON working hours: Reduced Speed Limit 40km/h, obey signage and proceed with caution Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 11 Dec 2013 21:12
Last report received from DTMR: 2014-04-21T07:50:21
SIR SAMUEL GRIFFITH DRIVE, MOUNT COOT-THA, 4066 - Planned Roadworks Commencing: 11 February, at 6:30am Concluding:01 February, at 6:30am No delays expected. Use alternative route. From mid-February 2013, Transcity will close a lower section of Sir Samuel Griffith Drive to create increased car parking for the Legacy Way project. Due to the capacity of the current workforce car parking, approximately 150 additional car spaces are required in this area. Construction of car spaces on both sides of the lower section of Sir Samuel Griffith Drive will take approximately four to six weeks. Access to the area will not be available to the general public until 2015. Construction of a car park in this location has been approved by the Queensland Coordinator General and Brisbane City Council. Local residents and key stakeholders have been notified of this activity. Last edited: 11 Dec 2013 21:12
Last report received from DTMR: 2014-04-21T07:50:21
WESTERN FREEWAY ON RAMP, TOOWONG, 4066 - Planned Roadworks Both Directions For Legacy Way construction. Commencing: 6:30am to 6:30pm, Monday to Saturday Concluding:Late 2014 No delays expected. Observe signage. Construction of Legacy Way (formerly Northern Link) has commenced at the western work site, on the northern side of the Western Motorway in Toowong. Legacy Way is a 4.6km underground toll road that will connect the Western Motorway, at Toowong, with the Inner City Bypass, at Kelvin Grove. For more information contact the project team on 1800778772 or www.transcityjv.com.au Last edited: 11 Dec 2013 21:12
Last report received from DTMR: 2014-04-21T07:50:21
South Coast
Roadworks
PACIFIC HIGHWAY, WORONGARY, 4213 - Planned Roadworks Both Directions Construction on the Pacific Motorway between Worongary (Exit 77) and Robina (Exit 82) will cease on Friday 18 April 2014 and resume on Tuesday 22 April 2014. Commencing: March 2013 Concluding:Mid 2014 Unknown traffic impact. Allow extra travel time. Please drive safe and take note of speed limits and signage. Last edited: 18 Apr 2014 15:30
Last report received from DTMR: 2014-04-21T07:50:21
PACIFIC MOTORWAY, SPRINGWOOD, 4127 - Planned Roadworks Both Directions Night works with lane closures through to 31 May 2014. Commencing: 09 April 8:00pm Concluding:31 May, at 8:00pm Short delays expected. Changed traffic conditions. night works with lane closures through to 31 May 2014 Last edited: 09 Apr 2014 10:44
Last report received from DTMR: 2014-04-21T07:50:21
BERMUDA STREET, MERMAID WATERS, 4218 - Planned Roadworks All directions Traffic signal upgrade at the intersection of Cottesloe Drive during April and May. Day works - Monday to Friday: 7am - 4pm and/or Night works - Monday to Thursday: 6pm - 3:30am . Commencing: 07 April 7:00am Concluding:30 May, at 4:00pm Short delays expected. Proceed with caution. Last edited: 01 Apr 2014 08:28
Last report received from DTMR: 2014-04-21T07:50:21
BRISBANE ROAD, ARUNDEL, 4214 - Planned Roadworks Traffic signal upgrade at the intersection of Olsen Avenue and Oxley Drive during April and May Day Works- Monday to Friday: 7am - 4pm and/or Night Works - Monday to Thursday: 6pm - 3:30am Single lane closure under traffic control as required. Commencing: 07 April 7:00am Concluding:30 May, at 4:00pm Short delays expected. Proceed with caution. Last edited: 31 Mar 2014 14:22
Last report received from DTMR: 2014-04-21T07:50:21
GOLD COAST HIGHWAY, BILINGA, 4225 - Planned Roadworks All directions Traffic signal upgrade at the intersection of Kirribin Street during April and May Day works - Monday to Friday: 7am - 4pm and/or Night works - Monday to Thursday: 6pm - 3:30am Single lane closure under traffic control as required.. Commencing: 07 April 7:00am Concluding:30 May, at 4:00pm Short delays expected. Proceed with caution. Last edited: 07 Apr 2014 08:37
Last report received from DTMR: 2014-04-21T07:50:21
PACIFIC MOTORWAY, VARSITY LAKES, 4227 - Planned Roadworks Varsity Lakes Interchange - Exit 84 - Southbound off-ramp - for motorists heading west on Stapley Drive. Night works Sunday to Thursday: 7pm - 5am. Commencing: 06 April 7:00pm Concluding:22 April, at 5:00am Short delays expected. Proceed with caution. Last edited: 27 Mar 2014 07:11
Last report received from DTMR: 2014-04-21T07:50:21
MOUNT LINDESAY HIGHWAY, MOUNT LINDESAY, 4287 - Planned Roadworks Both Directions Works to repair 8 landslips in a 5 kilometre section of road south of Palen Creek, around 20kms south of Rathdowney. Commencing: 01 April, at 6:00am Concluding:31 August, at 9:00am Short delays expected. Allow extra travel time. During each landslip repair, the road near the works will be reduced to one lane with mobile traffic signals directing traffic one way at a time. No works will occur between Easter and Anzac Day. Works resume on 28 April 2014. Last edited: 17 Apr 2014 17:12
Last report received from DTMR: 2014-04-21T07:50:21
BEAUDESERT NERANG ROAD, NERANG, 4211 - Planned Roadworks All directions At intersection with McLaren Road. Commencing: 31 March, at 7:00pm Concluding:02 May, at 5:00am No delays expected. Changed traffic conditions. Electrical works are being carried out at the intersection of Beaudsert-Nerang Road and McLaren Road. Traffic signals will need to be switched off during some stages of this work. Police will control traffic through the intersection during those times. Night works. Last edited: 09 Apr 2014 14:18
Last report received from DTMR: 2014-04-21T07:50:21
SOUTHPORT NERANG ROAD, ASHMORE, 4214 - Planned Roadworks Both Directions From Ashmore Road to Moora Street. Commencing: 31 March, at 6:30am Concluding:mid-May 2014 Short delays expected. Changed traffic conditions. Construct of on-road cycle lanes on Southport–Nerang Road from Ashmore Road to Moora Street. The Cotlew Street intersection will be changed to a high angle entry left turn movement. Last edited: 28 Mar 2014 11:50
Last report received from DTMR: 2014-04-21T07:50:21
KINGSTON ROAD, LOGANLEA, 4131 - Planned Roadworks All directions Traffic signal upgrade at the intersection of Monash Road. Day works Monday to Friday: 7am - 4pm Night works Monday to Thursday 6pm - 3:30am. Commencing: 24 March 7:00am Concluding:05 May, at 4:00pm Short delays expected. Traffic control on scene. Last edited: 15 Apr 2014 13:22
Last report received from DTMR: 2014-04-21T07:50:21
KINGSTON ROAD, WATERFORD WEST, 4133 - Planned Roadworks All directions Traffic signal upgrade at the intersection of Muchow Road. Day works Monday to Friday: 7am - 4pm Night works Monday to Thursday 6pm - 3:30am. Commencing: 24 March, at 7:00am Concluding:05 May, at 4:00pm Short delays expected. Traffic control on scene. Last edited: 15 Apr 2014 13:21
Last report received from DTMR: 2014-04-21T07:50:21
MUNDOOLUN CONNECTION ROAD, WONGLEPONG, 4275 - Planned Roadworks Both Directions Between Beaudesert–Nerang Road (Wonglepong Road) and Beaudesert–Beenleigh Road. Commencing: 10 March, at 6:30am Concluding:30 June, at 5:00pm Short delays expected. Changed traffic conditions. The project includes • upgrading the intersection at Bambling Road to provide a dedicated right turn lane for northbound traffic • installing flag lighting at the intersections of Wonglepong Road, Bambling Road, Wagonwheel Road, Biddaddaba Road and Chestnut Road • installing audio tactile linemarking in sections between Wagonwheel Road and Chestnut Road • improving delineation along the entire length • widening a portion of the road shoulders between Wagonwheel Road and Biddaddaba Road. Last edited: 04 Mar 2014 16:51
Last report received from DTMR: 2014-04-21T07:50:21
LAMINGTON NATIONAL PARK ROAD, CAINBABLE, 4285 - Planned Roadworks Both Directions 14 to 20 kilometres from the start of the road at Canungra. Commencing: 02 March, at 6:00pm Concluding:31 July, at 12:00am Short delays expected. Allow extra travel time. Day works - 6am to 6pm Monday to Friday with single lane closure No works will occur between Easter and Anzac Day. Works resume on 28 April 2014. Last edited: 17 Apr 2014 17:10
Last report received from DTMR: 2014-04-21T07:50:21
PACIFIC MOTORWAY, UPPER COOMERA, 4209 - Planned Roadworks Both Directions Asphalt overlay work on Exit 54 on and off ramps, roundabouts and overpass. Commencing: 18 February 8:00pm Concluding:31 May, at 5:00am Medium delays expected. Changed traffic conditions. Asphalt overlay work on Exit 54 on and off ramps, roundabouts and overpass between 8pm and 5am Sunday to Thursday. Last edited: 06 Mar 2014 12:28
Last report received from DTMR: 2014-04-21T07:50:21
GOLD COAST SPRINGBROOK ROAD, SPRINGBROOK, 4213 - Planned Roadworks Both Directions Commencing: 06 February, at 6:00am Concluding:May 2014 Short delays expected. Changed traffic conditions. Landslip repairs are occurring on GC-Springbrook Road from Austinville Road through to 7 kilometres further up the road. Stop/go traffic control in place Monday to Friday, 6am to 5pm with short delays expected. No works will occur between Easter and Anzac Day. Works resume on 28 April 2014. Last edited: 17 Apr 2014 17:13
Last report received from DTMR: 2014-04-21T07:50:21
Incidents
PACIFIC HIGHWAY, MUDGEERABA, 4213 - Stationary Vehicle Southbound Vehicle in lanes. Between Exit 82 and 85. Short delays expected. Proceed with caution. Last edited: 21 Apr 2014 07:47
Last report received from DTMR: 2014-04-21T07:50:21
North Coast
Road Closures/Load Limits
KIN KIN ROAD, KIN KIN, 4571 - Open (with caution) Proceed with caution. Kin Kin Road, Kin Kin. One lane closed near Turnbull Road near top of range. Traffic control is in place. Reduced speed limit. Short delays expected. Restriction of 2.5m width and 19m length apply through this site. Observe signage and vehicle restrictions. Last edited: 17 Apr 2014 08:33
Last report received from DTMR: 2014-04-21T07:50:21
ESK HAMPTON ROAD, ESK, 4312 - Open (with caution) Observe signage. Last edited: 16 Apr 2014 14:31
Last report received from DTMR: 2014-04-21T07:50:21
LOUIS BAZZO DRIVE, COOTHARABA, 4565 - Boreen Road Six Mile Creek Closed to all vehicles Last edited: 15 Apr 2014 11:19
Last report received from DTMR: 2014-04-21T07:50:21
KENILWORTH BROOLOO ROAD, KENILWORTH, 4574 - Closed from 3 March Closed to all vehicles Use alternative route. Medium sized slip below road. Road reconstruction work Diversions via Eumundi Kenilworth Road Tuchekoi Road Last edited: 11 Apr 2014 10:34
Last report received from DTMR: 2014-04-21T07:50:21
KIN KIN ROAD, KIN KIN, 4571 - Open (with caution) Proceed with caution. Temporary traffic signals in place between Main Street Kin Kin and Murrays Road Kin Kin Last edited: 03 Apr 2014 10:32
Last report received from DTMR: 2014-04-21T07:50:21
OBI OBI ROAD, OBI OBI, 4574 - Subject to a 10 tonne GVM limit Observe signage. Obi Obi Road, Obi Obi – The downhill section of Obi Obi Road westbound between Mapleton and Kenilworth is open to traffic. Last edited: 20 Mar 2014 13:36
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
KILCOY MURGON ROAD, JIMNA, 4515 - Planned Roadworks All directions Road repairs, will be carried out on three sections of road approximately 6km, 12km and 13km north of Kilcoy.Works will be carried out between 7am and 6pm from Monday to Friday. Some works may be undertaken on Saturdays. . Commencing: 14 April, at 7:00am Concluding:30 September, at 6:00pm Short delays expected. Changed traffic conditions. The Department of Transport and Main Roads is undertaking reconstruction works on Kilcoy-Murgon Road at Sheep Station Creek to repair damage and will be carried out on three sections of road approximately 6km, 12km and 13km north of Kilcoy. Crews will complete one site at a time to reduce the delays for motorists and impacts on residents. The project is expected to be completed by the end of September, weather permitting. Traffic arrangements Works will be carried out between 7am and 6pm from Monday to Friday. Some works may be undertaken on Saturdays. Each site will operate as a single lane under traffic control while reconstruction work is underway. The road will be open to two lanes throughout the Easter long weekend. Reduced speed limits will apply through the work sites for the safety of roadworkers and all road users. Signage will be in both directions to advise motorists of changes to traffic conditions and any restrictions. Motorists may experience delays. If you would like further information about the project, please contact the project team on 1800 459 366 or via email on norc_reconstruct@tmr.qld.gov.au. Last edited: 11 Apr 2014 14:57
Last report received from DTMR: 2014-04-21T07:50:21
BRISBANE VALLEY HIGHWAY, WIVENHOE POCKET, 4306 - Planned Roadworks All directions Deformation survey being conducted along Wivenhoe Dam Wall. Shoulder closures.. Commencing: 31 March, at 8:00am Concluding:27 March, at 4:00pm No delays expected. Proceed with caution. Last edited: 27 Feb 2014 15:42
Last report received from DTMR: 2014-04-21T07:50:21
MAROOCHYDORE ROAD, KULUIN, 4558 - Planned Roadworks Both Directions From Martins Creek Bridge and Main Road/Jones Road. From Sunshine Motorway east to Main Road/Greig Street. Commencing: 30 March, at 6:00pm Concluding:11 May, at 6:00am Short delays expected. Proceed with caution. Pavement rehabilitation works will be undertaken on Maroochydore Road from Martins Creek Bridge to Main Road/Jones Road, and from the Sunshine Motorway east to Main Road/Grieg Street. Works are due to commence on 30 March 2014 and are expected to take six weeks to complete, weather permitting. Rehabilitation works will be undertaken in two sections with the first between Martins Creek Bridge and Main Road/Jones Road, and the second from the Sunshine Motorway to Main Road/Grieg Street. Works will be carried out on both carriageways. To minimise traffic disruptions, works will be carried out between 6pm and 6am, Sunday to Thursday. Lane closures and reduced speed limits will apply during the works. Traffic controllers and construction signage will also be in place to safeguard motorists and road workers. For further information, please contact Mr Shane Kelley, Operations Coordinator, on 3249 0420 between the hours of 9am and 4pm, Monday to Friday. For up-to-date information on traffic disruptions please visit www.131940.qld.gov.au or phone 13 19 40. Last edited: 25 Mar 2014 14:52
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, PRENZLAU, 4311 - Planned Roadworks Both Directions Intersection Warrego Highway, Waldron Road and Hermanns Road. Commencing: 31 March 2014, between the hours of 9:00am and 3:00pm, Monday to Friday. Concluding: 30 April 2014, weather permitting No delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed 40km/hr, Eastbound left land closed. Westbound shoulder closed. Please proceed with caution. On Site During NON working hours: Returned to normal traffic conditions. Last edited: 03 Apr 2014 14:08
Last report received from DTMR: 2014-04-21T07:50:21
DAVID LOW WAY, BLI BLI, 4560 - Planned Roadworks Both Directions Between Petrie Creek Bridge and Maroochy River Bridge. Commencing: 24 March, at 6:30am Concluding:30 June, at 5:00pm Short delays expected. Proceed with caution. Last edited: 24 Mar 2014 15:19
Last report received from DTMR: 2014-04-21T07:50:21
WIVENHOE SOMERSET ROAD, CROSSDALE, 4312 - Planned Roadworks Both Directions Sandy Creek. Commencing: 24 March, at 6:00am Concluding:30 May, at 5:00pm Short delays expected. Traffic control on scene. Work will involve reconstructing the existing road to realign the curve and upgrading the existing guard rail on the approach to Sandy Creek Bridge. Works will be undertaken between 6am and 5pm, Monday to Friday, and expected to take up to eight weeks to complete, weather permitting. Motorists may experience some minor traffic disruptions during the works. Temporary traffic signals, reduced speed limits, traffic controllers, and road signage will be in place. For further information, please call 5451 7055 or email northcoast@tmr.qld.gov.au. For up-to-date information on traffic conditions, please visit www.131940.qld.gov.au or call 13 19 40. Last edited: 20 Mar 2014 17:07
Last report received from DTMR: 2014-04-21T07:50:21
EUMUNDI KENILWORTH ROAD, BELLI PARK, 4562 - Planned Roadworks Both Directions Commencing: 17 March, at 7:00am Concluding:30 April, at 6:00pm Short delays expected. Reduced speed limit (40km/h). Commencing Monday 17 March 2014. Eumundi Kenilworth Road Belli Park. Planned Roadworks both directions. Reduced speed limits and traffic control on the Eumundi Kenilworth Rd at Belli Park. One lane closed and 40 km speed limit during work hours Monday to Friday 7am to 6pm. Both lanes will reopen with speed of 80km outside these times. Expected concluding 30 April 2014. Short delays expected. Last edited: 16 Mar 2014 14:47
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, COOCHIN CREEK, 4519 - Planned Roadworks Both Directions Coochin Road between Bells Creek Road and Roys Road. Commencing: 11 March, at 1:13pm Concluding:30 April, at 12:00am Short delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) would like to inform you of upcoming works on Coochin Road at Coochin Creek, as part of the new interchange upgrade on the Bruce Highway at the Roys Road and Bells Creek Road intersections. The works involve resurfacing Coochin Road between Bells Creek Road and Roys Road. Coochin Road will be temporarily closed to vehicles, with signage in place to advise motorists of alternate routes. Residential access via Bells Creek Road and Roys Road will be maintained during these works. Works are scheduled to start in mid-March 2014 and will take approximately four weeks to complete, weather and construction conditions permitting. Works will be carried out Monday to Saturday between 6.30am and 5pm. Roadwork signage and traffic control will be in place to safeguard motorists and road workers. Nearby residents and businesses may experience some minor noise during the work hours. TMR apologises for any inconvenience this work may cause and thanks residents, businesses and road users for their patience. Further information about the interchange upgrade, including a layout, is available on TMR’s website at www.tmr.qld.gov.au by searching ‘Bruce Highway interchange at Roys Road and Bells Creek Road’. If you require further information, please call the North Coast office in Maroochydore on 5451 7055 or email northcoast@tmr.qld.gov.au. Last edited: 11 Mar 2014 13:31
Last report received from DTMR: 2014-04-21T07:50:21
STEVE IRWIN WAY, ELIMBAH, 4516 - Planned Roadworks Both Directions Shoulder widening Steve Irwin Way at Male Road Elimbah. Commencing: 06 March, at 6:30am Concluding:04 July, at 4:30pm No delays expected. Proceed with caution. Shoulder widening and resurfacing of Steve Irwin Way between the two Male Road exits at Elimbah 6.30am to 4.30pm from 6 March to 4 July Last edited: 05 Mar 2014 10:30
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, BEERBURRUM, 4517 - Planned Roadworks Northbound Intersection Steve Irwin Way and Bruce Highway northbound exit lane. Commencing: 03 March, at 6:00am Concluding:30 June, at 6:00pm Short delays expected. Proceed with caution. The Department of Transport and Main Roads would like to advise that work to improve safety at the intersection of Steve Irwin Way and the Bruce Highway northbound exit lane at Beerburrum is scheduled to begin in Monday, 3 March 2014 and be completed by late June 2014, weather permitting. The works will realign the current Y-shaped intersection and construct an acceleration lane/merge lane. The new intersection will improve safety by providing drivers accessing Steve Irwin Way with a longer merge length and improved visibility. Works will generally be carried out during the day between 6am and 6pm, Monday to Friday. For the safety of road workers and motorists, changed traffic conditions including lane closures, traffic control devices and speed reductions will be in place. TMR has engaged RoadTek Asset Services to carry out the works. For more information I encourage you to contact Mr Martin Leja, Senior Engineer (Civil) on 5451 7055 or by email at northcoast@tmr.qld.gov.au. Mr Leja will be pleased to assist. Last edited: 27 Feb 2014 17:10
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, COOROY, 4563 - Planned Roadworks Both Directions Tree Grooming starting at Cooroy heading south over a four month period.. Commencing: 21 February, at 11:21am Concluding:30 June, at 12:00am Short delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) would like to advise that vegetation maintenance and clearing works are due to commence on Sunday 23 February 2014 on the Bruce Highway between the Pine Rivers Bridge and Cooroy. This work will take about four months to complete, weather permitting. Vegetation and regrowth will be removed on the centre median and on each side of the Bruce Highway to improve driver visibility and remove hazards and rubbish. Vegetation will also be cleared at interchanges to further improve sight lines and driver safety. The project is part of the Safer Roads Sooner program, supporting the Queensland Government’s commitment to improving road safety. To reduce daytime traffic impacts on the Bruce Highway all work will be carried out at night, generally between 7pm and 5am, Sunday to Friday. Changed traffic conditions will involve traffic control devices, single lane closures and speed reductions. For up-to-date information on traffic disruptions please visit www.131940.qld.gov.au or call 13 19 40. If you have any questions about this work, please contact Mr Alistair Culley, Senior Engineer, on 5451 7055 or at northcoast@tmr.qld.gov.au. Last edited: 24 Feb 2014 13:49
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, BLACK MOUNTAIN, 4563 - Planned Roadworks All directions Commencing: 18 February, at 12:34pm Concluding:31 July, at 12:00am Short delays expected. Proceed with caution. Planned roadworks on Bruce Highway at Black Mountain Roadworks underway as part of Bruce Highway Upgrade (Cooroy to Curra), Section A. Reduced speed limits, single lane closures and changed traffic conditions in place throughout the construction period. 18 Feb 14 to 31 Jul 16. Last edited: 21 Feb 2014 07:19
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, PALMVIEW, 4553 - Planned Roadworks Southbound Works on Bruce Highway including Frizzo Road, between Martin Road and the Bruce Highway on ramp. Commencing: 22 January, at 3:32pm Concluding:31 March, at 11:59pm Short delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) advises that it will be undertaking further works on the Bruce Highway including Frizzo Road, between Martin Road and the Bruce Highway on ramp, from January to March as part of the $15 million federally funded Bruce Highway Safety package at Palmview. Reconstruction of the existing Frizzo Road pavement and works on the new Frizzo Road/Western Service Road intersection will begin on 28 January 2014 and are expected to take up to ten weeks to complete, weather permitting. Works will be carried out Monday to Saturday, between 7am and 5pm. Works on Sunday, March 2 and Monday, March 3, weather permitting will involve the Highway reduced to a single lane with speed reduced to 80km/hr between the hours of 7pm to 5am. Works will include installing a 650mtr barrier along the left shoulder, linemarking and surveying. These works will be carried out in a number of stages requiring changes to traffic movements. Traffic south of the existing Martin Road/Frizzo Road intersection will be restricted to a single lane under traffic control with intermittent delays of up to five minutes. Traffic controllers, reduced speed limits and signage will again be in place. Residents will be given advance notice of any major traffic changes. The Bruce Highway Safety Improvement project will provide an important safety measure that will remove the risks associated with motorists turning on and off the highway at the Sippy Creek Road intersection. For further information contact Mr Kamran Jami, Senior Civil Engineer 5475 2828. Last edited: 15 Feb 2014 16:02
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, FOREST GLEN, 4556 - Planned Roadworks Both Directions Bruce Highway from the Caloundra Road interchange to the Maroochydore Road interchange. Commencing: 15 January, at 4:01pm Concluding:30 June, at 12:00am Unknown traffic impact. Reduced speed limit (40km/h). The Department of Transport and Main Roads (TMR) would like to advise that guardrail improvement works at various locations on the Bruce Highway from the Caloundra Road interchange to the Maroochydore Road interchange have begun and are due for completion by June 2014, weather permitting. This work is part of the state government’s Safer Roads Sooner (SRS) program and involves the proactive replacement of guardrail barrier ends to improve the safety function of the guardrail at higher-risk locations. Works will be carried out in two sections from the Sunshine Motorway (Buderim-Mooloolaba exit) north to the Maroochydore Road interchange, and from the Sunshine Motorway south to the Caloundra Road interchange. Works north of the Sunshine Motorway will generally be carried out during the day between 9am and 3pm, Monday to Friday. Works south of the Sunshine Motorway will generally be carried out at night between 6pm and 6am, Sunday to Thursday. For the safety of roadworkers and motorists, changed traffic conditions including lane closures, traffic control devices and speed reductions will be in place. Last edited: 15 Jan 2014 16:04
Last report received from DTMR: 2014-04-21T07:50:21
MOOLOOLABA ROAD, BUDERIM, 4556 - Planned Roadworks All directions Roadworks on Mooloolaba road between Foote Avenue and Buderim Pines Drive. Lane closures and reduced speed limits may apply. Motorists may experience some minor delays. Work is expected to be complete by late 2014. Commencing: 24 December, at 6:01pm Concluding:31 December, at 12:00am Short delays expected. Proceed with caution. Last edited: 21 Feb 2014 07:20
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, ELIMBAH, 4516 - Planned Roadworks Both Directions Upgrade works Bruce Highway interchange with Pumicestone Road, Elimbah. Reduced speed limit of 80km/h is in place in roadworks area. Motorists may experience some minor delays. Work expected to be complete by late 2014. . Commencing: 24 December, at 8:00am Concluding:31 December, at 12:00am Short delays expected. Reduced speed limit (80km/h). On Wednesday 14 April, the bridge deck over the southbound lanes of the highway will be constructed. Both southbound lanes and the northbound overtaking lane (nearest the median) will be closed during works. Southbound traffic will be diverted around the project site via the current on and off-ramps (Exit 157 southbound). Last edited: 16 Apr 2014 19:10
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, BELLS CREEK, 4551 - Planned Roadworks Both Directions Construction of a new interchange on the Bruce Highway at Roys Road and Bells Creek Road, Beerwah. Reduced speed limit of 80km/h is in place in the roadworks area. Motorists may experience some minor delays. Work is expected to be complete by mid-2015. . Commencing: 24 December, at 8:00am Concluding:30 June, at 12:00am Short delays expected. Reduced speed limit (80km/h). Last edited: 21 Feb 2014 07:17
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, COOROY, 4563 - Planned Roadworks All directions . Commencing: 24 December, at 12:00am Concluding:28 February, at 12:00am Short delays expected. Proceed with caution. Bruce Highway, Cooroy to Federal On-going roadworks between Cooroy southern interchange in Cooroy and Sankeys Road in Federal for the Bruce Highway Upgrade (Cooroy to Curra), Section A project. Temporary closures of the Bruce Highway between Black Mountain Range Road and just south of Gardners Road for blasting from 24 March 2014 until late 2014, weather permitting. Sections of Gardners Road, Uhlmanns Road and Pomona Connection Road may also be temporarily closed. Motorists may experience delays of up to five minutes during the blasts. Please follow the instructions of traffic controllers, police and road signs. During the period February 2014 to February 2017, all vehicles wider than 4m will need to stop opposing traffic. An alternative route is available via the Eumundi exit of the Bruce Highway in the south and Pomona Connection Road in the north. Cooroy can then be reached via the old highway (Eumundi Range Road/Nandroya Road/Myall Street) and Pomona can be reached via Elm Street and Yurol Forest Drive. More details are available on the department’s Conditions of Operation database at www.tmr.qld.gov.au. Proceed with caution. Last edited: 18 Mar 2014 18:08
Last report received from DTMR: 2014-04-21T07:50:21
MOUNT MEE ROAD, MOUNT MEE, 4521 - Planned Roadworks Both Directions Commencing: 22 December 10:00am Concluding:Unknown completion date Short delays expected. Traffic control on scene. Mount Mee Road, Mount Mee - The Department of Transport and Main Roads (TMR) is undertaking reconstruction works on Mount Mee Road to repair significant damage sustained during heavy rain in early 2013. The reconstruction work includes slope stabilisation, pavement repairs and drainage works. Works will generally be carried out between 7am and 6pm, Monday to Friday. Reconstruction works are required at two sites: ·approximately 5km north of Dayboro near Ocean View Road ·1.5km south of Mount Mee near Duncan Road. One lane will be closed under traffic control at each work site and some delays are expected. Motorists are reminded to drive to the changed conditions and obey all signage for their own safety and the safety of roadworkers. For up-to-date information on traffic conditions please visit www.131940.qld.gov.au or call 13 19 40. The project is expected to be completed by the end of September 2014, weather permitting. We appreciate the ongoing patience of the community and motorists while this important project is underway. If you would like further information about the project, please contact the project team on 1800 459 366 or via email on norc_reconstruct@tmr.qld.gov.au. Last edited: 16 Mar 2014 15:35
Last report received from DTMR: 2014-04-21T07:50:21
KENILWORTH BROOLOO ROAD, KENILWORTH, 4574 - Planned Roadworks All directions Due to significant damage. Kenilworth-Brooloo road will be closed to through traffic north of Bluff road. Traffic will be diverted via Eumundi-Kenilworth road, Skyring Creek road and Tuchekoi Road. Detour routes will be clearly signed. . Commencing: 28 February, at 9:39am Concluding:to be advised. Short delays expected. Observe signage. From Monday 3 March Kenilworth-Brooloo road will be closed to all traffic north of Bluff road. Diversions will be well signed. Weather permitting, works will be completed at the end of July. Last edited: 02 Mar 2014 14:18
Last report received from DTMR: 2014-04-21T07:50:21
Darling Downs
Road Closures/Load Limits
SURAT DEVELOPMENTAL ROAD, MEANDARRA, 4422 - 15kms East of Meandarra at Finbar Open (with caution) Proceed with caution. Last edited: 09 Apr 2014 13:52
Last report received from DTMR: 2014-04-21T07:50:21
Special
MURILLA STREET, MILES, 4415 - Special Event All directions Between Dawson and Tully Streets Detours in place. Speed is reduced to 40km. Commencing: 25 April 2014 at 10.00am Concluding: 25 April 2014 at 12.30pm Long delays expected. Changed traffic conditions. Anzac Day Last edited: 17 Apr 2014 16:20
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
RUSSELL STREET, TOOWOOMBA CITY, 4350 - Planned Roadworks All directions Intersection Russell and Victoria Streets. Commencing: 07 April 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: Mid September 2014, weather permitting. No delays expected. Changed traffic conditions. RUSSELL STREET CLOSED TO EAST BOUND TRAFFIC, AT THE INTERSECTION WITH VICTORIA STREET. USE ALTERNATE ROUTE Pedestrian access will be maintained and Businesses in the area will remain open and accessible Last edited: 04 Apr 2014 11:00
Last report received from DTMR: 2014-04-21T07:50:21
FRY STREET, TARA, 4421 - Planned Roadworks All directions In Tara Township (Surat Developmental Road). Commencing: 30 March, 2014 at 6.00am Concluding: 17 May, 2014 at 6.00pm Short delays expected. Reduced speed limit (60km/h). Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 02 Apr 2014 12:29
Last report received from DTMR: 2014-04-21T07:50:21
TOOWOOMBA CECIL PLAINS ROAD, BIDDESTON, 4401 - Planned Roadworks Both Directions Approximately between, Brimblecombe Road, Wellcamp to F Drew Road, Aubigny. Commencing: 31 March 2014, 24 hours a day, Monday to Saturday. Concluding: 30 April 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Traffic control with possible delays of up to 5 minutes. Please proceed with caution. On Site During NON working hours: Reduced Speed Limit 80km/h. Last edited: 24 Mar 2014 07:23
Last report received from DTMR: 2014-04-21T07:50:21
GOGGS STREET, TOOWOOMBA CITY, 4350 - Planned Roadworks All directions Intersection Prescott Street and Goggs Street. Goggs Street (between Kenric Street & Clifford Street) West Creek Channel (between Herries Street & James Street) . Commencing: 10 February 2014, between the hours of 6:30am and 6:30pm, Monday to Saturday. Concluding: September 2014. Unknown traffic impact. Changed traffic conditions. Goggs Street, TOOWOOMBA CITY: Tointon Street intersection to Kenric Street will be CLOSED from Monday 24 March 2014 for two weeks for stormwater drainage upgrade works. Detour via Langton Street. Access available to local businesses. Consider alternative routes if traveling through the area. Pay attention to signs and allow extra travel time when planning your trip. Changes include: * Short-term traffic arrangements will be in place along Goggs Street, between Kenric and Clifford streets. * Temporary road closures will occur between Clifford and Prescott streets, including the intersections. * Driveway and pedestrian access to businesses and residences will be maintained. * Footpath closures near the active work area and alternative routes will be signed. * Alternative traffic routes and redirections will be signed. Please drive to the conditions at all times. Last edited: 25 Mar 2014 10:58
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, OAKEY, 4401 - Planned Roadworks All directions At the intersection of Oakey Biddeston Road. Commencing: 3rd March 2014 at 07.30am Concluding: 25th May 2014 at 02.30pm Short delays expected. Reduced speed limit (40km/h). On Site during working hours (7.30am-2.30pm): Reduced speed to 40km/hour with possible shoulders closures. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 03 Apr 2014 08:16
Last report received from DTMR: 2014-04-21T07:50:21
LEICHHARDT HIGHWAY, MOONIE, 4406 - Planned Roadworks All directions Moving work sites between Moonie and Goondiwindi. There will be 7 work sites in total with only 1 operating at a time. Site will be no more than 1km in length. Commencing: 10th March, 2014 at 06.00am Concluding: 17th June, 2014 at 06.00pm Medium delays expected. Changed traffic conditions. On Site during working hours 06.00am - 06.00pm Monday to Saturday: Single lane in operation, reduced speed Limit 40km/h, portable Traffic Signals with possible delays of up to 5 minutes. On Site During NON working hours 06.00pm - 06.00am & Sunday: Single lane in operation, reduced speed Limit 60km/h, portable Traffic Signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 03 Mar 2014 08:01
Last report received from DTMR: 2014-04-21T07:50:21
NEW ENGLAND HIGHWAY, DALVEEN, 4374 - Planned Roadworks Both Directions Near the intersection of Coochie Road Braeside. Commencing: 22nd January 2014, between the hours of 6:00am and 6:00pm, Monday to Friday Concluding: 21st April 2014, weather permitting Medium delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, reduced speed Limit 40km/h, portable Traffic Signals with possible delays of up to 15 minutes. On Site During NON working hours: Single lane in operation, reduced speed Limit 60km/h, portable Traffic Signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 31 Mar 2014 07:00
Last report received from DTMR: 2014-04-21T07:50:21
ESK HAMPTON ROAD, RAVENSBOURNE, 4352 - Planned Roadworks All directions Between National Park Road and Shearer Road. Commencing: 09 January, at 6:00am Concluding: 08 April 2014, at 06:00pm (To Be Confirmed) Short delays expected. Reduced speed limit (40km/h). On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Proceed with caution. On Site During NON working hours and Overnight (6pm-6am): Reduced Speed Limit 60km/h, Proceed with caution. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 19 Dec 2013 12:39
Last report received from DTMR: 2014-04-21T07:50:21
OAKEY PITTSWORTH ROAD, MOTLEY, 4356 - Planned Roadworks All directions Between Motley Mount Tyson Road and Mondam Mount Tyson Road. Commencing: 25 November 2013, between the hours of 6:00am and 06:00pm Monday - Saturday, Concluding:April 2014, weather permitting Medium delays expected. Changed traffic conditions. On Site during working hours (6am-6pm): Reduced Speed Limit 40km/h, Portable Traffic Signals on site with possible delays of up to 15 minutes. On Site During NON working hours: Reduced Speed Limit 60km/h. Portable Traffic Signals on site with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 14 Apr 2014 12:55
Last report received from DTMR: 2014-04-21T07:50:21
WARREGO HIGHWAY, REDWOOD, 4350 - Planned Roadworks Both Directions Toowoomba Range. Commencing: 15 April 2013, 24 hours, 6 days per week Concluding:15 May 2014, weather permitting Short delays expected. Changed traffic conditions. Works being carried out 24 hours, 6 days per week. On Site during daylight hours 6:00am to 6:00pm: WEST BOUND - All lanes in Operation with Reduced Speed Limit 40km/h, possible delays of up to 15 minutes. EAST BOUND - All lanes in Operation with Reduced Speed limit 40km/h, possible delays of up to 15 minutes. On Site, Overnight, 06.00PM to 06.00AM WEST BOUND - Possible Single Lane in Operation with Reduced Speed Limit 40km/h, possible intermittent stoppages with delays of up to 15 minutes. EAST BOUND - Possible Single Lane in Operation with Reduced Speed limit 40km/h, possible intermittent stoppages with delays of up to 15 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au 1st SAFETY RAMP IS CLOSED Motorists are advised to show patience and to please give trucks more space. Last edited: 12 Feb 2014 12:34
Last report received from DTMR: 2014-04-21T07:50:21
Incidents
LEICHHARDT HIGHWAY, MOONIE, 4406 - Potholes or road surface damage Hazard All directions Approximately 40 kilometers South of Moonie. No delays expected. Reduced speed limit (60km/h). Motorists are advised to use caution when traveling through this area and adhere to any speed reduction changes. Last edited: 02 Apr 2014 07:54
Last report received from DTMR: 2014-04-21T07:50:21
TARA KOGAN ROAD, TARA, 4421 - Potholes or road surface damage Hazard Both Directions Narrow soft Shoulders, speed restrictions the length of the road. No delays expected. Proceed with caution. Last edited: 02 Apr 2014 07:28
Last report received from DTMR: 2014-04-21T07:50:21
South West
Road Closures/Load Limits
CONDAMINE HIGHWAY, WARKON, 4417 - Snake Creek, approximately 17.5 kilometres east of intersection with Carnarvon Highway Open (with caution) Proceed with caution. Single lane in operation under portable signals. Last edited: 10 Apr 2014 14:36
Last report received from DTMR: 2014-04-21T07:50:21
NORTON ROAD, MUNGINDI, 2406 - The Border - Carnarvon Highway Connection Road Subject to a 5 tonne GVM limit Proceed with caution. Last edited: 09 Apr 2014 12:46
Last report received from DTMR: 2014-04-21T07:50:21
CONDAMINE HIGHWAY, WARKON, 4417 - At Yuleba Creek (Roma Condamine Road) Open (with caution) Proceed with caution. Last edited: 08 Apr 2014 11:08
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
WALLUMBILLA SOUTH ROAD, WALLUMBILLA SOUTH, 4428 - Planned Roadworks Both Directions Works are between approximately 6.7km to 8.70km south of Wallumbilla. Commencing: 04 April 2014, between the hours of 6:00am to 6:00pm, Monday to Saturday. Concluding: 09 May 2014, weather permitting, Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, reduced speed Limit 40km/h, Traffic Control with possible delays of up to 5 minutes. On Site During NON working hours: Speed Limit 40km/h. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 13 Mar 2014 07:16
Last report received from DTMR: 2014-04-21T07:50:21
MITCHELL HIGHWAY, CUNNAMULLA, 4490 - Planned Roadworks Both Directions Progressing work site over an approximate 111 kilometre stretch between Cunnamulla and Charleville. Commencing: 14 January 2014, between the hours of 6:00am and 6:00pm, 7 days a week, Concluding:06 June 2014, weather permitting No delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Traffic Control with possible delays of 15 minutes. On Site during NON working hours: Reduced Speed Limit 60km/h. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 13 Mar 2014 07:28
Last report received from DTMR: 2014-04-21T07:50:21
ADVENTURE WAY, CUNNAMULLA, 4490 - Planned Roadworks Both Directions BULLOO DEVELOPMENTAL ROAD Progressing work site over an approximate 110 kilometre stretch between Cunnamulla and Thargomindah. . Commencing: 29 November 2013, between the hours of 6:00am and 6:00pm, 7 days a week, Concluding:21 May 2014, weather permitting Medium delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Traffic Control with possible delays of up to 15. On Site During NON working hours and Overnight: Reduced Speed Limit 60km/h. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 13 Mar 2014 07:27
Last report received from DTMR: 2014-04-21T07:50:21
MITCHELL HIGHWAY, CHARLEVILLE, 4470 - Planned Roadworks Both Directions Progressing work site over an approximate 78.5 kilometre stretch, between Charleville and Augathella. Commencing: 06 December 2013, between the hours of 6:00am and 6:00pm, 7 days a week, Concluding:30 April 2014, weather permitting Short delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 5 minutes. On Site During NON working hours: Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 13 Mar 2014 07:30
Last report received from DTMR: 2014-04-21T07:50:21
RAGLAN STREET, ROMA, 4455 - Planned Roadworks Both Directions Between Currey Street and Cattle Creek . Commencing: August 2013, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 16 May 2014, weather permitting Long delays expected. Changed traffic conditions. On Site during working hours: Single lane sidetrack in operation, reduced speed limit (40km/h), Traffic Control with possible delays of up to 30 minutes, please allow extra travel time. On Site During NON working hours: Single lane sidetrack in operation, reduced speed limit (60km/h), portable traffic signals with possible delays of up to 30 minutes, please allow extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 14 Apr 2014 09:02
Last report received from DTMR: 2014-04-21T07:50:21
Incidents
CARNARVON HIGHWAY, BAFFLE WEST, 4454 - Potholes or road surface damage Hazard All directions Between Baffle Creek and the Dawson River, over a 20km long section. Or approximately 20km North of Injune to 10km South of Rolleston. No delays expected. Proceed with caution. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 07 Apr 2014 12:45
Last report received from DTMR: 2014-04-21T07:50:21
Central West
Road Closures/Load Limits
BLACKALL JERICHO ROAD, BLACKALL, 4472 - Restricted to four wheel drive vehicles only Proceed with caution. Last edited: 03 Apr 2014 10:36
Last report received from DTMR: 2014-04-21T07:50:21
DAWSON DEVELOPMENTAL ROAD, TAMBO, 4478 - Springsure - Tambo Restricted to four wheel drive vehicles only Last edited: 31 Mar 2014 11:11
Last report received from DTMR: 2014-04-21T07:50:21
RICHMOND WINTON ROAD, KYNUNA, 4823 - Restricted to high clearance vehicles only Winton Shire only Last edited: 31 Mar 2014 11:11
Last report received from DTMR: 2014-04-21T07:50:21
WINTON JUNDAH ROAD, JUNDAH, 4736 - Restricted to four wheel drive vehicles only Proceed with caution. Last edited: 31 Mar 2014 11:09
Last report received from DTMR: 2014-04-21T07:50:21
ISISFORD BLACKALL ROAD, BLACKALL, 4472 - Restricted to four wheel drive vehicles only Last edited: 31 Mar 2014 11:09
Last report received from DTMR: 2014-04-21T07:50:21
CROSSMOOR ROAD, SARDINE, 4726 - Open (with caution) Proceed with caution. Last edited: 31 Mar 2014 11:09
Last report received from DTMR: 2014-04-21T07:50:21
ILFRACOMBE ARAMAC ROAD, ARAMAC, 4726 - Restricted to four wheel drive vehicles only Last edited: 31 Mar 2014 11:08
Last report received from DTMR: 2014-04-21T07:50:21
DONOHUE HIGHWAY, TOKO, 4829 - Boulia - Alice Springs Restricted to four wheel drive vehicles only Proceed with caution. Last edited: 31 Mar 2014 10:37
Last report received from DTMR: 2014-04-21T07:50:21
BLACKALL ADAVALE ROAD, BLACKALL, 4472 - Restricted to four wheel drive vehicles only Observe signage. High CLearance Vehicles ONLY. 4 TONNE LIMIT Last edited: 31 Mar 2014 10:25
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
CLERMONT ALPHA ROAD, ALPHA, 4724 - Planned Roadworks Both Directions Commencing: 25 March, at 12:24pm Concluding:May 2014, weather permitting Short delays expected. Works involve desilting and shoulder repair. Traffic to operate under stop and go arrangement, and a minor side track. Some traffic delays are expected in roadworks zones. Motorists are advised to allow additional travel time. Last edited: 25 Mar 2014 12:25
Last report received from DTMR: 2014-04-21T07:50:21
BLACKALL JERICHO ROAD, BLACKALL, 4472 - Planned Roadworks Both Directions Commencing: 25 March, at 12:02pm Concluding:April 2014, weather permitting No delays expected. Use alternative route. Works involve gravel resheeting, drainage and culvert repairs. Traffic to operate under stop and go arrangement, and a minor side track. Some traffic delays are expected in roadworks zones. Motorists are advised to allow additional travel time. Last edited: 25 Mar 2014 12:03
Last report received from DTMR: 2014-04-21T07:50:21
MUTTABURRA ARAMAC ROAD, MUTTABURRA, 4732 - Planned Roadworks Both Directions Commencing: 25 March, at 12:00pm Concluding:August 2014 Short delays expected. Works involve shoulder repairs, drainage desilting and pavement patching. Last edited: 25 Mar 2014 12:00
Last report received from DTMR: 2014-04-21T07:50:21
BARCALDINE ARAMAC ROAD, BARCALDINE, 4725 - Planned Roadworks Both Directions Commencing: 25 March, at 11:43am Concluding:August 2014 Short delays expected. Works involve shoulder repairs, drainage desilting and pavement patching. Last edited: 25 Mar 2014 11:43
Last report received from DTMR: 2014-04-21T07:50:21
ISISFORD EMMET ROAD, ISISFORD, 4731 - Planned Roadworks Both Directions Commencing: 25 March, at 10:33am Concluding:mid-2014, weather permitting Short delays expected. Observe signage. Works involve drainage silt removal, wire basket protection (batter erosion control), stabilise patching and floodway repair. Traffic to operate under a stop and go arrangement, with some traffic delays are expected in roadworks zones. Motorists are advised to allow additional travel time. Last edited: 25 Mar 2014 10:40
Last report received from DTMR: 2014-04-21T07:50:21
ISISFORD BLACKALL ROAD, ISISFORD, 4731 - Planned Roadworks Both Directions Commencing: 25 March, at 10:30am Concluding:mid-2014, weather permitting Short delays expected. Works involve stabilise patching. Traffic will be diverted to a minor side track during works. Some traffic delays are expected in roadworks zones. Motorists are advised to allow additional travel time. Last edited: 25 Mar 2014 10:30
Last report received from DTMR: 2014-04-21T07:50:21
ISISFORD ILFRACOMBE ROAD, ISISFORD, 4731 - Planned Roadworks Both Directions Commencing: 25 March, at 10:27am Concluding:mid-2014, weather permitting Short delays expected. Works involve stabilise patching. Traffic will be diverted to a minor side track during works. Some traffic delays are expected in roadworks zones. Motorists are advised to allow additional travel time. Last edited: 25 Mar 2014 10:27
Last report received from DTMR: 2014-04-21T07:50:21
RICHMOND WINTON ROAD, KYNUNA, 4823 - Planned Roadworks Both Directions Commencing: 25 March, at 10:24am Concluding:mid-2014, weather permitting Short delays expected. Observe signage. Works will involve formation resheeting and shoulder repairs. Last edited: 25 Mar 2014 10:25
Last report received from DTMR: 2014-04-21T07:50:21
LANDSBOROUGH HIGHWAY, TAMBO, 4478 - Planned Roadworks Both Directions Augathella to Tambo. Commencing: 25 March, at 10:20am Concluding:September 2014, weather permitting Short delays expected. Observe signage. Early works include stockpile preparation and gravel haulage. Works will include table drain clearing, stabilised pavement patching, sealing and line marking. Last edited: 25 Mar 2014 10:21
Last report received from DTMR: 2014-04-21T07:50:21
ILFRACOMBE ARAMAC ROAD, ILFRACOMBE, 4727 - Planned Roadworks Both Directions Commencing: 21 January, at 9:56am Concluding:Mid-2014, weather permitting Short delays expected. Proceed with caution. Works involve stabilise patching. Last edited: 25 Mar 2014 09:53
Last report received from DTMR: 2014-04-21T07:50:21
THOMSON DEVELOPMENTAL ROAD, LONGREACH, 4730 - Planned Roadworks Both Directions Jundah - Longreach. Commencing: 21 January, at 9:45am Concluding:Mid-2014, weather permitting. Short delays expected. Proceed with caution. Works involve stabilisation, pavement patching and drainage repairs. Minor traffic delays to be expected with stop and go; and minor side tracks where required. Last edited: 25 Mar 2014 09:54
Last report received from DTMR: 2014-04-21T07:50:21
JUNDAH QUILPIE ROAD, JUNDAH, 4736 - Planned Roadworks Both Directions Commencing: 21 January 9:41am Concluding:May 2014, weather permitting Short delays expected. Proceed with caution. Works involve gravel resheeting. Last edited: 25 Mar 2014 09:52
Last report received from DTMR: 2014-04-21T07:50:21
LANDSBOROUGH HIGHWAY, WINTON, 4735 - Planned Roadworks Both Directions (Winton - Kynuna). Commencing: November 2012 Concluding:Mid-2014, weather permitting Short delays expected. Observe signage. Works involve stabilise patching. Last edited: 25 Mar 2014 09:56
Last report received from DTMR: 2014-04-21T07:50:21
LANDSBOROUGH HIGHWAY, WINTON, 4735 - Planned Roadworks Both Directions Longreach-Winton. Commencing: 04 February, at 11:06am Concluding:Mid-2014, weather permitting Short delays expected. Observe signage. Works involve stabilising, patching and drainage repairs. Last edited: 25 Mar 2014 09:55
Last report received from DTMR: 2014-04-21T07:50:21
KENNEDY DEVELOPMENTAL ROAD, CORFIELD, 4733 - Planned Roadworks Both Directions Hughenden to Winton. Commencing: 05 November, at 1:44pm Concluding:June 2014 Short delays expected. Observe signage. Works will be underway from November 2012 to June 2014, weather permitting. Works involve stabilising, patching and drainage repairs. Last edited: 25 Mar 2014 10:05
Last report received from DTMR: 2014-04-21T07:50:21
Wide Bay-Burnett
Road Closures/Load Limits
KALPOWAR ROAD, GAETA, 4671 - Kolan River upper crossing Open (caution road subject to flash flooding) Proceed with caution. Last edited: 16 Apr 2014 08:49
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
GOODWOOD ROAD, NORTH ISIS, 4660 - Planned Roadworks Both Directions Various sections between Mahogany Creek Road and Elliott Siding Road. Commencing: Monday 5 May 2014 Concluding:late May, weather permitting Short delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 16 Apr 2014 08:50
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, BAUPLE, 4650 - Planned Roadworks Both Directions Between South of Tiaro and Bauple-Woolooga Road. Commencing: 10 April 2014 Concluding:Late April 2014, weather permitting Short delays expected. Reduced speed limit (40km/h). NIGHT WORKS: Motorists may encounter stop-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 10 Apr 2014 15:05
Last report received from DTMR: 2014-04-21T07:50:21
MARY VALLEY ROAD, IMBIL, 4570 - Planned Roadworks All directions Yabba Creek Road intersection. Commencing: 14 April 2014 Concluding:mid-2014, weather permitting Short delays expected. Allow extra travel time. While works are underway, we recommend motorists allow an additional 10-15 minutes travel time to each journey. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of roadworkers. Further information about the project is available by calling 1300 728 390. Last edited: 09 Apr 2014 09:27
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, CHILDERS, 4660 - Planned Roadworks Both Directions At the Lucketts Road, Goodwood Road and Butchers Road intersections. Commencing: Monday 10 February 2014 Concluding:late 2014, weather permitting Short delays expected. Allow extra travel time. Motorists may encounter traffic controllers, single-lane closures and speed restrictions while works are underway. Works will generally be carried out between 6am and 6pm, Monday to Saturday, weather permitting. For further information about these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 729 390 during business hours. Last edited: 09 Apr 2014 09:03
Last report received from DTMR: 2014-04-21T07:50:21
DRAYTON STREET, NANANGO, 4615 - Planned Roadworks Both Directions At the Henry Street intersection. Commencing: 08 April, at 12:18pm Concluding:mid-2014, weather permitting Short delays expected. Proceed with caution. While works are underway, traffic controllers, temporary closures and speed restrictions will be in place as required. Works are anticipated to be carried out between 6am and 6pm, Monday to Friday with some work on Saturdays and at night where necessary. Motorists should drive to the changed conditions and obey all signage for their own safety and the safety of roadworkers. If you require further information about the project, please call 1300 728 390 during business hours or email bundaberg.office@tmr.qld.gov.au. Last edited: 08 Apr 2014 12:18
Last report received from DTMR: 2014-04-21T07:50:21
GOODWOOD ROAD, ALLOWAY, 4670 - Planned Roadworks Both Directions Between Coonarr Road and Elliott Siding Road. Commencing: Tuesday 8 April Concluding:Wednesday 9 April, weather permitting Short delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 31 Mar 2014 16:28
Last report received from DTMR: 2014-04-21T07:50:21
ISIS HIGHWAY, BIGGENDEN, 4621 - Planned Roadworks Both Directions West of Biggenden, between Lords Road and Happy Valley Road. Commencing: Monday 7 April 2014 at 6:00am Concluding:Saturday 24 May 2014 at 6:00pm, weather permitting Short delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 04 Apr 2014 07:31
Last report received from DTMR: 2014-04-21T07:50:21
BARGARA ROAD, QUNABA, 4670 - Planned Roadworks Both Directions Two locations between Carl Rehbein Road and Potters Road. Commencing: Wednesday 2 April Concluding:Thursday 3 April, weather permitting Short delays expected. Reduced speed limit (40km/h). These works have been programmed to take place between 9am and 3pm to avoid peak times and minimise disruptions for motorists as much as possible. During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 31 Mar 2014 16:25
Last report received from DTMR: 2014-04-21T07:50:21
ISIS HIGHWAY, BAN BAN SPRINGS, 4625 - Planned Roadworks Both Directions Between Fletchers Road and Hinds Road. Commencing: Tuesday 1 April Concluding:Wednesday 16 April, weather permitting Short delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 01 Apr 2014 17:43
Last report received from DTMR: 2014-04-21T07:50:21
MUNDUBBERA DURONG ROAD, BOONDOOMA, 4613 - Planned Roadworks Both Directions North of Manar Road. Commencing: mid-March Concluding:late 2014, weather permitting Short delays expected. Changed traffic conditions. Last edited: 18 Mar 2014 08:39
Last report received from DTMR: 2014-04-21T07:50:21
CEDARS ROAD, SOUTH BINGERA, 4670 - Planned Roadworks Both Directions Between Bingera Pine Creek Road and just north of the Burnett River. Commencing: Tuesday 11 March Concluding:Wednesday 30 April, weather permitting Short delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 10 Mar 2014 16:18
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, CURRA, 4570 - Planned Roadworks Both Directions Various locations between Curra and Glenwood. Commencing: February 2014 Concluding:April 2014, weather permitting Short delays expected. Changed traffic conditions. Routine maintenance works will be progressively undertaken on various sections of the Bruce Highway between Curra and Glenwood. Motorists are advised to expect changed conditions, including reduced speed limits and loose stones, and should observe all safety signage and traffic controllers' instructions. Last edited: 18 Feb 2014 14:33
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, GLENWOOD, 4570 - Planned Roadworks Both Directions Various locations between Glenwood and Cherwell. Commencing: February 2014 Concluding:April 2014, weather permitting Short delays expected. Changed traffic conditions. Routine maintenance works will be progressively undertaken on various sections of the Bruce Highway between Glenwood and Cherwell. Motorists are advised to expect changed conditions, including reduced speed limits and loose stones, and should observe all safety signage and traffic controllers' instructions. Last edited: 18 Feb 2014 14:33
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, APPLE TREE CREEK, 4660 - Planned Roadworks Both Directions Various locations between Childers and just south of Kolan River. Commencing: February 2014 Concluding:April 2014 Short delays expected. Observe signage. Routine maintenance works will be progressively undertaken on various sections of the Bruce Highway between Childers and the Kolan River. Motorists are advised to expect changed conditions, including reduced speed limits and loose stones, and should observe all safety signage and traffic controllers' instructions. Last edited: 18 Feb 2014 14:29
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, DRINAN, 4671 - Planned Roadworks Both Directions North of Comonju Road to north of Drinan Road. Commencing: 18 February 2014 Concluding:30 June 2014, weather permitting Short delays expected. Changed traffic conditions. Last edited: 18 Feb 2014 14:17
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, KOLONGA, 4671 - Planned Roadworks Both Directions Between John Clifford Way and Kalpowar Road. Commencing: Thursday 13 February Concluding:Friday 21 February, weather permitting Short delays expected. Reduced speed limit (40km/h). Road reconstruction works will be undertaken on the Bruce Highway between John Clifford Way and Kalpowar Road. During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 12 Feb 2014 12:48
Last report received from DTMR: 2014-04-21T07:50:21
BURNETT HIGHWAY, BAN BAN, 4625 - Planned Roadworks Both Directions Between the North Burnett / Gympie Regional Council border and Gayndah. Commencing: Tuesday 1 April 2014 Concluding:Saturday 31 May, weather permitting Short delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 05 Mar 2014 14:39
Last report received from DTMR: 2014-04-21T07:50:21
BURNETT HIGHWAY, EIDSVOLD, 4627 - Planned Roadworks Both Directions Between Gayndah and just north of Monto. Commencing: Tuesday 11 February Concluding:Saturday 31 May, weather permitting Short delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 07 Feb 2014 16:06
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, DUCKINWILLA, 4650 - Planned Roadworks Both Directions About 11km north of Maryborough. Commencing: 3 February 2014, weather permitting Concluding:mid-2014, weather permitting Medium delays expected. Allow extra travel time. Construction of a new northbound overtaking lane is underway at this location. Motorists may encounter traffic controllers, single-lane closures and speed restrictions while works are underway. Works will generally be carried out between 6am and 6pm, Monday to Saturday, weather permitting. Last edited: 05 Mar 2014 15:22
Last report received from DTMR: 2014-04-21T07:50:21
DAGUILAR HIGHWAY, BARKER CREEK FLAT, 4615 - Planned Roadworks Both Directions At the Parsons Road intersection. Commencing: 23 January, at 9:14am Concluding:mid-2014, weather permitting Short delays expected. Allow extra travel time. To carry out the works safely and efficiently, traffic controllers, single-lane closures and speed restrictions will be in place as required. Motorists are asked to be patient, drive to the changed conditions and obey all signage. For more information about these works, please phone 1300 728 390 during business hours, or email bundaberg.office@tmr.qld.gov.au. Last edited: 23 Jan 2014 09:15
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, TAKILBERAN, 4671 - Planned Roadworks Both Directions Near the Big Dipper - Back Creek Range. Commencing: late 2012 Concluding:April 2014, weather permitting No delays expected. Observe signage. Works are underway to realign a section of the Bruce Highway north of Gin Gin, including the section locally referred to as 'the Big Dipper'. Motorists are advised to expect changed conditions and observe all safety signage. For further information, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 08 Jan 2014 16:16
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, MONDURAN, 4671 - Planned Roadworks Between Cabbage Tree Creek and Carmans Road. Commencing: Concluding:late 2014, weather permitting Short delays expected. Changed traffic conditions. Works are underway to realign a section of the Bruce Highway about 10km north of Gin Gin. Motorists are advised to expect changed conditions and observe all safety signage. For further information, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 08 Jan 2014 16:16
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, WALLAVILLE, 4671 - Planned Roadworks Both Directions Various sites between Maryborough and Gin Gin. Commencing: now, Concluding:Early 2014, weather permitting Short delays expected. Allow extra travel time. Reconstruction works are underway at various sites along the highway between Maryborough and Gin Gin. Please observe all signage and obey all traffic controllers' instructions. Last edited: 08 Jan 2014 16:15
Last report received from DTMR: 2014-04-21T07:50:21
North West
Road Closures/Load Limits
GREGORY DOWNS CAMOOWEAL ROAD, CAMOOWEAL, 4828 - Restricted to four wheel drive vehicles only Proceed with caution. Last edited: 17 Apr 2014 08:18
Last report received from DTMR: 2014-04-21T07:50:21
BURKE DEVELOPMENTAL ROAD, HOWITT, 4890 - Walkers Creek to Carpentaria/Tableland Shire Boundary Closed to all vehicles Do not drive in flood waters. Last edited: 16 Apr 2014 14:13
Last report received from DTMR: 2014-04-21T07:50:21
KENNEDY DEVELOPMENTAL ROAD, HUGHENDEN, 4821 - Hughenden - Flinders/Etheridge Shire Boundary Open (with caution) Proceed with caution. Last edited: 14 Apr 2014 09:15
Last report received from DTMR: 2014-04-21T07:50:21
TORRENS CREEK ARAMAC ROAD, TORRENS CREEK, 4816 - Aramac - Torrens Creek Open (with caution) Proceed with caution. At Prairie Creek Last edited: 14 Apr 2014 09:14
Last report received from DTMR: 2014-04-21T07:50:21
HUGHENDEN MUTTABURRA ROAD, HUGHENDEN, 4821 - Hughenden - Flinders Shire Boundary Open (with caution) Proceed with caution. Last edited: 14 Apr 2014 09:14
Last report received from DTMR: 2014-04-21T07:50:21
Incidents
CLONCURRY DUCHESS ROAD, CLONCURRY, 4824 - Infrastructure damage Hazard Both Directions No delays expected. Proceed with caution. Road has been reopened Last edited: 30 Jan 2014 09:12
Last report received from DTMR: 2014-04-21T07:50:21
Far North
Road Closures/Load Limits
PENINSULA DEVELOPMENTAL ROAD, ARCHER RIVER, 4871 - Coen to Weipa Subject to a 5 tonne GVM limit Do not drive in flood waters. As at 6:00am Wednesday 16 April – The Archer River is approx 0.2 metres over the crossing and steady. Archer to Weipa drive with extreme caution when accessible Last edited: 17 Apr 2014 09:31
Last report received from DTMR: 2014-04-21T07:50:21
PENINSULA DEVELOPMENTAL ROAD, LAURA, 4871 - Laura to Coen Subject to a 5 tonne GVM limit Do not drive in flood waters. Laura Bridge open. Road very rough and slushy at Red Hill and North of Hann River Last edited: 17 Apr 2014 09:22
Last report received from DTMR: 2014-04-21T07:50:21
ENDEAVOUR VALLEY ROAD, COOKTOWN, 4895 - Open (with caution) Allow extra travel time. Minor delays can be expected while road repairs continue Last edited: 17 Apr 2014 09:12
Last report received from DTMR: 2014-04-21T07:50:21
SHIPTONS FLAT ROAD, ROSSVILLE, 4895 - Open (with caution) Allow extra travel time. Minor delays can be expected while road repairs continue. Last edited: 17 Apr 2014 09:11
Last report received from DTMR: 2014-04-21T07:50:21
BURKE DEVELOPMENTAL ROAD, WROTHAM, 4871 - Tablelands Regional Council Boundary (40 Kms east of Dunbar) to Mungana turnoff Subject to a 5 tonne GVM limit Do not drive in flood waters. As at 6:00am Thursday 17 April 2014, The road is impassable at the following locations: The Walsh River at Trimbles Crossing is 1.82 metres over the bridge. The Walsh River at Fergusons Crossing 0.08 metres over the bridge Last edited: 17 Apr 2014 09:06
Last report received from DTMR: 2014-04-21T07:50:21
HERBERTON PETFORD ROAD, IRVINEBANK, 4887 - From Irvinebank to Petford Restricted to high clearance vehicles only Proceed with caution. Due to washed out creeks and crossings Last edited: 17 Apr 2014 08:33
Last report received from DTMR: 2014-04-21T07:50:21
UPPER BARRON ROAD, MALANDA, 4885 - Sections reduced to 60 kilometers per hour Open (with caution) Reduced speed limit (60Km/h). Last edited: 17 Apr 2014 08:31
Last report received from DTMR: 2014-04-21T07:50:21
HERBERTON PETFORD ROAD, IRVINEBANK, 4887 - From Herberton to Irvinebank Open (with caution) Allow extra travel time. Last edited: 17 Apr 2014 07:30
Last report received from DTMR: 2014-04-21T07:50:21
MULLIGAN HIGHWAY, COOKTOWN, 4895 - Open (caution road subject to flash flooding) Do not drive in flood waters. Last edited: 16 Apr 2014 15:56
Last report received from DTMR: 2014-04-21T07:50:21
KENNEDY HIGHWAY, MACALISTER RANGE, 4871 - Kuranda Range Open (with caution) Last edited: 16 Apr 2014 14:08
Last report received from DTMR: 2014-04-21T07:50:21
FLORENCE STREET, PARRAMATTA PARK, 4870 - Subject to a 10 tonne GVM limit Use alternative route. Last edited: 16 Apr 2014 14:06
Last report received from DTMR: 2014-04-21T07:50:21
TULLY HULL ROAD, SILKY OAK, 4854 - Silky Oak Creek Bridge Open (with caution) Last edited: 15 Apr 2014 14:15
Last report received from DTMR: 2014-04-21T07:50:21
GREGORY DEVELOPMENTAL ROAD, EINASLEIGH, 4871 - from Einasleigh to Gulf Developmental Road Open (with caution) Do not drive in flood waters. Last edited: 15 Apr 2014 07:21
Last report received from DTMR: 2014-04-21T07:50:21
MULLIGAN HIGHWAY, MOUNT CARBINE, 4871 - Kelly St George Bridge Subject to a 42.5 tonne GVM limit Bridge/culvert damaged. . Conditions: 42.5 tonne Load Limit, Mulligan Highway - Kelly St George Creek bridge From Tuesday, 15 April 2014, the bridge over Kelly St. George Creek, 72 kilometres north of Mt Molloy on Mulligan Highway, will be closed to all vehicles in excess of 42.5 tonnes. No permits are required for semi trailers up to 42.5 tonne. TMR will consider applications for permits for standard configurations of B-doubles and Type 1 road trains for emergency usage. No consideration will be given to loadings for excess mass vehicles. The bridge will be restricted to a single traffic lane only with a maximum width of 4.0 metres, with no overtaking or passing permitted. A temporary speed limit of 60 km/h will also be in place. The changed traffic conditions will remain in place until structural remedial works are complete Last edited: 14 Apr 2014 16:57
Last report received from DTMR: 2014-04-21T07:50:21
GILLIES RANGE ROAD, LAMB RANGE, 4870 - Gordonvale to Boar Pocket Rd Open (with caution) Proceed with caution. Last edited: 14 Apr 2014 09:16
Last report received from DTMR: 2014-04-21T07:50:21
Special
LONGLANDS GAP ROAD, HERBERTON, 4887 - Special Event Roads affected may include, Herberton-Petford Rd, Longlands Gap Rd, Kennedy Highway and Tumoulin Rd. Commencing: 13 April 1:47am Concluding:to be advised Unknown traffic impact. Motorists are urged to show patience. Due to mine operations in Herberton, motorists can expect an increase in heavy vehicle movements between Herberton and Mt Garnet. Last edited: 13 Apr 2014 01:47
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
BRUCE HIGHWAY, WOREE, 4868 - Planned Roadworks All directions Cairns Bruce Highway Upgrade. Commencing: in progress Concluding:April 2014 Short delays expected. Changed traffic conditions. 1. Permanent Change – Links Drive – Friday 11 April 2014 - Links Drive connecting Kowinka Street and Walters Street will be open to traffic from Friday 11 April 2014. 2. Night works – Bruce Highway – Sunday 27 April to Thursday 1 May 2014 – between 7pm and 5am – Bruce Highway, between the interchange linking Mt Sheridan and White Rock and the northern overpass will be under traffic control under both directions from 7pm to 5am. At times, traffic may be diverted along the newly constructed service roads and speed reductions may be in place for the safety of workers. These works are required for permanent line marking. 3. Night works - Ray Jones Drive – Sunday 27 April to Thursday 1 May 2014 – between 7pm and 5am – Ray Jones Drive, between Rigg Street and Chinaman Creek will be under traffic control under both directions from 7pm to 5am. Speed reductions may be in place for the safety of workers. These works are required for permanent line marking. 4. Night works – Mulgrave Road – Sunday 13 April to Friday 25 April 2014 – between 7pm and 5am – Mulgrave Road from Gordon Creek bridge to Draper Street will be under traffic control in both directions intermittently from 7pm to 5am. At times the speed may be reduced to 40km/h for the safety of workers. These works are required for electrical installation. Last edited: 14 Apr 2014 16:56
Last report received from DTMR: 2014-04-21T07:50:21
KENNEDY HIGHWAY, MACALISTER RANGE, 4871 - Planned Roadworks Both Directions Various sections of the Kuranda Range for slope stabilisation. Commencing: in progress Concluding:May 2014 Short delays expected. Changed traffic conditions. The work will repair 16 sites above and below the range road between the bottom of the range and Koah Road Last edited: 12 Apr 2014 16:55
Last report received from DTMR: 2014-04-21T07:50:21
GILLIES RANGE ROAD, LAMB RANGE, 4870 - Planned Roadworks Eastbound Slope stabilisation works at various locations between Vico Street and Heales Lookout. Commencing: in progress Concluding:May 2014 Short delays expected. Changed traffic conditions. Last edited: 12 Apr 2014 16:58
Last report received from DTMR: 2014-04-21T07:50:21
BRINSMEAD KAMERUNGA ROAD, REDLYNCH, 4870 - Planned Roadworks Both Directions From Brinsmead Rd Roudabout to Cairns Western Arterial underpass. Commencing: 19 February 7:00am Concluding:late March Medium delays expected. Use alternative route. Last edited: 12 Apr 2014 16:39
Last report received from DTMR: 2014-04-21T07:50:21
GULF DEVELOPMENTAL ROAD, CROYDON, 4871 - Planned Roadworks All directions From Blackbull to Croydon township. Commencing: in progress Concluding:July 2014 Short delays expected. Changed traffic conditions. Last edited: 12 Apr 2014 16:39
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, MIDGENOO, 4854 - Planned Roadworks Both Directions Overtaking lanes between Broderick Road and Feluga Road. Commencing: 07 April 6:30am Concluding:August 2014 Short delays expected. Changed traffic conditions. Works will be carried out Monday to Saturday between 6.30 am and 5.30 pm until August 2014, weather permitting. For the safety of motorists and roadworkers, changed traffic conditions, traffic controllers and speed reductions will be implemented through the work site during working hours. Minor traffic delays expected Last edited: 12 Apr 2014 16:36
Last report received from DTMR: 2014-04-21T07:50:21
LOUISE STREET, ATHERTON, 4883 - Planned Roadworks Both Directions Commencing: in progress Concluding:April 2014 Short delays expected. Changed traffic conditions. Last edited: 12 Apr 2014 16:34
Last report received from DTMR: 2014-04-21T07:50:21
MULLIGAN HIGHWAY, DESAILLY, 4871 - Planned Roadworks Both Directions At Kelly St George Creek Bridge . Commencing: 14 April 6:00am Concluding:end December No delays expected. Changed traffic conditions. From Monday, 14 April 2014, the bridge over Kelly St. George Creek, 72 kilometres north of Mt Molloy on Mulligan Highway, will be closed to vehicles operating under excess mass permits. Standard configurations up to Type 1 Road Trains are permitted. The bridge will be restricted to a single traffic lane only with a maximum width of 4.0 metres, with no overtaking or passing permitted. A temporary speed limit of 60 km/h will also be in place. The changed traffic conditions will remain in place until structural remedial works are complete Last edited: 12 Apr 2014 16:35
Last report received from DTMR: 2014-04-21T07:50:21
MULGRAVE ROAD, PARRAMATTA PARK, 4870 - Planned Roadworks Both Directions Between Severin St and Buchan St heavy vehicles in excess of 10 tonnes and buses in excess of 15 tonnes will be required to detour around this section of road. Commencing: 07 April 6:00am Concluding:mid April Unknown traffic impact. Temporary load limits Mulgrave Road - Buchan Street to Severin Street From Monday 7 April 2014, heavy vehicles in excess of 10 tonnes and buses in excess of 15 tonnes will be required to detour around this section of road. The detour is necessary for the safety of workers carrying out structural works under Mulgrave Road. The load limit will be reviewed when the works are complete. Last edited: 04 Apr 2014 17:48
Last report received from DTMR: 2014-04-21T07:50:21
BRINSMEAD KAMERUNGA ROAD, KAMERUNGA, 4870 - Planned Roadworks Both Directions Nightworks near Barron River Bridge from 7pm to 7am. Commencing: 31 March 7:00pm Concluding:end April Short delays expected. Changed traffic conditions. Reconstruction work on a 700m section from the Barron River Bridge to approximately 150m north of Lake Placid Road Last edited: 31 Mar 2014 11:14
Last report received from DTMR: 2014-04-21T07:50:21
CAPTAIN COOK HIGHWAY, WANGETTI, 4877 - Planned Roadworks Both Directions Redcliffe Point. Commencing: 31 March 10:00am Concluding:31 March 3:00pm Short delays expected. Traffic control on scene. Last edited: 31 Mar 2014 09:46
Last report received from DTMR: 2014-04-21T07:50:21
MOSSMAN MOUNT MOLLOY ROAD, JULATTEN, 4871 - Planned Roadworks Both Directions From top of Rex Range to Bushy Creek. Commencing: 17 March, at 7:00am Concluding:June 2014 Short delays expected. Observe signage. Last edited: 14 Mar 2014 09:33
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, EDMONTON, 4869 - Planned Roadworks Both Directions Intersection Mill Rd. Commencing: in progress Concluding:June 2014 Short delays expected. Observe signage. Last edited: 31 Mar 2014 13:04
Last report received from DTMR: 2014-04-21T07:50:21
MULGRAVE ROAD, EARLVILLE, 4870 - Planned Roadworks Inbound From Rigg st to Grafton st. Commencing: in progress Concluding:May 2014 Short delays expected. Observe signage. Last edited: 31 Mar 2014 13:52
Last report received from DTMR: 2014-04-21T07:50:21
MALANDA MILLAA MILLAA ROAD, MINBUN, 4886 - Planned Roadworks Both Directions Near Peterson Road. Commencing: in progress Concluding:May 2014 Unknown traffic impact. Changed traffic conditions. Last edited: 31 Mar 2014 13:56
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, CARDWELL, 4849 - Planned Roadworks All directions Approx 1km North of Cardwell. Commencing: in progress Concluding:June 2014 Short delays expected. Changed traffic conditions. Last edited: 31 Mar 2014 11:44
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, MORESBY, 4871 - Planned Roadworks Both Directions From approximately Moreseby River Bridge to Corsi Road. Commencing: in progress Concluding:May 2014 Short delays expected. Changed traffic conditions. Last edited: 31 Mar 2014 11:50
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, MURRIGAL, 4854 - Planned Roadworks Both Directions Dundonald Creek (between Bilyana Road and Corduroy Creek Bridge). Commencing: in progress Concluding:May 2014 Short delays expected. Changed traffic conditions. Overtaking lanes and pavement rehabilitation Works will be carried out Monday to Saturday between 6.30 am and 5.30pm For more information, phone 4045 7038 Last edited: 06 Jan 2014 09:08
Last report received from DTMR: 2014-04-21T07:50:21
TULLY MISSION BEACH ROAD, MERRYBURN, 4854 - Planned Roadworks Both Directions Commencing: in progress Concluding:June 2014 Short delays expected. Changed traffic conditions. Last edited: 03 Apr 2014 07:13
Last report received from DTMR: 2014-04-21T07:50:21
TULLY HULL ROAD, LOWER TULLY, 4854 - Planned Roadworks Both Directions Commencing: in progress Concluding:June 2014 Short delays expected. Changed traffic conditions. Last edited: 03 Apr 2014 07:14
Last report received from DTMR: 2014-04-21T07:50:21
TULLY MISSION BEACH ROAD, WONGALING BEACH, 4852 - Planned Roadworks Both Directions Commencing: in progress Concluding:May 2014 Short delays expected. Changed traffic conditions. Work will take place between 6am until 6pm Monday to Sunday Last edited: 03 Apr 2014 07:05
Last report received from DTMR: 2014-04-21T07:50:21
LONGLANDS GAP ROAD, HERBERTON, 4887 - Planned Roadworks Both Directions From Denbigh Road to Rolley Road. Commencing: in progress Concluding:May 2014 Short delays expected. The works will repair a 3km section between Florence Street and Rolley Road. The work will include earthworks, repairs to the road pavement and drainage works. Works will continue 6 am to 6 pm, Monday to Sunday, and are expected to be completed in the first half of 2014, weather and resources permitting Last edited: 31 Mar 2014 14:11
Last report received from DTMR: 2014-04-21T07:50:21
TUMOULIN ROAD, EVELYN, 4888 - Planned Roadworks Both Directions The works will repair the section between Kidner Road and Kaban Road. Commencing: in progress Concluding:May 2014 Short delays expected. Last edited: 20 Mar 2014 11:42
Last report received from DTMR: 2014-04-21T07:50:21
PENINSULA DEVELOPMENTAL ROAD, YARRADEN, 4871 - Planned Roadworks Both Directions Between Kalinga Station and Healy Creek. Commencing: in progress Concluding:July 2014 Short delays expected. Changed traffic conditions. Last edited: 31 Mar 2014 14:23
Last report received from DTMR: 2014-04-21T07:50:21
MULLIGAN HIGHWAY, MOUNT CARBINE, 4871 - Planned Roadworks Both Directions Approx 1km south of Mt Carbine. Commencing: in progress Concluding:June 2014 Short delays expected. Changed traffic conditions. Last edited: 31 Mar 2014 14:18
Last report received from DTMR: 2014-04-21T07:50:21
ROSSVILLE BLOOMFIELD ROAD, WUJAL WUJAL, 4895 - Planned Roadworks Both Directions Construction of a bridge over the Bloomfield River. Commencing: in progress Concluding:end April 2014 Short delays expected. Changed traffic conditions. A new crossing is being constructed at Woobadda Creek on the Cape Tribulation Bloomfield Road For further information, please contact Council on 1800 070 444 or email feedback@cairns.qld.gov.au. Last edited: 06 Mar 2014 11:47
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, ELLERBECK, 4816 - Planned Roadworks Both Directions Two Mile Creek Bridge. Commencing: in progress Concluding:April 2014 Short delays expected. Reduced speed limit (80km/h). Last edited: 31 Mar 2014 11:24
Last report received from DTMR: 2014-04-21T07:50:21
GILLIES RANGE ROAD, YUNGABURRA, 4884 - Planned Roadworks Both Directions Multiple locations. Commencing: in progress Concluding:May 2014 Short delays expected. Works will be undertaken at: * Near Powley Road and 1.6km past the Lake Barrine access road, * Malanda-Lake Barrine Road intersection and Curtain Fig Tree Road in Yungaburra Residents wanting to access Gillies Range Road will need to travel via Elm Street and either Pine Street or Short Street. For further information about the project, please contact Lea Coghlan, Project Communications Officer, on 4040 6339 or email reconstruct_cairns@tmr.qld.gov.au Last edited: 31 Mar 2014 14:34
Last report received from DTMR: 2014-04-21T07:50:21
CAPTAIN COOK HIGHWAY, OAK BEACH, 4877 - Planned Roadworks Both Directions Commencing: in progress Concluding:May 2014 Short delays expected. Several sites on the Captain Cook Highway between Buchan Point and Oak Beach. If you have questions about these works, please contact the Project Communications Officer on 4050 5434 Last edited: 31 Mar 2014 14:09
Last report received from DTMR: 2014-04-21T07:50:21
FRONT STREET, MOSSMAN, 4873 - Planned Roadworks Both Directions From Parker Creek to Shopping Centre access. Commencing: in progress Concluding:June 2014 Short delays expected. Changed traffic conditions. Last edited: 31 Mar 2014 14:13
Last report received from DTMR: 2014-04-21T07:50:21
MALANDA MILLAA MILLAA ROAD, TARZALI, 4885 - Planned Roadworks All directions Between Old Millaa Rd and Seamark Rd. Commencing: in progress Concluding:June 2014 Short delays expected. Last edited: 31 Mar 2014 14:00
Last report received from DTMR: 2014-04-21T07:50:21
TINAROO FALLS DAM ROAD, TINAROO, 4872 - Planned Roadworks Both Directions From State farm Rd to Malcom Rd and Lakeside Drive to Eden Drive. Commencing: in progress Concluding:end April 2014 Short delays expected. Traffic control on scene. Asphalt works * 2.47km section between State Farm Road and Malcolm Road * 550m section between Lakeside Drive and Eden Drive For more information, contact Lea Coghlan, Project Communications Officer, on 40406339 or email reconstruct_cairns@tmr.qld.gov.au Last edited: 20 Mar 2014 10:59
Last report received from DTMR: 2014-04-21T07:50:21
MULLIGAN HIGHWAY, COOKTOWN, 4895 - Planned Roadworks Both Directions From Little Annan River Bridge to Black Mountain lookout. Commencing: in progress Concluding:April 2014 Short delays expected. Changed traffic conditions. Last edited: 31 Mar 2014 14:40
Last report received from DTMR: 2014-04-21T07:50:21
KENNEDY HIGHWAY, EVELYN, 4888 - Planned Roadworks Both Directions From Kidner Road to Tumoulin Road. Commencing: in progress Concluding:end May 2014 Short delays expected. Last edited: 31 Mar 2014 14:44
Last report received from DTMR: 2014-04-21T07:50:21
Incidents
GILLIES RANGE ROAD, LITTLE MULGRAVE, 4865 - Infrastructure damage Hazard Both Directions Short delays expected. Observe signage. Lanes reduced due to land slip Last edited: 14 Apr 2014 14:50
Last report received from DTMR: 2014-04-21T07:50:21
MULGRAVE ROAD, BUNGALOW, 4870 - Potholes or road surface damage Hazard Inbound Near Hannam Street intersection. Unknown traffic impact. Changed traffic conditions. Last edited: 14 Apr 2014 04:41
Last report received from DTMR: 2014-04-21T07:50:21
Mackay-Whitsunday
Road Closures/Load Limits
MAY DOWNS ROAD, MAY DOWNS, 4746 - Closed to all vehicles Do not drive in flood waters. Last edited: 17 Apr 2014 09:29
Last report received from DTMR: 2014-04-21T07:50:21
LOTUS CREEK ROAD, LOTUS CREEK, 4705 - Closed to all vehicles Do not drive in flood waters. Last edited: 17 Apr 2014 09:23
Last report received from DTMR: 2014-04-21T07:50:21
BARRIE LANE, ETON, 4741 - Open (with caution) Proceed with caution. Last edited: 16 Apr 2014 15:18
Last report received from DTMR: 2014-04-21T07:50:21
KOWARI GORGE ROAD, FINCH HATTON, 4756 - Closed to all vehicles Do not drive in flood waters. Last edited: 16 Apr 2014 15:19
Last report received from DTMR: 2014-04-21T07:50:21
PALM TREE ROAD, HOMEBUSH, 4740 - Closed to all vehicles Do not drive in flood waters. Last edited: 16 Apr 2014 15:17
Last report received from DTMR: 2014-04-21T07:50:21
Special
BROAD STREET, SARINA, 4737 - Special Event Northbound Commencing: 25 April, at 9:30am Concluding:25 April, at 11:00am Short delays expected. Observe signage. Anzac Day Parade. North bound lanes closed between Railway Parade and Johnston Street. Detour will operate using southbound lanes and alternating between north and south bound traffic. Last edited: 17 Apr 2014 15:21
Last report received from DTMR: 2014-04-21T07:50:21
PEAK DOWNS HIGHWAY, WALKERSTON, 4751 - Special Event Both Directions Commencing: 25 April, at 7:10am Concluding:25 April, at 8:20am Short delays expected. Diversions are in place. Closure for Anzac Day parade. Diversion in place around Broad Street and McColl Street. Last edited: 17 Apr 2014 14:17
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, KOUMALA, 4738 - Special Event Northbound Commencing: 25 April, at 6:50am Concluding:25 April, at 8:15am Short delays expected. Changed traffic conditions. Anzac Day ceremonies. Northbound lane closed between Andrew Street and Molinas Street. Last edited: 17 Apr 2014 14:28
Last report received from DTMR: 2014-04-21T07:50:21
PEAK DOWNS HIGHWAY, WALKERSTON, 4751 - Special Event Both Directions Commencing: 25 April, at 4:50am Concluding:25 April, at 5:20am Short delays expected. Changed traffic conditions. Anzac Day dawn service closure at Walkerston. No diversion in place. Last edited: 17 Apr 2014 14:06
Last report received from DTMR: 2014-04-21T07:50:21
BROAD STREET, SARINA, 4737 - Special Event Both Directions Commencing: 25 April, at 3:45am Concluding:25 April, at 4:50am Short delays expected. Changed traffic conditions. Anzac Day dawn service. Broad Street closed between Railway Parade and Sarina Hotel, both lanes. Last edited: 17 Apr 2014 14:55
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
BRUCE HIGHWAY, BOWEN, 4805 - Planned Roadworks All directions Duck Creek . Commencing: 16 January, at 2:47pm Concluding:30 June, at 6:00pm No delays expected. Observe signage. Roadworks are currently underway at Duck Creek to constructing two overtaking lanes on the Bruce Highway at either side of Duck Creek bridge Last edited: 16 Jan 2014 14:49
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, FARLEIGH, 4741 - Planned Roadworks All directions Coningsby, north of the Coningsby school to the cane rail crossing north of Kochs road. Commencing: 16 January, at 2:33pm Concluding:01 September, at 9:00am No delays expected. Observe signage. WORK is underway to duplicate a section of the Bruce Highway at Coningsby, north of Mackay, giving motorists safer overtaking opportunities. The duplication would be 1.3 kilometres long, providing enough distance for both north and southbound motorists to overtake safely. Last edited: 16 Jan 2014 14:44
Last report received from DTMR: 2014-04-21T07:50:21
PETER DELEMOTHE ROAD, BOWEN, 4805 - Planned Roadworks Both Directions Between 0.6kms and 3.1kms from the Bruce Highway intersection. Commencing: 23 September, at 2:53pm Concluding:30 June, at 6:00pm Short delays expected. Allow extra travel time. For Heavy vehicle clearance please refer to the Permit Management System. Last edited: 11 Dec 2013 23:12
Last report received from DTMR: 2014-04-21T07:50:21
PEAK DOWNS HIGHWAY, ETON, 4741 - Planned Roadworks Both Directions Road works to take place between Eton Township and Drapers Siding including the widening of Sandy Creek Bridge, installation of a pedestrian path and reconstruction of existing pavement from Barrier Street through to Baulch Road/Webbs Road. Commencing: 16 September, at 6:00am Concluding:July 2015 Medium delays expected. Allow extra travel time. Medium delays expected from October 2013 onwards (minimal delays expected before). Stage 1 will commence in September 2013 and will complete maintenance to the existing bridge and replace the downstream kerb units. Expected completion date is December 2013. Stage 2 will commence after the wet season in approximately April 2014 and will involve the reconstruction of the existing pavement and widening of the bridge on the upstream side. All works are expected to be completed by mid 2015. Last edited: 11 Dec 2013 23:12
Last report received from DTMR: 2014-04-21T07:50:21
Fitzroy
Road Closures/Load Limits
APIS CREEK ROAD, DUARINGA, 4712 - Mackenzie River Closed to all vehicles Do not drive in flood waters. Last edited: 17 Apr 2014 08:56
Last report received from DTMR: 2014-04-21T07:50:21
BURNETT HIGHWAY, MOUNT MORGAN, 4714 - Mount Morgan Range Closed to all vehicles Use alternative route. The Burnett Highway is closed to all traffic between Bouldercombe and Mount Morgan due to a rock slide on the Mount Morgan range. Alternate route to Mt Morgan via Burnett Highway, Poison Creek Road and Razorback Road. Follow detour signage Last edited: 02 Apr 2014 16:19
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
YAAMBA ROAD, MILMAN, 4702 - Planned Roadworks Both Directions Bruce Highway - Kunwarara Road intersection. Commencing: 10 April 11:08am Concluding:30 June, at 12:00am No delays expected. Changed traffic conditions. Works have commenced to upgrade the Bruce Highway and Kunwarara Road intersection, north of Rockhampton. Traffic control and speed restrictions are in place. Last edited: 10 Apr 2014 11:09
Last report received from DTMR: 2014-04-21T07:50:21
YAAMBA ROAD, ETNA CREEK, 4702 - Planned Roadworks Both Directions Bruce Highway - Etna Creek Road Intersection.. Commencing: 10 April 10:58am Concluding:30 June, at 12:00am No delays expected. Changed traffic conditions. Works have commenced to upgrade the the Bruce Highway and Etna Creek Road intersection, north of Rockhampton. Traffic control and temporary speed restrictions have been introduced. Last edited: 10 Apr 2014 10:58
Last report received from DTMR: 2014-04-21T07:50:21
YAAMBA ROAD, ROCKYVIEW, 4701 - Planned Roadworks Both Directions Bruce Highway - Meldrum Road Intersection. Commencing: 10 April 10:54am Concluding:30 June, at 12:00am No delays expected. Changed traffic conditions. Works have commenced to upgrade the Bruce Highway and Meldrum Road intersection, north of Rockhampton. Traffic control and speed restrictions are in place. Last edited: 10 Apr 2014 10:55
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, AMBROSE, 4695 - Planned Roadworks Both Directions Bruce Highway - Ambrose. Commencing: 10 April 10:51am Concluding:30 June, at 12:00am No delays expected. Observe signage. Works have commenced to upgrade the Bruce Highway and Gentle Annie Road/Sinclair Street intersection in Ambrose. Traffic control and speed restrictions are in place. Last edited: 10 Apr 2014 10:51
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, PORT CURTIS, 4700 - Planned Roadworks Both Directions Bruce Highway - Egans Hill to Yeppen Roundabout. Commencing: 10 April 10:29am Concluding:31 March, at 12:00am No delays expected. Changed traffic conditions. Construction has commenced on the $296 million Yeppen South project between Egans Hill and Yeppen roundabout, south of Rockhampton. Speed restrictions are in place. Last edited: 10 Apr 2014 10:30
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, RAGLAN, 4697 - Planned Roadworks Both Directions Four sites between Rockhampton and Benaraby. Commencing: 08 April, at 1:03pm Concluding:30 May, at 11:00pm Short delays expected. Observe signage. Reconstruction works are underway on the Bruce Highway (four sites between Rockhampton and Benaraby). Traffic control, including single lane closures, will be in place and delays of up to 15 minutes can be expected. Motorists are advised to drive to the changed conditions and follow all signage for their own safety and the safety of road workers. Last edited: 08 Apr 2014 13:05
Last report received from DTMR: 2014-04-21T07:50:21
BURNETT HIGHWAY, THANGOOL, 4716 - Planned Roadworks All directions Two sites between Coominglah and Biloela. Commencing: 02 April, at 3:01pm Concluding:30 May, at 12:00am No delays expected. Proceed with caution. Reconstruction roadworks are underway on the Burnett Highway (two sites between Coominglah and Biloela). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers. Last edited: 02 Apr 2014 15:01
Last report received from DTMR: 2014-04-21T07:50:21
EIDSVOLD THEODORE ROAD, CRACOW, 4719 - Planned Roadworks Both Directions Immediately to the east of Cracow. Commencing: 19 March, at 11:34am Concluding:31 December, at 6:00pm Short delays expected. Changed traffic conditions. Last edited: 10 Apr 2014 10:08
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, MARMOR, 4702 - Planned Roadworks Both Directions Bruce Highway and Tynan Street intersection. Commencing: 04 March, at 3:40pm Concluding:30 May, at 12:00am No delays expected. Observe signage. Traffic control is in place on the Bruce Highway through Marmor for the delivery of the Tynan Street intersection upgrade. Last edited: 04 Mar 2014 15:42
Last report received from DTMR: 2014-04-21T07:50:21
GEORGE STREET, ROCKHAMPTON CITY, 4700 - Planned Roadworks Both Directions George Street and Albert Street intersection. Commencing: 21 February 8:51am Concluding:03 June, at 4:00pm No delays expected. Observe signage. Works have commenced to construct a slip lane for southbound traffic at the George Street and Albert Street intersection. Traffic control in place. Last edited: 21 Feb 2014 08:53
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, MIRIAM VALE, 4677 - Planned Roadworks Both Directions Six sites between Benaraby and the Kolan River. Commencing: 08 January, at 9:14am Concluding:30 May, at 6:00pm Short delays expected. Changed traffic conditions. Reconstruction roadworks are underway on the Bruce Highway (six sites between Benaraby and the Kolan River). Traffic control, including single lane closures, will be in place and delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers. Last edited: 08 Apr 2014 12:20
Last report received from DTMR: 2014-04-21T07:50:21
CAPRICORN HIGHWAY, STANWELL, 4702 - Planned Roadworks Both Directions 2 sites between Rockhampton and Duaringa. Commencing: 10 December, at 1:14pm Concluding:30 May, at 6:00pm Short delays expected. Observe signage. Reconstruction roadworks are underway on the Capricorn Highway (two sites between Duaringa and Rockhampton). Delays of up to 15 minutes at each site can be expected. Motorists should drive to the changed conditions follow all signage for their own safety and the safety of road workers. Last edited: 21 Mar 2014 12:59
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, CALLIOPE, 4680 - Planned Roadworks Commencing: 12 October, at 8:58am Concluding:30 May, at 12:00am Short delays expected. Observe signage. The Calliope Crossroads intersection upgrade is underway at the Dawson Highway and Bruce Highway intersection. Speed restrictions and traffic control are in place. Last edited: 04 Mar 2014 15:37
Last report received from DTMR: 2014-04-21T07:50:21
Incidents
BRUCE HIGHWAY, MARMOR, 4702 - Potholes or road surface damage Hazard Northbound Just after BP service station. No delays expected. Proceed with caution. Last edited: 13 Apr 2014 20:35
Last report received from DTMR: 2014-04-21T07:50:21
FITZROY DEVELOPMENTAL ROAD, MIMOSA, 4702 - Infrastructure damage Hazard Both Directions Fitzroy Developmental Road, 8km South of Munbun Creek.. No delays expected. Reduced speed limit (60km/h). Last edited: 13 Apr 2014 06:01
Last report received from DTMR: 2014-04-21T07:50:21
EIDSVOLD THEODORE ROAD, CAMBOON, 4719 - Infrastructure damage Hazard Both Directions Boam Creek Bridge. No delays expected. Reduced speed limit (60km/h). Sidetrack under construction. Boam Creek Bridge will then be closed until repair works completed. Last edited: 10 Apr 2014 10:08
Last report received from DTMR: 2014-04-21T07:50:21
Northern
Road Closures/Load Limits
EDDLESTON DRIVE, HALIFAX, 4850 - Ingham Halifax Bemerside Road at Halifax Washaway Open (with caution) Proceed with caution. Traffic control in place Last edited: 17 Apr 2014 12:25
Last report received from DTMR: 2014-04-21T07:50:21
WOODSTOCK GIRU ROAD, MAJORS CREEK, 4816 - Majors Creek - 6km South of Woodstock Open (with caution) No delays. Last edited: 17 Apr 2014 12:24
Last report received from DTMR: 2014-04-21T07:50:21
Special
FLINDERS HIGHWAY, CALCIUM, 4816 - Special Event Both Directions An event will be in place on the Flinders Highway between Booth Road (Oak valley) and Murrays Road (Calcium)on both Sunday 20 April and Sunday 6 July. Commencing: 20 April, at 6:30am Concluding:06 July, at 12:00pm Short delays expected. Motorists are urged to show patience. Last edited: 16 Apr 2014 16:27
Last report received from DTMR: 2014-04-21T07:50:21
FLINDERS STREET, TOWNSVILLE CITY, 4810 - Special Event Both Directions Between Denham Street and Stokes Street. Sundays 6am to 3pm. Commencing: 02 August, at 6:00am Concluding:17 June 2021, at 3:00pm Unknown traffic impact. Use alternative route. Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event. Last edited: 16 Apr 2014 16:26
Last report received from DTMR: 2014-04-21T07:50:21
Roadworks
ANGUS SMITH DRIVE, DOUGLAS, 4354 - Planned Roadworks Angus Smith Drive and Windarra Avenue Intersection. Commencing: 22 April, at 8:00am Concluding:13 May, at 4:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:23
Last report received from DTMR: 2014-04-21T07:50:21
BUNDOCK STREET, NORTH WARD, 4810 - Planned Roadworks Both Directions Howitt Street, between Rose and Mitchell Streets. Commencing: 17 April, at 8:00am Concluding:09 May, at 4:00pm No delays expected. Observe signage. Last edited: 17 Apr 2014 16:44
Last report received from DTMR: 2014-04-21T07:50:21
BOUNDARY STREET, RAILWAY ESTATE, 4810 - Planned Roadworks Commencing: 16 April, at 7:00am Concluding:30 June, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:22
Last report received from DTMR: 2014-04-21T07:50:21
BUNDOCK STREET, BELGIAN GARDENS, 4810 - Planned Roadworks Both Directions Between Little Street and Bishop Street. Commencing: 14 April, at 9:00am Concluding:26 May, at 3:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:18
Last report received from DTMR: 2014-04-21T07:50:21
VICTORIA MILL ROAD, INGHAM, 4850 - Planned Roadworks Outbound Leichardt Street, Near Intersection at Wattle Street . Commencing: 11 April, at 6:30am Concluding:02 May, at 6:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:20
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, ALLIGATOR CREEK, 4740 - Planned Roadworks Both Directions Gaurd Rail Works. Commencing: March 2014 Concluding:Late April 2014 Short delays expected. Observe signage. - Repair works have commenced on the Alligator Creek guardrail approximately 15km south of Townsville. - Lane closures, speed restrictions and traffic controllers will be in place and delays of up to 10 minutes can be expected. - Traffic lights will be in operation after hours. - Motorists are urged to observe and obey all signage when travelling through this site. Last edited: 16 Apr 2014 16:22
Last report received from DTMR: 2014-04-21T07:50:21
INGHAM ROAD, MOUNT ST JOHN, 4818 - Planned Roadworks Both Directions Blakeys Crossing the section of Ingham Road between mather Street and Duckworth Street is being upgraded. From Wednesday 23 April until the completion of the project, council will close this section of Ingham Road. . Commencing: October 2013 Concluding:prior to 2014/2015 wet season No delays expected. Use alternative route. Last edited: 16 Apr 2014 16:21
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, NOME, 4816 - Planned Roadworks Single lane closures in various locations between the Pink Lily Lagoon Bridge and the Stuart Railway Overpass. Commencing: 07 April, at 8:00am Concluding:07 July, at 5:00pm Unknown traffic impact. Changed traffic conditions. Last edited: 16 Apr 2014 16:18
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, DEERAGUN, 4818 - Planned Roadworks Both Directions Works are to extend the turning lane into Garland Road. Commencing: 07 April, at 6:30am Concluding:28 April, at 5:00pm Short delays expected. Changed traffic conditions. Last edited: 16 Apr 2014 16:19
Last report received from DTMR: 2014-04-21T07:50:21
ROSS RIVER ROAD, AITKENVALE, 4814 - Planned Roadworks Commencing: 01 April 7:00am Concluding:01 June, at 7:00pm No delays expected. Observe signage. NBN Bulk Drops Last edited: 16 Apr 2014 16:15
Last report received from DTMR: 2014-04-21T07:50:21
NATHAN STREET, AITKENVALE, 4814 - Planned Roadworks Commencing: 01 April 7:00am Concluding:01 June, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:15
Last report received from DTMR: 2014-04-21T07:50:21
NATHAN STREET, AITKENVALE, 4814 - Planned Roadworks Partial lane closures in various locations along Nathan Street . Commencing: 28 March, at 5:05pm Concluding:28 May, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:17
Last report received from DTMR: 2014-04-21T07:50:21
ROSS RIVER ROAD, AITKENVALE, 4814 - Planned Roadworks Partial Lane closures in various locations along Ross River Road. Commencing: 28 March, at 4:44pm Concluding:28 May, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:16
Last report received from DTMR: 2014-04-21T07:50:21
FLINDERS HIGHWAY, QUEENTON, 4820 - Planned Roadworks Commencing: 27 March, at 9:00am Concluding:16 March 2015 No delays expected. Observe signage. Last edited: 16 Apr 2014 16:19
Last report received from DTMR: 2014-04-21T07:50:21
BOUNDARY STREET, RAILWAY ESTATE, 4810 - Planned Roadworks Boundary Street & Saunders Street. Commencing: 18 March, at 9:00am Concluding:30 June, at 3:00pm No delays expected. Changed traffic conditions. Last edited: 16 Apr 2014 16:08
Last report received from DTMR: 2014-04-21T07:50:21
CHARTERS TOWERS ROAD, HERMIT PARK, 4812 - Planned Roadworks Both Directions From Woolcock Street to Queens Road. Commencing: 18 March, at 9:00am Concluding:30 June, at 3:00pm No delays expected. Observe signage. Street light maintenance works Last edited: 16 Apr 2014 16:08
Last report received from DTMR: 2014-04-21T07:50:21
BOWEN ROAD, ROSSLEA, 4812 - Planned Roadworks Both Directions From Ross River Road to Tyack Street. Commencing: 18 March, at 9:00am Concluding:30 June, at 3:00pm No delays expected. Observe signage. Street light maintenance works Last edited: 16 Apr 2014 16:09
Last report received from DTMR: 2014-04-21T07:50:21
ANGUS SMITH DRIVE, DOUGLAS, 4354 - Planned Roadworks Both Directions From University Road to the Ring Road on ramp. Commencing: 18 March, at 9:00am Concluding:30 June, at 3:00pm No delays expected. Observe signage. Street light maintenance works Last edited: 16 Apr 2014 16:12
Last report received from DTMR: 2014-04-21T07:50:21
WOOLCOCK STREET, GARBUTT, 4814 - Planned Roadworks Both Directions Between Blakey Street and Pilkington Street. Commencing: 18 March, at 9:00am Concluding:15 May, at 3:00pm No delays expected. Observe signage. Street light maintenance works Last edited: 16 Apr 2014 16:12
Last report received from DTMR: 2014-04-21T07:50:21
DALRYMPLE ROAD, MOUNT LOUISA, 4814 - Planned Roadworks Both Directions From Thorn Street to Angus Avenue. Commencing: 18 March, at 9:00am Concluding:15 May, at 3:00pm No delays expected. Proceed with caution. Street light maintenance works Last edited: 16 Apr 2014 16:13
Last report received from DTMR: 2014-04-21T07:50:21
UNIVERSITY ROAD, ANNANDALE, 4814 - Planned Roadworks All directions Works are taking place on the University Road and Melton Black Drive and MacArthur Drive roundabout. . Commencing: March 2014 Concluding:July 2014 Short delays expected. Changed traffic conditions. Melton Black Drive Intersection Upgrade Intersection of University Road (Bruce Highway), MacArthur Drive and Melton Black Drive, Annandale. Roadworks and changed traffic conditions March to July 2014 (weather permitting) Works will be taking place between 6.00am and 6.00pm, Monday to Saturday. The Department of Transport and Main Roads advises that works are commencing on the upgrade of the Melton Black Drive, MacArthur Drive and University Road intersection in Annandale. The project will remove the current roundabout on University Road and replace it with a fully signalised intersection (traffic lights). During these works, there will be a number of changed traffic conditions on University Road and MacArthur Drive including: - Lane Closures - Speed Restrictions - Restricted access for cyclists and pedestrians - Permanent removal of parking bays along MacArthur Drive (these are to be converted into additional traffic lanes) - Relocation of bus stops along MacArthur Drive 24 hour lane closures will be implemented from March 17th 2014. During these works, motorists should expect traffic delays when travelling through the area, particularly during peak hours. To avoid delays, motorists are advised to allow extra travel time when using University Road or MacArthur Drive and consider alternative routes wherever possible during these works. Last edited: 16 Apr 2014 16:14
Last report received from DTMR: 2014-04-21T07:50:21
ROONEYS BRIDGE, RAILWAY ESTATE, 4810 - Planned Roadworks Both Directions Works to pedestrian walkway next to Rooneys Bridge. Commencing: 10 March, at 6:00am Concluding:14 May, at 4:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:25
Last report received from DTMR: 2014-04-21T07:50:21
GREGORY DEVELOPMENTAL ROAD, BASALT, 4820 - Planned Roadworks Both Directions Commencing: March 2013 Concluding: Late May 2014 Short delays expected. Observe signage. GREGORY DEVELOPMENTAL ROAD (Charters Towers - Lynd) Hervey's Range Road intersection and Bluewater Springs Reconstruction works Anticipated completion - Late May 2014 *Final sealing works are currently underway for the Natural Disaster Relief and Recovery Arrangements work along the Gregory Developmental Road between Hervey Range Road and Bluewater Springs. *Works will continue over several floodways until the end of May 2014. *An 80km/hr speed limit will remain in place until all floodway works are completed. Last edited: 16 Apr 2014 16:21
Last report received from DTMR: 2014-04-21T07:50:21
STUART DRIVE, ROSENEATH, 4811 - Planned Roadworks Commencing: 01 March, at 6:00am Concluding:30 April, at 5:00pm Unknown traffic impact. Changed traffic conditions. Last edited: 16 Apr 2014 16:04
Last report received from DTMR: 2014-04-21T07:50:21
CHARTERS TOWERS ROAD, HYDE PARK, 4812 - Planned Roadworks At various locations. Commencing: 24 February, at 7:00am Concluding:02 May, at 5:00pm Unknown traffic impact. Changed traffic conditions. Last edited: 16 Apr 2014 16:22
Last report received from DTMR: 2014-04-21T07:50:21
BOUNDARY STREET, SOUTH TOWNSVILLE, 4810 - Planned Roadworks Both Directions Nightworks occuring between Sixth Avenue and Fourth Avenue. Commencing: 21 February, at 8:00pm Concluding:01 May, at 4:00am Short delays expected. Traffic control on scene. Last edited: 16 Apr 2014 16:03
Last report received from DTMR: 2014-04-21T07:50:21
QUEEN STREET, AYR, 4807 - Planned Roadworks Northbound Near the Bower Street roundabout. Commencing: 18 February, at 12:00am Concluding:30 June, at 11:59pm No delays expected. Observe signage. Drainage works in road shoulder Last edited: 16 Apr 2014 16:01
Last report received from DTMR: 2014-04-21T07:50:21
STUART DRIVE, CLUDEN, 4811 - Planned Roadworks Both Directions Between Watt Street and Edison Street. Commencing: 03 February 6:30am Concluding:11 July, at 6:30pm No delays expected. Observe signage. Last edited: 17 Apr 2014 16:53
Last report received from DTMR: 2014-04-21T07:50:21
NATHAN STREET, AITKENVALE, 4814 - Planned Roadworks Both Directions Between Dalrymple Road and Angus Smith Drive. Commencing: 01 February, at 7:00am Concluding:30 April, at 6:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:04
Last report received from DTMR: 2014-04-21T07:50:21
ROSS RIVER ROAD, CRANBROOK, 4814 - Planned Roadworks Both Directions Between O'Rielly Street and Bamford Lane . Commencing: 01 February, at 7:00am Concluding:30 April, at 6:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:03
Last report received from DTMR: 2014-04-21T07:50:21
WOOLCOCK STREET, HYDE PARK, 4812 - Planned Roadworks Both Directions Streetlight maintenance will occur between Charters Towers Road and Dalrymple Road. Commencing: 28 January, at 9:00am Concluding:30 June, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:14
Last report received from DTMR: 2014-04-21T07:50:21
DALRYMPLE ROAD, CURRAJONG, 4812 - Planned Roadworks Both Directions Streetlight maintenance will occur between Mackley Street and Hastings Street. Commencing: 28 January, at 9:00am Concluding:30 June, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:14
Last report received from DTMR: 2014-04-21T07:50:21
ABBOTT STREET, OONOONBA, 4811 - Planned Roadworks Northbound Between McPherson Street and First Avenue. Commencing: 28 January 9:00am Concluding:30 June, at 4:00pm No delays expected. Observe signage. Works on Abbott Street between McPherson Street and First Avenue. Last edited: 16 Apr 2014 16:07
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, STUART, 4811 - Planned Roadworks Both Directions Streetlight maintenance will be occurring from Southwood Road to Burdell Street. Commencing: 28 January, at 6:00am Concluding:30 June, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:07
Last report received from DTMR: 2014-04-21T07:50:21
BOUNDARY STREET, RAILWAY ESTATE, 4810 - Planned Roadworks Civil works at various locations. Commencing: 23 January, at 10:00am Concluding:31 July, at 3:30am Unknown traffic impact. Changed traffic conditions. Last edited: 16 Apr 2014 16:02
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, MCDESME, 4807 - Planned Roadworks All directions Signage for works on Giddy Road and McDesme Road. Commencing: 20 January, at 6:30am Concluding:15 May, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:13
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, DEERAGUN, 4818 - Planned Roadworks All directions Commencing: 20 December, at 12:00am Concluding:20 December 2014 No delays expected. Observe signage. Last edited: 16 Apr 2014 16:05
Last report received from DTMR: 2014-04-21T07:50:21
HALIFAX ROAD, INGHAM, 4850 - Planned Roadworks Both Directions Signage at the Gairloch Road intersection. Commencing: 02 December, at 6:30am Concluding:30 April, at 6:30pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:15
Last report received from DTMR: 2014-04-21T07:50:21
ABERGOWRIE ROAD, LONG POCKET, 4850 - Planned Roadworks Both Directions Signage at the Barkers Street intersection. Commencing: 02 December, at 6:30am Concluding:30 April, at 6:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:16
Last report received from DTMR: 2014-04-21T07:50:21
ABERGOWRIE ROAD, ABERGOWRIE, 4850 - Planned Roadworks Both Directions Speed reductions in place on Ingham Abergowrie Road for road works on Crotons Road. Commencing: 02 December, at 6:00am Concluding:30 April, at 6:00pm No delays expected. Changed traffic conditions. Last edited: 16 Apr 2014 16:17
Last report received from DTMR: 2014-04-21T07:50:21
LAKESIDE DRIVE, IDALIA, 4811 - Planned Roadworks Both Directions Construction works on Lakeside Drive. Commencing: 30 November, at 7:00am Concluding:30 November 2014, at 6:30pm Unknown traffic impact. Observe signage. Last edited: 16 Apr 2014 16:05
Last report received from DTMR: 2014-04-21T07:50:21
HALIFAX ROAD, FORESTHOME, 4850 - Planned Roadworks Both Directions Along several locations through to the Halifax Lucinda Point Road suspended until after the wet season in 2014. Commencing: 20 November, at 5:29pm Concluding:August 2014 No delays expected. Observe signage. INGHAM - HALIFAX - BEMERSIDE ROAD HALIFAX - LUCINDA POINT ROAD Various Sites Reconstruction works Anticipated Completion: August 2014 * Natural Disaster Relief and Recovery work along several sections of the Ingham-Halifax-Bemerside Road will be suspended from Wednesday 18 December 2013 and will resume after the wet season in 2014. Work Location: INGHAM-HALIFAX-BEMERSIDE ROAD * Tramway underpass - Filippi Road * Anabranch Bridge - Bruce Highway * Merrybank Road to Vitale Road * Bruce Highway to Origlasso Street * This project will be delivered in stages and intermittently to best manage wet weather risk. * Completion is anticipated for August 2014. * When works have recommenced, motorists can expect lane closures, speed restrictions, delays of up to 15 minutes. Traffic controllers will be on site during the day with traffic lights in operation after hours. * Wide load restrictions of more than 3m will be in place and drivers are directed to contact Ben Gibson on 0477 306 851 or Matthew Smith on 0427 122 503 prior to passing through the roadworks, with notice to be provided a minimum of 48 hours in advance. Last edited: 16 Apr 2014 16:19
Last report received from DTMR: 2014-04-21T07:50:21
VICTORIA MILL ROAD, INGHAM, 4850 - Planned Roadworks Commencing: 06 November, at 7:00am Concluding:30 April, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:18
Last report received from DTMR: 2014-04-21T07:50:21
PERCY STREET, WEST END, 4810 - Planned Roadworks Signage on Percy Street for works along Ralston Street. Commencing: 19 October, at 6:00am Concluding:26 May, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:20
Last report received from DTMR: 2014-04-21T07:50:21
DISCOVERY DRIVE, DOUGLAS, 4354 - Planned Roadworks Southbound Road Reserve. Commencing: 15 October, at 7:00am Concluding:01 July, at 5:00pm No delays expected. Observe signage. Last edited: 16 Apr 2014 16:02
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, STUART, 4811 - Planned Roadworks Both Directions Between Vantassel Street and Stuart Drive. Wide load restrictions apply. Commencing: 09 October, at 9:29am Concluding:Mid 2015 Short delays expected. Reduced speed limit (60km/h). BRUCE HIGHWAY (Ayr - Townsville) Vantassel to Cluden Highway Duplication Anticipated completion: Early 2015 * Work is underway on the duplication of a seven kilometre section of the Bruce Highway between Vantassel Street and Stuart Drive, Cluden. * This project includes the construction of a road overpass at the rail line at Cluden and upgrades to several intersections. * A 60km/h speed restriction is now in place on this section of the Bruce Highway. * Short closures may be required around the Abbott Street intersection while piling works progress on the new rail overpass. * Traffic controllers are on site and motorists should expect minor delays when travelling on this section of the highway. * Please be patient while driving on this section of the highway and be aware of workers and changed traffic conditions in the area. * Information for heavy vehicle operator: If you are travelling on this section of the Bruce Highway with excess dimension loads wider than 3.5m, please contact Stephen Kennedy on 0419 316 084 or Dennis Cooke on 0408 818 303 a minimum of 24 hours prior to passing through the roadworks. Last edited: 16 Apr 2014 16:03
Last report received from DTMR: 2014-04-21T07:50:21
FLINDERS HIGHWAY, CAMPASPE, 4820 - Planned Roadworks Both Directions 80km of works between Porters Road and Alpha Creek. Commencing: 10 September, at 9:53am Concluding:April 2014 Short delays expected. Observe signage. FLINDERS HIGHWAY - (Charters Towers - Hughenden) Porters Road to Alpha Creek Reconstruction works Anticipated Completion: April 2014 *Natural Disaster Relief and Recovery Arrangements (NDRRA) work has resumed over several sections of the Flinders Highway between the Traveller Information Board and Alpha Creek *Pavement rehabilitation work is occurring on two zones west of Charters Towers *The Flinders Highway at these sections will be subject to changed traffic conditions which will include lane closures and speed restrictions with delays of up to 15 minutes. *Complimentary upgrade work at Puddler Creek approximately 60km west of Charters Towers has also resumed. The road alignment on the bridge has been altered with a one laned sidetrack and is operating under traffic signals. *Excess dimension restrictions are in place for loads wider than 3.5metres. Operators must contact Tony Catton on 0418 490 894 prior to passing through the roadworks, with notice to be provided a minimum of 48 hours in advance. *Motorists are urged to observe and obey all signage when travelling through this project. Last edited: 16 Apr 2014 16:01
Last report received from DTMR: 2014-04-21T07:50:21
HERVEY RANGE ROAD, HERVEY RANGE, 4817 - Planned Roadworks Both Directions 24 kilometres of the Hervey Range Road between Black River Road and the Gun Club Access. Wide load restrictions apply. Commencing: 22 July, at 1:30pm Concluding:April 2014 Short delays expected. Observe signage. HERVEY'S RANGE DEVELOPMENTAL ROAD(Townsville - Battery) Reconstruction Works Anticipated Completion - April 2014 *Natural Disaster Relief and Recovery Arrangements work along 24kms of Hervey's Range Road recommenced in January 2014 and work is expected to be completed by June 2014. *Paving and patching work is currently being undertaken between the Hervey’s Range Tea Rooms to Black Gin Creek Bridge *Single lane closures, speed restrictions and minor delays are in place. *Motorists are advised to observe and obey all signage when travelling through this project. *Wide loads restrictions are also in place and operators must contact the site supervisor Rob White on 0429 595 613 or Peter Webster 0408 135 348 prior to arriving so that arrangements can be made to ensure safe passage through the worksite. Last edited: 16 Apr 2014 16:00
Last report received from DTMR: 2014-04-21T07:50:21
FLINDERS HIGHWAY, CAMPASPE, 4820 - Planned Roadworks Both Directions Granite Creek Bridge has been reduced down to one lane and a 60km/hr speed limit has been put in place. These measures have been taken as a precaution until bridge strengthening works can take place . Commencing: 27 May, at 4:23pm Concluding:to be advised Short delays expected. Changed traffic conditions. FLINDERS HIGHWAY (Charters Towers - Hughenden) Granite Creek Bridge Changed Conditions * Due to changes with the Department of Transport and Main Roads'(TMR) structural standards and for motorists safety, the Granite Creek Bridge, 92km south west of Charters Towers has been reduced down to one lane * In addition, a 60km/hr speed limit has been put in place * These measures have been taken as a precaution until bridge strengthening works can take place * Motorists have been advised to observe and obey all signage when travelling over this bridge Last edited: 16 Apr 2014 16:05
Last report received from DTMR: 2014-04-21T07:50:21
GREGORY DEVELOPMENTAL ROAD, BROUGHTON, 4820 - Planned Roadworks Both Directions Near Policeman Creek. Commencing: 15 February, at 1:25pm Concluding: To be advised No delays expected. Changed traffic conditions. Wide Load operators please contact Ben Gibson on 0477 306 851 Last edited: 16 Apr 2014 16:07
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, INGHAM, 4850 - Planned Roadworks Both Directions Arnot Creek Bridge 60 kilometre an hour speed restriction in place. Commencing: Early 2013 Concluding:Dec 2014 No delays expected. Observe signage. Ingham to Cardwell Range Arnot Creek Bridge * The Arnot Creek Bridge is open to two lanes of traffic, however a 60km/hr speed limit over the bridge remains in place until bridge repairs have been investigated and completed. * Motorists are advised to observe and obey all signage when travelling through this site. Last edited: 16 Apr 2014 16:06
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, BRANDON, 4808 - Planned Roadworks Southbound Sandy Corner to Collinsons Lagoon. Commencing: 30 November, at 5:00pm Concluding:Mid 2014 Unknown traffic impact. Observe signage. Sandy Corner to Collinson's Lagoon Road realignment Anticipated completion - mid 2014 * Presently there is no linemarking, so it is extremely important that motorists do not overtake or exceed the posted speed limits. The Department (TMR) urges all motorists to adhere to these restrictions as Queensland Police regularly patrol this section of the highway. Last edited: 16 Apr 2014 16:20
Last report received from DTMR: 2014-04-21T07:50:21
RIVERWAY DRIVE, THURINGOWA CENTRAL, 4817 - Planned Roadworks Southbound 210 metres south of the Village Boulevard intersection. Commencing: 27 September, at 12:00am Concluding:31 May 2014, at 12:00am No delays expected. Observe signage. Installation of a temporary access to construction site. Speed restrictions in place. Please drive with caution in the area. Last edited: 16 Apr 2014 16:06
Last report received from DTMR: 2014-04-21T07:50:21
QUEEN STREET, AYR, 4807 - Planned Roadworks Erection and dismantling of decorations and banners between Edward Street and Young Street. Commencing: 20 August 2012, at 6:00am Concluding:19 August 2014, at 4:00pm No delays expected. Traffic control on scene. Last edited: 16 Apr 2014 16:02
Last report received from DTMR: 2014-04-21T07:50:21
EIGHTH STREET, HOME HILL, 4806 - Planned Roadworks Erecting and dismantling of decorations and banners between Tenth Street and Sixth Street. Commencing: 20 August 2012, at 6:00am Concluding:19 August 2014, at 4:00pm No delays expected. Traffic control on scene. Last edited: 16 Apr 2014 16:14
Last report received from DTMR: 2014-04-21T07:50:21
BRUCE HIGHWAY, CLEMANT, 4816 - Planned Roadworks Northbound Maintenance works on the water pipe alongside the Bruce Highway, at various locations between Townsville and north of Rollingstone. Commencing: 12 May, at 7:00am Concluding:11 May 2014 No delays expected. Observe signage. Partial closure of the road shoulder and adjacent lane will be in place during work hours with signage and speed restrictions on site for the duration of the works. Last edited: 16 Apr 2014 16:01
Last report received from DTMR: 2014-04-21T07:50:21
Incidents
INGHAM ROAD, MOUNT ST JOHN, 4818 - Flood Hazard All directions Blakeys Crossing is closed to all traffic. Long delays expected. Use alternative route. Last edited: 16 Apr 2014 15:58
Last report received from DTMR: 2014-04-21T07:50:21
MOUNT SPEC ROAD, PALUMA, 4816 - Flash flooding Hazard Both Directions Medium delays expected. Proceed with caution. Land Slip Last edited: 16 Apr 2014 15:58
Last report received from DTMR: 2014-04-21T07:50:21