Road Conditions

Print this page

Region

QLD map - click for road conditions in each region
Click a region to view local road conditions

Road report information is compiled by RACQ in partnership with The Department of Transport and Main Roads, Queensland Police Service and other government sources/websites (see disclaimer).

Queensland State Government logoQueensland Police logo

1 - South Coast (Logan, Gold Coast, Boonah...) 2 - Metropolitan (Brisbane, Ipswich, Cleveland...) 3 - North Coast (Sunshine Coast, Caboolture, Redcliffe, Kilcoy, Esk...) 4 - Wide Bay & Burnett (Gympie, Bundaberg, Maryborough...) 12 - Darling Downs (Toowoomba, Miles, Stanthorpe...) 4 - Wide Bay & Burnett (Gympie, Bundaberg, Maryborough...) 5 - Fitzroy (Gladstone, Rockhampton, Emerald...) 6- Mackay/Whitsunday (Bowen, St. Lawrence, Clermont...) 7 - Northern (Ingham, Townsville, Ayr, Charters Towers...) 8- Far North (Cooktown, Cairns, Tully...) 9- North West (Mount Isa, Normanton, Hughenden...) 10- Central West (Boulia, Winton, Barcaldine, Blackall, Longreach...) 11- South West (Roma, St. George, Charleville...) 12 - Darling Downs (Toowoomba, Miles, Stanthorpe...) Please use the map detail (zoomed rectangle) above

Cause

Metropolitan
Special
MULGOWIE ROAD, MULGOWIE, 4341 - Special Event Both Directions Between Brown Springs Road, McGarrigals Road and Red Gap Road. Commencing: 14 September 2014, betweeen the hours of approximately 7:00am and approximately 5:00pm. Concluding:14 September 2014. Partial lane closures Delays expected. Changed traffic conditions. Road Impacts during event: Reduced Speed to 40km/hr, Traffic Control with possible delays of up to 5 minutes. Motorists are urged to show patience. For more information visit: http://www.cycleepic.com Last edited: 08 Aug 2014 15:16
Last report received from DTMR: 2014-08-27T19:50:25
PATRICK STREET, LAIDLEY, 4341 - Special Event Both Directions Laidley Spring Festival 2014. Commencing: 13 September 2014, between the hours of 9:00am and 3:00pm approx. Concluding: 13 September 2014 Partial lane closures No delays expected. Changed traffic conditions. Road Impacts during event: Road Closed between the hours of 12:00pm and 2:30pm from Spicer Street to White Street (Gatton Laidley Road), with a diversion in place. Please proceed with caution and obey signage. For More Information on the event please visit:- http://www.lockyervalley.qld.gov.au/news-events/news/1231-full-steam-ahead-for-laidley-spring-festival Last edited: 20 Aug 2014 14:05
Last report received from DTMR: 2014-08-27T19:50:25
GATEWAY MOTORWAY BRIDGE, MURARRIE, 4172 - Special Event Both Directions Via Kingsford Smith Drive to Brisbane City. Commencing: 07 September 1:00am Concluding:07 September 2014, at 12:00pm Both lanes affected Long delays expected. Diversions are in place. Due to the staging of this years' Bridge to Brisbane on Sunday 7th September, various road closures north and south of the Gateway Bridge, including the Inner City Bypass (inbound from KSD) and Kingsford Smith Drive shall be in place between the hours of 1 am and Mid-day. Access to the airport from the South/Gold Coast and from the North/Sunshine Coast will be maintained. For further details on the course and road closures please visit www.bridgetobrisbane.com.au or call 131940. #183 Last edited: 27 Aug 2014 13:55
Last report received from DTMR: 2014-08-27T19:50:25
OXFORD STREET, BULIMBA, 4171 - Special Event Both Directions Bulimba Festival. Commencing: 31 August 2014, at 3:00am Concluding:31 August 2014, at 8:00pm Both lanes affected Delays expected. Diversions are in place. Brisbane City Council wishes to advise that due to the staging of this years' Bulimba Festival on Sunday 31st August, Oxford Street between Lytton Road and Love Street shall be closed between the hours of 3am and 8pm. Various local streets may also be impacted by this event. For further information on this event please visit www.bulimbafestival.com.au or call 3403 8888 Last edited: 01 Aug 2014 22:52
Last report received from DTMR: 2014-08-27T19:50:25
MILTON ROAD, MILTON, 4064 - Special Event All directions Commencing: 29 August 7:30pm Concluding:29 August 2014, at 9:30pm Partial lane closures Delays expected. Changed traffic conditions. The Brisbane Broncos v St George Dragons Rugby League game will be held at Suncorp Stadium on Friday 29 August from 7:30pm. Major roads closed for an hour following the game:  Roma St inbound will be closed between Skew St and Turbot St.  Petrie Terrace closed between Milton Rd and Caxton St, except local traffic.  Milton Rd closed inbound between Park Rd and Petrie Tce and  Caxton St closed between Hale St and Petrie Tce. Coronation Dr and Hale St will remain open at all times. Re-directional signs will be placed on the major routes approaching the Stadium. Minor Roads closed for an hour following the game are:  Cribb St between Railway Tce and Milton Rd.  Paten St, Black St, Granzella St. Minor roads closed for 2½ hours before and 1 hour following the game are:  Castlemaine St, Chippendall St, Finchley St, Mayneview St, Parkview St and Cordova St. Motorists attending the event should also be aware of the 15 minute parking restriction that applies to the Suncorp Traffic Area on match days. Last edited: 25 Aug 2014 23:44
Last report received from DTMR: 2014-08-27T19:50:25
Roadworks
SANDGATE ROAD, BOONDALL, 4034 - Planned Roadworks Both Directions Affected roads include Sandgate Road Northumbria Road and Garozzo Street intersection and Sandgate Road service road Boondall. Commencing: 01 September 2014, at 7:00pm Concluding:26 September 2014, at 6:00am Partial lane closures No delays expected. Reduced speed limit (40km/h). The Department of Transport and Main Roads (TMR) will be undertaking safety improvement works on the Northumbria Road, Garozzo Street and Sandgate Road intersection in Boondall. Works will be carried out from 1st September until 26 September 2014 between 7:00pm to 5:00am, weather and construction conditions permitting. For safety and traffic management reasons night works will be carried out Monday to Friday. Changed conditions including reduced speed limits, lane closures and some construction noise can be expected during the works. Traffic control will be in place to ensure safety of road workers and motorists. This safety project involves: • improving pedestrian facilities and installing new pedestrian ramps • changing the Sandgate Road service road exit to a ‘left-out only’ arrangement (meaning no right hand turn for vehicles exiting this street) • line marking and electrical works • replacement of the existing median between Sandgate Road and the service road • replacing existing asbestos pits with asbestos-free cement pits After the project is finished, motorists exiting the Sandgate Road service road will be able to U-Turn at the Leeson Street roundabout, less than 100m east of the intersection. TMR appreciates your patience while these important works are being carried out. If you require further information on this project, please contact the Project Team on 3066 9135 or by email metropolitanregion@tmr.qld.gov.au during business hours. Alternatively, please contact the TMR on 13QGOV (13 74 68) during business hours. For up-to-date information on road closures and traffic conditions across Queensland, please visit www.131940.qld.gov.au or call 13 19 40 at any time Last edited: 25 Aug 2014 15:30
Last report received from DTMR: 2014-08-27T19:50:25
BEAUDESERT ROAD OFF RAMP, DREWVALE, 4116 - Planned Roadworks Westbound Logan Motorway westbound offramp to Mt Lindesay Highway southbound closed. Commencing: 29 August 2014, at 7:00pm Concluding:30 August 2014, at 5:00am Road closed single direction No delays expected. Use alternative route. Last edited: 25 Aug 2014 11:55
Last report received from DTMR: 2014-08-27T19:50:25
PACIFIC MOTORWAY, MACGREGOR, 4109 - Planned Roadworks All directions Commencing: 25 August 2014, at 6:11pm Concluding:07 November 2014, at 4:00am All lanes affected Delays expected. Traffic control on scene. Intersection improvement works at Pacific Mwy Southbound Off-Ramp/ Logan Road / Holmead Read The Department of Transport and Main Roads (TMR) will carry out works to provide an additional stand up lane at the intersection with Logan Rd/Holmead Rd. Intersection configuration works will allow the off-ramp right-turn movement to run concurrently with Holmead Road right-turn, therefore gaining additional green time without affecting the signal operations on Logan Road. Works are scheduled to start from Monday 18 August 2014 until 7 November 2014 between 6.30pm and 4am, and 6am - 3pm, weather and construction conditions permitting. TMR apologises for any inconvenience these works may cause and appreciates your patience while these important works are being carried out. Please slow down – roadwork safety is your responsibility too. #185 Last edited: 25 Aug 2014 23:34
Last report received from DTMR: 2014-08-27T19:50:25
CLEM7, BOWEN HILLS, 4006 - Planned Roadworks Southbound Clem7 southbound tunnel closed. Commencing: 24 August 2014, at 10:00pm Concluding:28 August 2014, at 5:00am Road closed single direction No delays expected. Use alternative route. Last edited: 11 Aug 2014 11:15
Last report received from DTMR: 2014-08-27T19:50:25
PACIFIC MOTORWAY, EIGHT MILE PLAINS, 4113 - Planned Roadworks All directions Logan Road exit and Holmead Road . Commencing: 18 August 2014, at 6:30pm Concluding:07 November 2014, at 4:00am All lanes affected Delays expected. Traffic control on scene. Intersection improvement works at Pacific Mwy Southbound Off-Ramp/Logan Road / Holmead Road. The Department of Transport and Main Roads (TMR) will carry out works to provide an additional stand up lane at the intersection with Logan Rd / Holmead Rd. Intersection configuration works will allow the off ramp right turn movement to run concurrently with Holmead Road right turn, therefore gaining additional green time without affecting the signal operations on Logan Road. Works are scheduled to start from Monday 18 August 2014 until 7 November 2014 between 6:30pm and 4am, and 6am-3pm, weather and construction conditions permitting. TMR apologises for any inconvenience these works may cause and appreciates your patience while these important works are being carried out. Please slow down- roadwork safety is your responsibility too. Last edited: 11 Aug 2014 20:05
Last report received from DTMR: 2014-08-27T19:50:25
WARREGO HIGHWAY, GATTON, 4343 - Planned Roadworks Both Directions Between Smithfield Road, Gatton and Philps Road, Ringwood. Commencing: 11 August 2014, 24 hours a day 7days a week. Concluding: 28 September 2014, weather permitting. All lanes affected No delays expected. Changed traffic conditions. On Site 24hrs a day 7 days a week: EASTBOUND Both Lanes Closed. WESTBOUND Single lane both directions, Reduced Speed Limit 60km/hr, Proceed with caution and please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 11 Aug 2014 12:10
Last report received from DTMR: 2014-08-27T19:50:25
FINUCANE ROAD, ALEXANDRA HILLS, 4161 - Planned Roadworks Westbound Commencing: 05 August 2014, at 8:00pm Concluding:22 September 2014, at 6:00am No delays expected. Proceed with caution. The Department of Transport and Main Roads (TMR) is carrying out important Cycling Safety Improvement works on the Finucane Road service roads (westbound) at Alexandra Hills. Work locations include: - The Finucane Road service road entry way - Westbound on Finucane Road between the intersections of Finucane Road/McDonald Road and Allenby Road/Vienna Road/Finucane Road. - The Finucane Road service road entry way - Westbound on Finucane Road between the intersections of Allenby Road/Vienna Road/Finucane Road and Finucane Road/Elizabeth Drive. This upgrade will increase the safety at this location for cyclists through improved facilities. Work will include: - widening 20 metres of existing pavement just before the entrances to the Finucane Road service roads - installing and relocating cycling signage - replacing existing grates with cycle-friendly grates - minor asphalt resurfacing This project is funded under the $82 million Safer Roads Sooner initiative and part of the $350 million Road Safety Action Plan to improve safety on our roads and drive down the road toll. Works will be carried out from 5 August 2014 to late August 2014 between 8pm and 5am. TMR appreciates your patience while these important works are being carried out. #175 Last edited: 05 Aug 2014 23:49
Last report received from DTMR: 2014-08-27T19:50:25
GATEWAY MOTORWAY, DEAGON, 4017 - Planned Roadworks Both Directions Northbound and southbound lanes of the Gateway Motorway at Deagon will be affected between the Sandgate Road overpass and Barrett Street . Commencing: 04 August 2014, at 8:00pm Concluding:01 September 2014, at 5:00am Delays expected. Changed traffic conditions. From Monday 4 August for approximately four weeks final overlay works, including asphalt paving, temporary barrier movements, crash barreir installation and linemarking, will take place at night on the northbound and southbound lanes of the Gateway Motorway at Deagon. Between 8pm and 5am changed traffic conditions will be in place including reduced speed, single lane closures, and stop go traffic control. Please take care and follow the directions of traffic controllers and roadside signage. Delays may be experienced. Two lanes of traffic will be maintained in each direction on the motorway during daytime hours. For more information, contact the Gateway Additional Lane project, phone 1800 897 778. #178 Last edited: 05 Aug 2014 23:14
Last report received from DTMR: 2014-08-27T19:50:25
LOGAN ROAD, EIGHT MILE PLAINS, 4113 - Planned Roadworks Both Directions Intersection improvement works at Miles Platting, Padstow and Logan roads . Commencing: 04 August 2014, at 7:00pm Concluding:30 December 2014, at 5:00am Lane or lanes reduced Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) will carry out works to improve the right turn from Logan Road into Padstow Road in Eight Mile Plains. Intersection works will ease congestion at the intersection, improve accessibility to Garden City Office Park and provide on road cycle access along Logan Road (southbound) between Pacific Motorway and the intersection. Works are scheduled to start from Monday 4 August 2014 until Decmber 2014 between 7pm and 5am, weather and construction conditions permitting. Some nightworks will be required for this project occurring between 7pm and 5am Monday to Saturday, when necessary. TMR apologises for any inconvenience these works may cause and appreciates your patience while these important works are being carried out. Please slow down – roadwork safety is your responsibility too. #177 Last edited: 05 Aug 2014 23:16
Last report received from DTMR: 2014-08-27T19:50:25
GATTON HELIDON ROAD, LOWER TENTHILL, 4343 - Planned Roadworks Both Directions Between Intersection Warrego Highway, Gatton Eastern End to Turner Road, Helidon. Commencing: 04 August 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: 31 October 2014, weather permitting Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Traffic control with possible delays of up to 5 minutes. On Site During NON working hours: Reduced speed limit 40km/h, portable traffic signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 09 Jul 2014 12:56
Last report received from DTMR: 2014-08-27T19:50:25
MOGGILL ROAD, INDOOROOPILLY, 4068 - Planned Roadworks Moggill Road, Indooroopilly at Western Freeway interchange Western Freeway southbound on-ramp Western Freeway southbound off-ramp . Commencing: 01 August 2014, at 2:30pm Concluding:31 August 2014, at 11:59pm No delays expected. Proceed with caution. The Department of Transport and Main Roads will be undertaking investigative works for the Moggill Road cycle bridge starting 1 August 2014. Works will be carried out from Friday 1 August 2014, generally between 7am to 5pm, weather and construction conditions permitting. Works will occur Monday to Friday, with some night works and lane closures required to allow investigations in the road. Traffic control will be in place during these closures. The Department of Transport and Main Roads apologises for any inconvenience these works may cause and appreciates your patience while these important works are being carried out. # 176 Last edited: 05 Aug 2014 23:24
Last report received from DTMR: 2014-08-27T19:50:25
GATTON ESK ROAD, LAKE CLARENDON, 4343 - Planned Roadworks Both Directions Between the intersection with Warrego Highway to Carbine Road. Commencing: 28 July 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: 20 December 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Traffic control with possible delays of up to 5 minutes. On Site During NON working hours: Reduced speed limit 40km/h, portable traffic signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 09 Jul 2014 12:49
Last report received from DTMR: 2014-08-27T19:50:25
MULGOWIE ROAD, MULGOWIE, 4341 - Planned Roadworks Both Directions Just south of the intersection with Beckman Road. Commencing: 21 July 2014, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 22 September 2014, weather permitting. Delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Traffic Control with possible delays of up to 5 minutes. On Site During NON working hours: Returned to normal traffic conditions. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 25 Jul 2014 15:19
Last report received from DTMR: 2014-08-27T19:50:25
JUNCTION ROAD, CLAYFIELD, 4011 - Planned Roadworks Commencing: 23 July, at 7:00pm Concluding:29 August, at 5:00am Short delays expected. Allow extra travel time. The Department of Transport and Main Roads will be undertaking footpath improvement works at the Junction Road and Morrison Road intersection, Clayfield Works will be carried out from Monday to Friday from the 23 July 2014 until 29 August 2014 between 7:00pm to 5:00am, weather and construction conditions permitting. The works are due to the increase in pedestrian traffic at this location. The safety improvements will widen the footpath and increase the space at this location for pedestrians to prevent overcrowding. TMR appreciates your patience while these important works are being carried out. #164 Last edited: 09 Jul 2014 13:06
Last report received from DTMR: 2014-08-27T19:50:25
WARREGO HIGHWAY, GATTON, 4343 - Planned Roadworks Both Directions Between approximately Gatton College Road Exit to Adare Road. Commencing: 25 August 2014, 24 hours a day 7 days a week. Concluding: 30 November 2014, weather permitting. All lanes affected Delays expected. Changed traffic conditions. On Site during working hours: Westbound carriageway closed. Two way traffic on the eastbound carriageway (contraflow). Reduced Speed Limit 40km/h, Traffic control (on site 24 hours) with possible delays of up to 5 minutes. On Site During NON working hours: Westbound carriageway closed. Two way traffic on the eastbound carriageway (contraflow). Reduced Speed Limit 60km/h, Traffic control (on site 24 hours) with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 25 Aug 2014 12:54
Last report received from DTMR: 2014-08-27T19:50:25
SETTLEMENT ROAD, KEPERRA, 4054 - Planned Roadworks Outbound Intersection of Samford Road and Settlement Road Keparra. Commencing: 21 July 2014, at 11:45pm Concluding:29 August 2014, at 6:00am No delays expected. Changed traffic conditions. Safety improvement works at the Settlement Road and Samford Road intersection from 21 July to 29 August 2014. Works will be carried out from 8:00pm to 5:00am Monday to Thursday. Changed traffic conditions and reduced speed limit for motorists around the intersection. #169/179 Last edited: 06 Aug 2014 00:05
Last report received from DTMR: 2014-08-27T19:50:25
GATEWAY MOTORWAY, DEAGON, 4017 - Planned Roadworks All directions North and South bound lanes of the Gateway Motorway between Sandgate Road, Bracken Ridge and the Deagon Deviation, Deagon including bridges at Cabbage Tree Creek.. Commencing: 17 July, at 5:00pm Concluding:30 September, at 5:00am Short delays expected. Changed traffic conditions. From July to September 2014 there will be some night works activity with intermittent minor delays expected on the Gateway Motorway at Cabbage Tree Creek, Deagon to allow bridge construction. When required night works will take place between 8pm and 5am. Two lanes of traffic will be maintained in each direction on the motorway during datime hours. For more information, contact the Gateway Additional Lane project, phone 1800 897 778. #168 Last edited: 17 Jul 2014 16:40
Last report received from DTMR: 2014-08-27T19:50:25
GATEWAY MOTORWAY, NUDGEE, 4014 - Planned Roadworks Both Directions And Sandgate Road, Boondall.. Commencing: 30 June, at 6:29pm Concluding:31 August, at 5:00am Short delays expected. Changed traffic conditions. Routine maintenance works beside the Gateway Motorway between Nudgee (near the Nudgee Service Centre) and Sandgate Road, Boondall will require intermittent single lane closures to provide a safe location for equipment and work crews. Single lane closures and reduced speed limits may apply. Motorists may experience some minor delays. Work is expected to be completed by 31 August 2014. For more information phone Transport and Main Roads on PH 1800 288 355. #161 Last edited: 02 Jul 2014 04:46
Last report received from DTMR: 2014-08-27T19:50:25
PACIFIC MOTORWAY, BRISBANE CITY, 4000 - Planned Roadworks Both Directions Captain Cook Bridge and Riverside Expressway including the on and off ramps, . Commencing: 29 June, at 8:30pm Concluding:11 October, at 5:00am Short delays expected. Changed traffic conditions. The Department of Transport and Main Roads will be undertaking aesthetic maintenance works on the Captain Cook Bridge and Riverside Expressway including their on and off-ramps. Overnight works will be carried out from Sunday 29 June to Friday 10 October 2014 from 8.30pm to 5am, weather and construction conditions permitting. During the works, traffic delays, lane closures, moderate construction noise and reduced speed limits can be expected. Traffic control will be in place to ensure the safety of road workers and motorists. Your patience and cooperation is appreciated while these works are underway #159 Last edited: 28 Jun 2014 07:03
Last report received from DTMR: 2014-08-27T19:50:25
WARREGO HIGHWAY, CROWLEY VALE, 4342 - Planned Roadworks Both Directions Between approximately intersection with Forest Hill Fernvale Road and Harm Drive. Commencing: 11 June 2014, 24 hours a day 7 days a week. Concluding: 31 August 2014, weather permiting. Short delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 60km/h, Westbound traffic will be diverted over to the Eastbound side of the highway, reducing highway to a single lane both directions. Traffic control on scene with possible delays of up to 5 minutes. Please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 12 Jun 2014 10:50
Last report received from DTMR: 2014-08-27T19:50:25
ROSEWOOD MARBURG ROAD, MARBURG, 4346 - Planned Roadworks Both Directions Commencing: 31 May, at 6:00am Concluding:24 September, at 6:00pm Short delays expected. Allow extra travel time. Reconstruction works will be carried out periodically along three sections of Rosewood-Marburg Road. Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. Lane closures with traffic control will be in place. While every effort will be made to minimize the impacts, motorists may experience delays of five minutes and should factor in additional travel time to their journey. Please Note: Any vehicle over 3.5 must provide 48 hrs notice to ensure arrangements can be made for safe access. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au #140 Last edited: 23 Jun 2014 12:21
Last report received from DTMR: 2014-08-27T19:50:25
IPSWICH BOONAH ROAD, YAMANTO, 4305 - Planned Roadworks Both Directions Stop and go traffic arragement, single lane closure and reduced speed limit.. Commencing: 28 May, at 6:00am Concluding:24 September, at 6:00pm Short delays expected. Allow extra travel time. Reconstruction works will be carried out periodically along six sections of Ipswich-Boonah Road. Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. Lane closures with traffic control will be in place. While every effort will be made to minimize the impacts, motorists may experience delays of five minutes and should factor in additional travel time to their journey. Please Note: Any vehicle over 3.5 must provide 48 hrs notice to ensure arrangements can be made for safe access. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au #139 Last edited: 26 May 2014 11:58
Last report received from DTMR: 2014-08-27T19:50:25
KARRABIN ROSEWOOD ROAD, ROSEWOOD, 4340 - Planned Roadworks Both Directions Commencing: 28 May 2014, at 6:00am Concluding:24 September 2014, at 6:00pm Delays expected. Allow extra travel time. Reconstruction works will be carried out periodically along four sections of Karrabin-Rosewood Road. Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. Lane closures with traffic control will be in place. While every effort will be made to minimise the impacts, motorists may experience delays of five minutes and should factor in additional travel time to their journey. Please note: Any vehicle over 3.5m must provide 48hrs notice to ensure arrangements can be made for safe access. For more information please contact the project team on 1800 063 397 or email reconstruct_metroploitan@tmr.qld.gov.au #136 Last edited: 05 Aug 2014 23:57
Last report received from DTMR: 2014-08-27T19:50:25
ROSEWOOD LAIDLEY ROAD, GRANDCHESTER, 4340 - Planned Roadworks Both Directions Stop-and-go traffic arrangement, single lane closure and reduced speed limit. Commencing: 28 May, at 6:00am Concluding:24 September, at 6:00pm Short delays expected. Allow extra travel time. Reconstruction works will be carried out periodically along nine sections of Rosewood-Laidley Road. Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. Lane closures with traffic control will be in place. While every effort will be made to minimise the impacts, motorists may experience delays of five minutes and should factor in additional travel time to their journey. Please note: Any vehicle over 3.5m must provide 48hrs notice to ensure arrangements can be made for safe access. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au #137 Last edited: 26 May 2014 11:24
Last report received from DTMR: 2014-08-27T19:50:25
IPSWICH ROSEWOOD ROAD, JEEBROPILLY, 4340 - Planned Roadworks Both Directions Stop-and-go traffic arrangement, single lane closure and reduced speed limit.. Commencing: 28 May, at 6:00am Concluding:24 September, at 6:00pm Short delays expected. Allow extra travel time. Reconstruction works will be carried out periodically along four sections of Ipswich-Rosewood Road. Works will generally be undertaken during the day, from 6am to 6pm Monday to Saturday. Lane closures with traffic control will be in place. While every effort will be made to minimise the impacts, motorists may experience delays of five minutes and should factor in additional travel time to their journey. Please note: Any vehicle over 3.5m must provide 48hrs notice to ensure arrangements can be made for safe access. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au #138 Last edited: 26 May 2014 11:19
Last report received from DTMR: 2014-08-27T19:50:25
HAIGSLEA AMBERLEY ROAD, WALLOON, 4306 - Planned Roadworks Both Directions Stop-and-go traffic arrangement, single lane closure and reduced speed limit.. Commencing: 28 May, at 6:00am Concluding:24 September, at 6:00pm Short delays expected. Allow extra travel time. Reconstruction works will be carried out periodically along two sections of Haigslea-Amberley Road. Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. Lane closures with traffic control will be in place. While every effort will be made to minimise the impacts, motorists may experience delays of five minutes and should factor in additional travel time to their journey. Please note: Any vehicle over 3.5m must provide 48hrs notice to ensure arrangements can be made for safe access. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au # 141 Last edited: 26 May 2014 12:05
Last report received from DTMR: 2014-08-27T19:50:25
ROSEWOOD WARRILL VIEW ROAD, ROSEWOOD, 4340 - Planned Roadworks Both Directions Commencing: 28 May, at 6:00am Concluding:24 September, at 6:00pm Short delays expected. Allow extra travel time. Reconstruction works will be carried out periodically along seven sections of Rosewood-Warrill View Road. Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. Lane closures with traffic control will be in place. While every effort will be made to minimize the impacts, motorists may experience delays of five minutes and should factor in additional travel time to their journey. Please Note: Any vehicle over 3.5 must provide 48 hrs notice to ensure arrangements can be made for safe access. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld.gov.au #142 Last edited: 26 May 2014 12:45
Last report received from DTMR: 2014-08-27T19:50:25
WARREGO HIGHWAY, MARBURG, 4346 - Planned Roadworks Westbound Westbound at Two Tree Hill Road. Commencing: 23 May, at 6:00am Concluding:31 August, at 6:00pm Short delays expected. Allow extra travel time. Flood reconstruction works to repair the embankment slips along the Warrego Highway on the Marburg Range began in May. Works will generally be undertaken during the day, from 6am to 6pm, Monday to Saturday. Single lane closures and reduced speed limits will be in place for the duration of the works. While every effort will be made to minimize the impacts , motorists may experience delays of five minutes and should factor in additional travel time to their journey. For more information please contact the project team on 1800 063 397 or email reconstruct_metropolitan@tmr.qld .gov.au #130 Last edited: 23 May 2014 22:59
Last report received from DTMR: 2014-08-27T19:50:25
MOUNT GRAVATT CAPALABA ROAD, WISHART, 4122 - Planned Roadworks Both Directions Mt Gravatt Capalaba Road, Wishart, between Broadwater and Gardner/Mt Petrie Roads. Gateway Motorway on and off ramps, Mackenzie. Commencing: 12 May 2014, at 1:00pm Concluding:31 December 2015, at 5:00am Partial lane closures Delays expected. Changed traffic conditions. Motorists are advised that construction of Gateway Upgrade South Stage 2a (Mt Gravatt Capalaba Road) commenced in April 2014 and will continue through to late 2015, weather and construction conditions permitting. The Australian Government and Queensland Government are jointly funding the upgrade of Mt Gravatt-Capalaba Road (Broadwater to Gardner Road) as part of the second stage of Gateway Upgrade South projects. Bridge duplication works and general road construction activities will be carried out Monday to Saturday between 7am and 5pm. Nightworks and temporary lane closures, on Mount Gravatt-Capalaba Road, Wishart and Gateway Motorway on and off-ramps, Mackenzie will be required 8pm to 5am up to 5 nights per week and may also occur off-peak during the day. Traffic management including reduced speed limits, traffic controllers and devices will be in place to guide motorists where required. During construction, minor traffic delays and some noise, dust and vibration may be experienced. The project team will endeavour to minimise impacts where possible. Please slow down – roadwork safety is your responsibility too. For further information contact the project team on 1800 799 686. A map and further details of this project can be found at www.tmr.qld.gov.au/gatewayupgradesouth. #128 Last edited: 05 Aug 2014 22:44
Last report received from DTMR: 2014-08-27T19:50:25
CENTENARY HIGHWAY, SINNAMON PARK, 4073 - Planned Roadworks Both Directions Between Sumners Road and the Brisbane River. Commencing: 29 April 7:00am Concluding:26 February 2015, at 5:00pm Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to advise of upcoming works on the Centenary Motorway inbound and outbound between Sumners Road and the Brisbane River to install electronic variable speed limit signs and undertake ancilliary works. Works will be carried out from Tuesday 29 April 2014 until Thrusday 26 February 2015 between 7am to 5pm and 8pm to 5am, weather and construction conditions permitting. The variable speed limit signs will improve recurrent congestion and vehicle incident issues along this section of the Centenary Motorway, but reducing vehicle speeds as they approach and pass stationary or slow moving vehicles on the motorway. The Department of Transport and Main Roads apologises for any inconvenience these works may cause and appreciates your patience while these important works are being carried out. #113 Last edited: 05 Aug 2014 23:09
Last report received from DTMR: 2014-08-27T19:50:25
MOGGILL ROAD, INDOOROOPILLY, 4068 - Planned Roadworks Both Directions Commencing: 22 April 2014, at 9:00pm Concluding:31 March 2015, at 12:00am No delays expected. Proceed with caution. Planned roadworks for the Moggill Road and Western Freeway interchange upgrade. Commencing: Early 2013 Concluding: Early 2015 Sort delays expected, please observe signage. Construction of the upgrade started in early 2013 and will take approximately two years to complete. Work will be carried out between 6:30am to 6:30pm, Monday to Saturday. Some activities are also required to be undertaken at night between 8pm and 5am on the inbound and outbound lanes of both the Western Freeway and Moggill Road Indooroopilly. The upgrade is required as part of the Queensland Coordinator General's approval of Brisbane City Council's Legacy Way project. The upgrade is required to cater for the changed traffic patterns at the interchange when Legacy Way opens in 2015. Work will include lengthening and eidening the Western Freeway's on and off-ramps, as well as adding extra turn lanes on to and off the Freeway at Moggill Road. Minor traffic delays, lanes closures and reduced speed limits will apply through the work area. For more information please contact Transcity on 1800 778 772 or www.legacywway.com.au #111 Last edited: 05 Aug 2014 23:44
Last report received from DTMR: 2014-08-27T19:50:25
WESTERN FREEWAY, INDOOROOPILLY, 4068 - Planned Roadworks Both Directions Commencing: 22 April 2014, at 9:00pm Concluding:31 March 2015, at 12:00am No delays expected. Changed traffic conditions. Planned road works in both direction for the Western Freeway upgrade between Indooroopilly and Toowong. Commencing: Early 2014 Concluding: Early 2015 Short delays expected, please observe signage. The Department of Transport and Main Roads (TMR) is upgrading the Western Freeway between Indooroopilly and Toowong. The upgrade involves widening the Western Freeway from two to three lanes in each direction. Standard works hours for the project are 6:30am to 6:30pm, Monday to Saturday. Some activities are also required to be undertaken at night between 8pm and 5am on the inbound and outbound lanes of the Western Freeway. Minor traffic delays, lane closures and reduced speed limits will apply through the work area. For further information, please call 1800 778 772 #112 Last edited: 05 Aug 2014 23:34
Last report received from DTMR: 2014-08-27T19:50:25
WESTERN FREEWAY, TOOWONG, 4066 - Planned Roadworks Both Directions Commencing: 22 April 2014, at 8:00pm Concluding:31 March 2015, at 12:00am No delays expected. Proceed with caution. Planned road works in both directions for Legacy Way construction at Toowong. Commencing: Early 2011 Concluding: 2015 Short delays expected, please observe signage. Transcity started construction of Legacy Way's western work site in Toowong in early 2011. The western work site is located near the corner of the Western Freeway and Mt Coot-tha Road, Toowong. Work will be carried out between 6:30am to 6:30pm, Monday to Saturday. Some activities are also required to be undertaken at night between 8pm and 5am on the inbound and outbound lanes of the Western Freeway at Toowong. Minor traffic delays, lane closures and reduced speed limits will apply through the work area. Legacy Way is Brisbane City Council's 4.6km road tunnel that will connect the Western Freeway at Toowong with the Inner City Bypass at Kelvin Grove. Once open in 2015, Legacy Way will almost halve peak hour travel times between the Centenary Bridge and the ICB. For more information please contact Transcity on 1800 778 772 or www.legacyway.com.au #110 Last edited: 05 Aug 2014 23:40
Last report received from DTMR: 2014-08-27T19:50:25
CREEK ROAD, CARINDALE, 4152 - Planned Roadworks Both Directions Between Old Cleveland Road to Winstanley Street and Millenium Boulevard Carindale to Creek Road to Bedivere Street . Commencing: 21 March, at 6:00am Concluding:15 November, at 6:00pm Short delays expected. Use alternative route. Brisbane City Council- Field Services Group will be replacing the northbound road bridge. Northbound traffic will travel via a contra flow closure over the median island onto the southern road and continue north in the median lane and return to the northern roadway after the bridge working area. Southbound traffic will be reduced to two lanes. Closures will be continuous from 6am Friday 21st March through to 6pm Saturday 15th November. Motorists are advised to avoid this section of Creek Rd and seek alternate routes in this area. For more information please contact Sarah Gladstone from City Projects Office on 07-3403 8888 Last edited: 18 Mar 2014 11:21
Last report received from DTMR: 2014-08-27T19:50:25
South Coast
Roadworks
LOGAN MOTORWAY ON RAMP, BERRINBA, 4117 - Planned Roadworks Westbound Wembley Road onramp to the Logan Motorway westbound closed. Commencing: 28 August 2014, at 7:00pm Concluding:29 August 2014, at 5:00am Single lane in operation Delays expected. Use alternative route. Last edited: 25 Aug 2014 11:48
Last report received from DTMR: 2014-08-27T19:50:25
TAMBORINE MOUNTAIN ROAD, TAMBORINE MOUNTAIN, 4272 - Planned Roadworks Both Directions The Goat Track. Commencing: 27 August 5:25pm Concluding:28 August 2014, at 10:00am Partial lane closures Delays expected. Allow extra travel time. Emergency repairs Last edited: 27 Aug 2014 17:26
Last report received from DTMR: 2014-08-27T19:50:25
WEMBLEY ROAD OFF RAMP, BERRINBA, 4117 - Planned Roadworks Westbound Logan Motorway westbound offramp to Wembley Road, Berrinba closed. Commencing: 27 August 2014, at 7:00pm Concluding:28 August 2014, at 5:00am Road closed single direction Delays expected. Use alternative route. Last edited: 25 Aug 2014 11:49
Last report received from DTMR: 2014-08-27T19:50:25
PACIFIC HIGHWAY, WORONGARY, 4213 - Planned Roadworks Both Directions Construction on the Pacific Motorway (M1) between Worongary (Exit 77) and Robina (Exit 82) is continuing. Nightworks on Wednesday 27 August 2014 with single lane closures and speed restrictions. Commencing: Worongary to Mudgeeraba: March 2013 Mudgeeraba to Robina: March 2014 Concluding:Worongary to off-ramp Exit 79 at Mudgeeraba: September 2014 Mudgeeraba to Robina: Early 2015 Partial lane closures Unknown traffic impact. Changed traffic conditions. During nightworks motorists can expect single lane closures in both directions (northbound 7pm to 4.30am, southbound 8pm to 5am) and a reduced speed limit of 40km/h through the work site. Please drive with care as alignment of the southbound lanes has changed. ADVANCE NOTICE: Weekend ramp closure Exit 79 southbound off-ramp from 8pm Friday 5 September to 5am Monday 8 September 2014. Please use alternative motorway exits at Woronary (Exit 77) or Robina (Exit 82). Last edited: 27 Aug 2014 18:12
Last report received from DTMR: 2014-08-27T19:50:25
OAKY CREEK ROAD, INNISPLAIN, 4285 - Planned Roadworks All directions Flood damage repairs site has temporary traffic lights and reduce speed on site delays of up to 15 minutes. Commencing: 26 August 2014, at 7:23am Concluding:29 August 2014, at 5:30pm Lane or lanes reduced Delays expected. Observe signage. Last edited: 26 Aug 2014 07:33
Last report received from DTMR: 2014-08-27T19:50:25
CAMP CABLE ROAD, JIMBOOMBA, 4280 - Planned Roadworks Both Directions Between Abell Road and Meadow Road. Commencing: 13 August 2014, at 6:30am Concluding:30 September 2014, at 5:00pm Limited to one lane Delays expected. Allow extra travel time. Road repair works are occurring 6.30am to 5pm Monday to Friday and Saturdays, when required. Traffic will be single lane with traffic control directing motorists one way at a time. These traffic conditions will remain in place overnight and on weekends until complete. Last edited: 21 Aug 2014 12:33
Last report received from DTMR: 2014-08-27T19:50:25
BEENLEIGH REDLAND BAY ROAD, CARBROOK, 4130 - Planned Roadworks Both Directions Between Ferry Road and Serpentine Creek. Commencing: 11 August 7:00am Concluding:19 September 2014, at 8:00pm All lanes affected Delays expected. Proceed with caution. Road resurfacing works Last edited: 08 Aug 2014 12:33
Last report received from DTMR: 2014-08-27T19:50:25
SMITH STREET, SOUTHPORT, 4215 - Planned Roadworks All directions Westbound offramp Smith Street Motorway to Olsen Ave closed until March 2015. Olsen Avenue northbound from Crestwood to Wintergreen reduced to one lane until late 2014. Commencing: 04 August 6:00am Concluding:20 December 2015, at 4:00pm Long delays expected. Allow extra travel time. Check out TMR's web page for further details on this project http://tinyurl.com/mx6xuog Call 1800 600 163 to register for free SMS text messages or email traffic alerts when traffic conditions change on this project Last edited: 01 Aug 2014 11:48
Last report received from DTMR: 2014-08-27T19:50:25
HINDE ROAD, GILSTON, 4211 - Planned Roadworks Both Directions Emergency roadworks continue today to repair a sink hole. Commencing: 01 August 2014, at 8:50am Concluding:01 August 2014, at 5:00pm Delays expected. Use alternative route. Last edited: 01 Aug 2014 08:51
Last report received from DTMR: 2014-08-27T19:50:25
NERANG MURWILLUMBAH ROAD, NATURAL BRIDGE, 4211 - Planned Roadworks Both Directions Past Bakers Road. Commencing: 21 July 2014, at 6:00am Concluding:30 September 2014, at 6:00pm Short delays expected. Allow extra travel time. Two landslip repairs are underway. A side-track has been constructed around one of the work zones with traffic being directed one way at a time via mobile traffic signals. Last edited: 25 Jul 2014 08:29
Last report received from DTMR: 2014-08-27T19:50:25
BRISBANE ROAD, BIGGERA WATERS, 4216 - Planned Roadworks Eastbound Between Arundel Drive and Oxley Drive. Day works from 9am to 3pm, night works from 7pm to 4am. Commencing: 07 July 9:00am Concluding:30 September, at 5:00am Short delays expected. Proceed with caution. Last edited: 04 Jul 2014 11:56
Last report received from DTMR: 2014-08-27T19:50:25
WORONGARY ROAD, WORONGARY, 4213 - Planned Roadworks Both Directions At Worongary Creek Floodway. Commencing: 30 June 2014 Concluding:late 2014 Delays expected. Allow extra travel time. Stop/go conditions will be in place until late 2014. The existing culverts at the Worongary Creek Floodway will be replaced with higher culverts. This project also includes a minor road realingment between Harry Mills Drive and The Panorama. Last edited: 31 Jul 2014 17:27
Last report received from DTMR: 2014-08-27T19:50:25
WATERFORD TAMBORINE ROAD, LOGAN VILLAGE, 4207 - Planned Roadworks Both Directions (between Quinzeh Creek Road and Stegemann Road). Commencing: 16 June 2014, at 6:30am Concluding:30 September 2014, at 5:00pm Single lane in operation Long delays expected. Allow extra travel time. Road repair works to repair flood damage on Waterford-Tamborine Road. Single lane closure is in place directing traffic one way at a time. Work hours are Monday to Friday from 6.30am to 5pm and when required, Saturdays from 6.30am to 5pm. Please note, this lane closure will remain in place overnight and on weekends until the works are complete. Delays of 10-15 minutes should be expected. Intermittently, delays will be up to 30 minutes. Last edited: 21 Aug 2014 12:42
Last report received from DTMR: 2014-08-27T19:50:25
North Coast
Road Closures/Load Limits
KENILWORTH BROOLOO ROAD, KENILWORTH, 4574 - Due to recent weather, Kenilworth-Brooloo Road remains closed to through traffic at the roadwork site north of Bluff Road, weather permitting. Further updates will be provided as conditions improve. Closed to all vehicles Proceed with caution. Medium sized slip below road. Road reconstruction work Diversions via Eumundi Kenilworth Road Tuchekoi Road Last edited: 25 Aug 2014 11:50 Next Update: 30 Sep 2014
Last report received from DTMR: 2014-08-27T19:50:25
KIN KIN ROAD, KIN KIN, 4571 - Open (with caution) Proceed with caution. Temporary traffic signals in place between Main Street Kin Kin and Murrays Road Kin Kin Last edited: 06 Aug 2014 12:01 Next Update: 27 Aug 2014
Last report received from DTMR: 2014-08-27T19:50:25
KIN KIN ROAD, KIN KIN, 4571 - Open (with caution) Proceed with caution. Kin Kin Road, Kin Kin. One lane closed near Turnbull Road near top of range. Temporary traffic signals are in place. Reduced speed limit. Short delays expected. Observe signage. Reconstruction works to started in 2014 Last edited: 06 Aug 2014 12:00 Next Update: 27 Aug 2014
Last report received from DTMR: 2014-08-27T19:50:25
MOUNTAIN VIEW DRIVE, MINDEN, - Closed to through traffic observe signage. Last edited: 05 Aug 2014 Next update:09 Sep 2014
Last report received from DTMR: 2014-08-27T19:50:25
OBI OBI ROAD, OBI OBI, 4574 - Subject to a 10 tonne GVM limit Observe signage. Obi Obi Road, Obi Obi – The downhill section of Obi Obi Road westbound between Mapleton and Kenilworth is open to traffic. Last edited: 01 Aug 2014 13:44 Next Update: 01 Sept 2014
Last report received from DTMR: 2014-08-27T19:50:25
ESK HAMPTON ROAD, ESK, 4312 - Open (with caution) Observe signage. Last edited: 09 Jul 2014 13:41
Last report received from DTMR: 2014-08-27T19:50:25
MAHON ROAD, COOMINYA, - Closed to all vehicles use alternative route. Last edited: 26 Jun 2014 Next update:18 Sep 2014
Last report received from DTMR: 2014-08-27T19:50:25
Special
ALEXANDRA PARADE, ALEXANDRA HEADLAND, 4572 - Special Event All directions Alexandra Parade, Bradman Avenue and Duporth Avenue. . Commencing: 31 August 2014, at 4:00am Concluding:31 August 2014, at 1:00pm Road closed single direction Delays expected. Diversions are in place. Due to the Sunshine Coast Marathon, the following roads will be affected: Bradman Avenue - Full closure between Yinni Street and O'Connor Street. 5:00am to 8:45am. Duporth Avenue - Southbound Closure between O'Connor Street to Duporth Avenue. 8:45am to 11:30am. Alexandra Parade - Southbound Closure between Sixth Avenue to Mooloolaba Road. 4:00am to 1:00pm. For further event information. Contact the Sunshine Coast Marathon Hotline on: 5351 1826 Last edited: 27 Aug 2014 14:11
Last report received from DTMR: 2014-08-27T19:50:25
Roadworks
KAWANA WAY, PARREARRA, 4575 - Planned Roadworks Both Directions Asphalt resurfacing works will be undertaken on Kawana Way from the Sunshine Motorway to Kawana Island Boulevard . Commencing: 31 August 2014, at 6:00pm Concluding:30 November 2014, at 6:00am Delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) advises that asphalt resurfacing works will be undertaken on Kawana Way from the Sunshine Motorway to Kawana Island Boulevard from 31 August to November 2014, weather permitting. The works will involve replacing the existing asphalt surface with a new high-quality asphalt surface. This new surface will provide a safer, smoother surface for road users and reduce future maintenance costs. To minimise traffic disruptions, works will generally be carried out from 6pm to 6am, Sunday to Thursday. For the safety of roadworkers and motorists, changed traffic conditions including traffic control devices and speed reductions will be in place. If you have any questions about this work or require further information, please contact Shane Kelley, Stakeholder Manager at DownerMouchel on (07) 5432 2304. For up-to-date information on traffic disruptions, please visit www.131940.qld.gov.au or call 13 19 40. Last edited: 26 Aug 2014 10:55
Last report received from DTMR: 2014-08-27T19:50:25
BOUNDARY ROAD OFF RAMP, DAKABIN, 4503 - Planned Roadworks Both Directions Night works and temporary traffic changes from Monday 4 August for approximately 4 weeks.. Commencing: 04 August 2014, at 6:00pm Concluding:01 September 2014, at 4:00am Unknown traffic impact. Changed traffic conditions. The Department of Transport and Main Roads and contractor BMD Constructions advises of night works and temporary traffic changes on the Bruce Highway northbound at the Boundary Road off-ramp from Monday 4 August 2014 for approximately four weeks. Night works will occur intermittently between 6pm and 4am. These works are part of the Bruce Highway Managed Motorway Project, and will allow final asphalting and finishing of the new, extended motorway off-ramp. The intermittent night works will involve: Removal of temporary traffic control barriers in the work zone Temporary closure of up to 1km section of the left lane of the Bruce Highway, immediately before the Boundary Road motorway off-ramp and diversion of traffic around the closed lane using signage / traffic controllers. Asphalting and linemarking of the new motorway off-ramp Installation of guard rails, wire rope fencing and other road furniture opening the completed motorway off-ramp to traffic. The Boundary Road motorway off-ramp will remain open throughout these works. Night works will be undertaken and temporary traffic changes southbound will be in place on the Bruce Highway at the Boundary Road on-ramp. Works will occur from 27 to 30 August 2014 between 7pm and 4am, weather permitting. The works are part of the Bruce Highway Managed Motorway Project and involve placing traffic control barriers in preparation for on-ramp widening works. Activities include: Temporarily closing up to 1km of the southbound lane of the Bruce Highway near the Boundary Road interchange. Installing temporary project signage including reduced speed signs on the Bruce Highway near the work zone (80km/hour) and on the southbound motorway on-ramp (40km/hour). Removing existing line marking and placement of temporary line marking on the southbound motorway on-ramp. Installing temporary traffic control barriers along road shoulders in the work zone. The southbound on-ramp to the Bruce Highway will remain open during these works. Should weather or construction conditions affect delivery of this activity, works may be rescheduled to subsequent nights. More information about the Bruce Highway Managed Motorway Project is provided on the Department’s website at: http://www.tmr.qld.gov.au/Projects/Name/B/Bruce-Highway-Managed-Motorway-Project.aspx Last edited: 26 Aug 2014 11:00
Last report received from DTMR: 2014-08-27T19:50:25
PALMWOODS MONTVILLE ROAD, PALMWOODS, 4555 - Planned Roadworks Both Directions 800m west of Macdonald Road. Commencing: 25 July 2014, at 6:39pm Concluding:31 August 2014, at 12:00am Long delays expected. Observe signage. The Department of Transport and Main Roads (TMR) would like to advise of changed traffic conditions on Palmwoods-Montville Road as part of flood reconstruction works at the current site 800m west of Macdonald Road. During August 2014, there will be delays of up to 15 minutes on intermittent days while road surface works are undertaken at this site. Lengthy delays will be scheduled outside peak traffic times. Night works will also be required at this site on 1 August 2014 for the installation of new drainage across the road. The road will be closed at this location from 7pm on 1 August 2014 to 5am on 2 August 2014. Through-traffic will be diverted via Hunchy and Razorback roads and signage and traffic controllers will be in place to direct traffic. There might also be increased noise, dust, light and vibration associated with these night works. Impacts will be monitored and the project team will make every effort to keep disruption to a minimum. If the night work is unable to proceed as scheduled on this date due to unexpected weather or construction conditions, it is expected to occur at night on an alternative date during the following week. Details of these works are included on the attached project information sheet. If you would like further information about the project, please contact the project team on 1800 459 366 or via email on reconstruct_northcoast@tmr.qld.gov.au. For up-to-date information on traffic conditions please visit www.131940.qld.gov.au or call 13 19 40. Last edited: 26 Aug 2014 10:54
Last report received from DTMR: 2014-08-27T19:50:25
PUMICESTONE ROAD, ELIMBAH, 4516 - Planned Roadworks All directions Pumicestone Road (east of the realigned Rutters Road on the eastern side of the Bruce Highway). Commencing: 21 July 2014, at 12:15pm Concluding:31 August 2014, at 5:00am Delays expected. Changed traffic conditions. The Department of Transport and Main Roads (TMR) would like to inform you of upcoming changes to the local road network as part of the Pumicestone Road Interchange upgrade project. Pumicestone Road (east of the realigned Rutters Road on the eastern side of the Bruce Highway) will be closed on Wednesday 23 July 2014 for approximately three weeks, weather and construction conditions permitting. To maintain east-west connectivity, traffic will be diverted around the work area via Old Toorbul Point Road (adjacent to the Bruce Highway) and the realigned section of Old Toorbul Point Road (along the state forest boundary), which will open mid-July. Variable messages signs (VMS) and traffic management will be in place to direct motorists around the culvert works on Pumicestone Road. Motorists are encouraged to drive to the changed traffic conditions and obey signs and traffic controller directions at all times. For up-to-date information on traffic disruptions, please phone 13 19 40 or visit www.131940.com.au. Last edited: 26 Aug 2014 13:18
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, NORTH LAKES, 4509 - Planned Roadworks All directions Construction of Kerr Road Overpass. Commencing: 18 July 2014, at 12:01am Concluding:31 December 2014, at 12:00am Partial lane closures Delays expected. Changed traffic conditions. Contra flow will be in place reducing north and southbound to one lane in each direction. Last edited: 26 Aug 2014 11:31
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, BELLS CREEK, 4551 - Planned Roadworks Both Directions Construction of a new interchange on the Bruce Highway at Roys Road and Bells Creek Road, Beerwah. Reduced speed limit of 80km/h is in place in the roadworks area. Motorists may experience some minor delays. Work is expected to be complete by mid-2015. . Commencing: 09 July 2014, at 1:34pm Concluding:30 June 2015, at 12:00am Delays expected. Reduced speed limit (80km/h). The Department of Transport and Main Roads (TMR) advises that work to place bridge decks onto the new bridge over the Bruce Highway, as part of the Bells Creek Road/Roys Road interchange project, is scheduled to start on 18 July 2014 and be completed by 24 July 2014, weather and construction conditions permitting. To minimise traffic disruptions, works will be carried out on specific nights between 8pm and 5am. For safe and efficient traffic management, lane closures and reduced speed limits will be in place on the Bruce Highway. Variable message signs and traffic controllers will direct motorists to the appropriate lanes during these works. TMR apologises for any inconvenience this work may cause and thanks local residents, businesses and road users for their continued patience while the upgrade is underway. More information about the interchange upgrade is available on TMR’s website at www.tmr.qld.gov.au by searching ‘Bruce Highway interchange at Roys Road and Bells Creek Road’. If you require further information, please call the North Coast District Maroochydore Office on 5451 7055 or email northcoast@tmr.qld.gov.au. Last edited: 26 Aug 2014 11:06
Last report received from DTMR: 2014-08-27T19:50:25
MOUNT GLORIOUS ROAD, MOUNT GLORIOUS, 4520 - Planned Roadworks Northbound Works will be carried out on a section of road about 6.8km north of Mount Glorious. Commencing: 07 July 2014, at 7:00am Concluding:31 December 2014, at 6:00pm Single lane in operation Delays expected. Observe signage. The Department of Transport and Main Roads would like to advise you about reconstruction work to be undertaken on Mount Glorious Road to repair damaged sustained in the natural disaster events of early 2013. The work will start in the week commencing 7 July 2014 and will be carried out on a section of road about 6.8km north of Mount Glorious. The work involves embankment stabilisation and road surface repairs and it is expected to be completed by late December 2014, weather permitting. Works will be carried out between 7am and 6pm from Monday to Friday and some Saturday work may be required. The site will operate as a single lane under traffic control when reconstruction work is underway and motorists may experience short delays. We would like to thank all road users for their patience during this work. A project factsheet is attached. For further information about the project, the project team can be contacted on 1800 459 366 or by email on reconstruct_northcoast@tmr.qld.gov.au. Last edited: 26 Aug 2014 11:49
Last report received from DTMR: 2014-08-27T19:50:25
MALENY MONTVILLE ROAD, BALMORAL RIDGE, 4552 - Planned Roadworks Both Directions At Gerrard’s Lookout point south of Montville and near Benecke Road, approximately 2km north of Balmoral Ridge. Commencing: 19 May 2014, at 12:00am Concluding:30 September 2014, at 12:01am Delays expected. Observe signage. The Department of Transport and Main Roads (TMR) is undertaking reconstruction works on Maleny-Montville Road to repair damage sustained during the extreme weather event in early 2013. From 19 May 2014, road reconstruction work will be carried out at two sites located: Gerrard’s Lookout point south of Montville and near Benecke Road, approximately 2km north of Balmoral Ridge. The work should be completed by late September 2014, weather permitting. The reconstruction work involves slope stabilisation, rock filling, pavement and drainage works. Works will generally be carried out between 7am and 6pm, Monday to Friday. Some work may be required on Saturdays. A single lane operation under traffic control will be in place for the duration of the work on Maleny-Montville Road to enable the embankment stabilisation works to be carried out safely and efficiently. Short delays for motorists can be expected. Access to private properties and Gerrard’s Lookout point will be maintained at all times. Variable Message Signs are located in both directions to advise motorists of changes to traffic conditions and any restrictions. For up-to-date information on traffic conditions please visit www.131940.qld.gov.au or call 13 19 40. If you would like further information about the project, please contact the project team on 1800 459 366 or via email on norc_reconstruct@tmr.qld.gov.au Last edited: 26 Aug 2014 12:06
Last report received from DTMR: 2014-08-27T19:50:25
KILCOY MURGON ROAD, JIMNA, 4515 - Planned Roadworks All directions Road repairs, will be carried out on three sections of road approximately 6km, 12km and 13km north of Kilcoy. Works will be carried out between 7am and 6pm from Monday to Friday. Some works may be undertaken on Saturdays . Commencing: 14 April 2014, at 7:00am Concluding:30 September 2014, at 6:00pm Partial lane closures Delays expected. Changed traffic conditions. The Department of Transport and Main Roads is undertaking reconstruction works on Kilcoy-Murgon Road at Sheep Station Creek to repair damage and will be carried out on three sections of road approximately 6km, 12km and 13km north of Kilcoy. Crews will complete one site at a time to reduce the delays for motorists and impacts on residents. The project is expected to be completed by the end of September, weather permitting. Traffic arrangements: Works will be carried out between 7am and 6pm from Monday to Friday. Some works may be undertaken on Saturdays. Each site will operate as a single lane under traffic control while reconstruction work is underway. Reduced speed limits will apply through the work sites for the safety of roadworkers and all road users. Signage will be in both directions to advise motorists of changes to traffic conditions and any restrictions. Motorists may experience delays. If you would like further information about the project, please contact the project team on 1800 459 366 or via email on norc_reconstruct@tmr.qld.gov.au. Last edited: 26 Aug 2014 12:30
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, COOROY, 4563 - Planned Roadworks All directions Cooroy to Federal (including Black Mountain). Commencing: 18 February 2014, at 12:34pm Concluding:31 July 2016, at 12:00am Lane or lanes reduced Delays expected. Proceed with caution. COOROY TO FEDERAL (INCLUDING BLACK MOUNTAIN) Planned Roadworks All directions Contract 2 (Cudgerie Drive to Sankeys Road) • The Bruce Highway north and southbound lanes will close for short periods at night between Gardners Road and Pioneer Road from Monday 25 August for approximately three weeks, weather permitting. These temporary closures are required to deliver bridge girders via the existing highway for the new Skyring Creek bridges at Gardners Road. To minimise impacts on road users, the night works will occur between 12am and 5am, Sunday to Thursday. Reduced speeds, traffic controllers, police and signage will be in place to safeguard motorists and road workers. • Temporary closures of the Bruce Highway north and southbound lanes between Black Mountain and just south of Gardners Road will occur for blasting from late March 2014 until late 2014, weather permitting. Sections of Gardners Road, Black Mountain Range Road, Uhlmanns Road,Pomona Connection Road, Pioneer Road and Timbara Road may also be temporarily closed. Motorists may experience delays of up to five minutes during the blasts and are encouraged to follow the instructions of traffic controllers, police and road signs. Contract 3 (Cooroy southern interchange to Cudgerie Drive) • Night work will occur on the Bruce Highway near the Cooroy southern interchange on Tuesday 19 August 2014 to complete median and island core investigations. These works will require a temporary northbound single lane closure and southbound diversion of traffic at the Cooroy southern interchange. Southbound traffic will be redirected from the highway at the off-ramp at Exit 230B and re-join the highway via the southbound on-ramp. To minimise impacts on road users, work will be undertaken at night between 9pm and 5am. Reduced speeds, traffic controllers, police and signage will be in place to safeguard motorists and road workers. Further lane closures and traffic diversions will be required at night in the coming weeks for median and barrier works. • From mid-July 2014, night works will occur on the Bruce Highway between the Cooroy southern interchange and Cudgerie Drive to install roadside barriers next to the northbound lane. The speed limit will be reduced through the Cooroy southern interchange to 70km/h, and just north of the interchange to 80km/h. One of the northbound highway lanes will also be shortened around 1km south of the interchange. Night works will be carried out intermittently until early September between Sunday and Thursday, from 7pm to 6am. Motorists should expect delays of up to five minutes. Between February 2014 and February 2017, all vehicles wider than 4m will need to stop opposing traffic. An alternative route is available via the Eumundi exit of the Bruce Highway in the south and Pomona Connection Road in the north. Cooroy can then be reached via the old highway (Eumundi Range Road/Nandroya Road/Myall Street) and Pomona can be reached via Elm Street and Yurol Forest Drive. More details are available on the department’s Conditions of Operation database at www.tmr.qld.gov.au. Proceed with caution. Last edited: 26 Aug 2014 09:47
Last report received from DTMR: 2014-08-27T19:50:25
MOOLOOLABA ROAD, BUDERIM, 4556 - Planned Roadworks All directions Roadworks on Mooloolaba road between Foote Avenue and Buderim Pines Drive. Lane closures and reduced speed limits may apply. Motorists may experience some minor delays. Work is expected to be complete by late 2014. Commencing: 24 December 2013, at 6:01pm Concluding:31 December 2014, at 12:00am All lanes affected Delays expected. Proceed with caution. Foote Avenue intersection closed from 16 July until approximately mid September. The Department of Transport and Main Roads (TMR) would like to advise you of the temporary closure of Foote Avenue-Mooloolaba Road intersection in Buderim, as part of the $10.4 Mooloolaba Road safety improvement project between Foote Avenue and Buderim Pines Drive. The Foote Avenue intersection with Mooloolaba Road will be closed to all traffic, 24 hours a day until early September 2014, weather permitting, to undertake drainage, electrical and pavement work. Access to Foote Avenue will still be available from Eckersley Avenue. Once road works are complete, the final intersection layout at Foote Avenue will be altered to remove right turns in and out. A dedicated right turning lane was recently added to the Eckersley Avenue intersection with Mooloolaba Road providing improved access. Traffic controllers, reduced speed limits and signage is in place to safeguard road users, roadworkers and adjacent residents. More information about the safety improvements is available on TMR’s website at www.tmr.qld.gov.au by searching 'Mooloolaba Road’. If you require further information, please call the North Coast District Maroochydore Office on 5451 7055 or email northcoast@tmr.qld.gov.au. Last edited: 26 Aug 2014 11:38
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, ELIMBAH, 4516 - Planned Roadworks Both Directions Upgrade works Bruce Highway interchange with Pumicestone Road, Elimbah. Reduced speed limit of 80km/h is in place in roadworks area. Motorists may experience some minor delays. Work expected to be complete by late 2014. Commencing: 24 December 2013, at 8:00am Concluding:31 December 2014, at 12:00am All lanes affected Delays expected. Reduced speed limit (80km/h). Roadworks associated with upgrade of the interchange require a temporary width restriction of 3.2m on the northbound off-ramp. Any excess dimension load needing to travel through the site should contact site representative Paul Burgoyne (0415 520 364) to make arrangements at least 24 hours prior. Old Toorbul Point Road access to Pumicestone Road (adjacent to the Bruce Highway) has been realigned further to the east along the state forest boundary. The realigned section will open to traffic on Thursday 10 July 2014, weather and construction conditions permitting. As part of the upgrade of the entry ramp to the Bruce Highway southbound, the section of Old Toorbul Point Road adjacent to the highway will eventually be closed to a cul-de-sac for local traffic only. While the existing intersection with Pumicestone Road will remain open at present, access to these properties on Old Toorbul Point Road will also be available via the realigned section of road. Traffic management will be in place to direct motorists to the new intersection on Pumicestone Road. Motorists are encouraged to drive to the changed traffic conditions and obey signs and traffic controller directions at all times. Information about traffic disruptions will also be available from the 13 19 40 traffic report line and www.131940.qld.gov.au Last edited: 26 Aug 2014 11:58
Last report received from DTMR: 2014-08-27T19:50:25
MOUNT MEE ROAD, MOUNT MEE, 4521 - Planned Roadworks Both Directions Commencing: 22 December 10:00am Concluding:30 September 2014, at 12:00am Lane or lanes reduced Delays expected. Traffic control on scene. The Department of Transport and Main Roads (TMR) is undertaking reconstruction works on Mount Mee Road to repair significant damage sustained during heavy rain in early 2013. The reconstruction work includes slope stabilisation, pavement repairs and drainage works. Works will generally be carried out between 7am and 6pm, Monday to Friday. Reconstruction works are required at two sites approximately 5km north of Dayboro near Ocean View Road and 1.5km south of Mount Mee near Duncan Road. One lane will be closed under traffic control at each work site and some delays are expected. Motorists are reminded to drive to the changed conditions and obey all signage for their own safety and the safety of roadworkers. The project is expected to be completed by the end of September 2014, weather permitting. We appreciate the ongoing patience of the community and motorists while this important project is underway. If you would like further information about the project, please contact the project team on 1800 459 366 or via email on norc_reconstruct@tmr.qld.gov.au. Last edited: 26 Aug 2014 12:39
Last report received from DTMR: 2014-08-27T19:50:25
Incidents
DECEPTION BAY ROAD, DECEPTION BAY, 4508 - Multi-vehicle Crash All directions At southbound on ramp to the Bruce Highway. One lane blocked No delays expected. Emergency services are on scene/en-route. Last edited: 27 Aug 2014 19:36
Last report received from DTMR: 2014-08-27T19:50:25
Darling Downs
Roadworks
TOOWOOMBA KARARA ROAD, FELTON SOUTH, 4358 - Planned Roadworks Both Directions Various Locations from the intersection with the Gore Highway to approximately the intersection with Millmerran Leyburn Road . Commencing: 12 September 2014, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 01 December 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 60km/h, Traffic control with possible delays of up to 5 minutes. On Site During NON working hours: Returned to normal traffic conditions. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 21 Jul 2014 14:37
Last report received from DTMR: 2014-08-27T19:50:25
BRIDGE STREET, COTSWOLD HILLS, 4350 - Planned Roadworks All directions Near the intersection of Boundary Street. Commencing: 28th August 2014 at 09.00am Concluding: 29th of August 2014 at 03.00pm weather permitting Partial lane closures No delays expected. Changed traffic conditions. Motorists are advised there will be partial lane closures and reduced speed to 40km/hour. Last edited: 27 Aug 2014 15:04
Last report received from DTMR: 2014-08-27T19:50:25
LEICHHARDT HIGHWAY, MILES, 4415 - Planned Roadworks Both Directions Approximately 1 kilometre south of Miles. Commencing: 18 August 2014, between the hours of 6:00am and 6:00pm, 7 days a week. Concluding: 17 October 2014, weather permitting. No blockage Delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Traffic Control with possible delays of up to 5 minutes. On Site During NON working hours: Returned to normal traffic conditions with reduced speed Limit 60km/h. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 19 Aug 2014 12:29
Last report received from DTMR: 2014-08-27T19:50:25
WARREGO HIGHWAY, JONDARYAN, 4403 - Planned Roadworks Both Directions Between the intersection of Jondaryan MtTyson Road and Stations Street. Commencing: 11 August 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: 30 September 2014, weather permitting. No blockage Delays expected. Changed traffic conditions. On Site during working hours: Side Track in place, Reduced Speed Limit 40km/h, Traffic Control with possible delays of up to 5 minutes. On Site During NON working hours: Side Track in place, Reduced Speed Limit 60km/h, Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 18 Aug 2014 17:41
Last report received from DTMR: 2014-08-27T19:50:25
GORE HIGHWAY, GOONDIWINDI, 4390 - Planned Roadworks Both Directions Between approximately Intersection Manus Rad and Tenomby Road . Commencing: 12 August 2014, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 01 December 2014, weather permitting. Medium delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Portable traffic signals with possible delays of up to 15 minutes, please allow extra travel time. On Site During NON working hours: Single Lane in Operation, Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 10 minutes, please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 17 Jul 2014 15:02
Last report received from DTMR: 2014-08-27T19:50:25
GORE HIGHWAY, WYAGA, 4390 - Planned Roadworks Both Directions Between approximately Yagburne Boondandilla Road and Yagaburne Road. Commencing: 12 August 2014, between the hours of 6:00am and 6:00pm, Monday to Friday, Concluding: 01 December 2014, weather permitting. Medium delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Portable traffic signals with possible delays of up to 15 minutes, please allow extra travel time. On Site During NON working hours: Single Lane in Operation, Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 10 minutes, please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 17 Jul 2014 15:19
Last report received from DTMR: 2014-08-27T19:50:25
GORE HIGHWAY, CAPTAINS MOUNTAIN, 4357 - Planned Roadworks Both Directions Various Locations between Captains Mountain and Intersection Gore Highway and Leichhardt Highway. Commencing: 12 August 2014, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 01 December 2014, weather permitting. Medium delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Portable traffic signals with possible delays of up to 15 minutes, please allow extra travel time. On Site During NON working hours: Single Lane in Operation, Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 10 minutes, please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 17 Jul 2014 15:33
Last report received from DTMR: 2014-08-27T19:50:25
GORE HIGHWAY, WYAGA, 4390 - Planned Roadworks Both Directions Approximately 55 kilometres south of Goondiwindi. Commencing: 12 August 2014, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 01 December 2014, weather permitting. Medium delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Portable traffic signals with possible delays of up to 15 minutes, please allow extra travel time. On Site During NON working hours: Single Lane in Operation, Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 10 minutes, please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 17 Jul 2014 15:25
Last report received from DTMR: 2014-08-27T19:50:25
CUNNINGHAM HIGHWAY, KURUMBUL, 4388 - Planned Roadworks Both Directions Over a approximate 50km stretch, starting from approximately 3 kilometres west of the intersection with Texas Yelarbon Road to approximately the intersection with Wilson Court, Goondiwindi. Commencing: 12 August 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: 12 September 2014, weather permitting. Single lane in operation Delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 15 minutes. Please allow for extra travel time. On Site During NON working hours: Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 15 minutes. Please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 12 Aug 2014 11:22
Last report received from DTMR: 2014-08-27T19:50:25
NEW ENGLAND HIGHWAY, APPLETHORPE, 4378 - Planned Roadworks Both Directions Between Ellwood Road and Nimac Lane. Commencing: 11 August 2014, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 08 September 2014, weather permitting. Single lane in operation Delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Traffic Control with possible delays of up to 15 minutes. Please allow for extra travel time. On Site During NON working hours: Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 15 minutes. Please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 11 Aug 2014 11:12
Last report received from DTMR: 2014-08-27T19:50:25
MOONIE HIGHWAY, DALBY, 4405 - Planned Roadworks Both Directions Starting approximatley 5 kilometres west of Dalby and finishing approximately 7.5 west of Dalby. Commencing: 04 August 2014, between the hours of 6:00am and 6:00pm, 7 days a week. Concluding: 24 September 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Traffic control with possible delays of up to 5 minutes. On Site During NON working hours: Single lane in operation, Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 26 May 2014 12:51
Last report received from DTMR: 2014-08-27T19:50:25
TOOWOOMBA CECIL PLAINS ROAD, WELLCAMP, 4350 - Planned Roadworks Both Directions East of Brimblecombe Road, near entrance to new airport. Commencing: 28 July 2014, between the hours of 6.00 am and 6:00pm, Monday to Friday. Concluding: 15 September 2014, Weather permitting. Single lane in operation Delays expected. Changed traffic conditions. On Site Working Hours:Single Lane in operation, Reduced Speed to 40km/h,Possible delays up to 15 minutes, Portable traffic signals. On Site NON working hours: Single lane in operation, Reduced speed limit 60km/h, Portable Traffic Signals Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions:www.tmr.qld.gov.au Last edited: 28 Jul 2014 09:25
Last report received from DTMR: 2014-08-27T19:50:25
NEW ENGLAND HIGHWAY, CROWS NEST, 4355 - Planned Roadworks Both Directions Industrial Road. Commencing: 21 July 2014, 24 hours a day. Concluding: 30 August 2014, weather permitting No delays expected. Changed traffic conditions. Industrial Road has a Single lane in operation with detour in place, please observe signage. Last edited: 18 Jul 2014 14:01
Last report received from DTMR: 2014-08-27T19:50:25
LEICHHARDT HIGHWAY, GROSMONT, 4419 - Planned Roadworks Both Directions Approximately 28 kilometres south of Taroom. Commencing: 17 July 2014, between the hours of 6:00am and 6:00pm, 7 days a week. Concluding: 14 November 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Traffic control with possible delays of up to 5 minutes. On Site During NON working hours: Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 17 Jul 2014 12:58
Last report received from DTMR: 2014-08-27T19:50:25
LEICHHARDT HIGHWAY, GURULMUNDI, 4415 - Planned Roadworks Both Directions Juandah Creek, approximately 90 kilometres south of Taroom. Commencing: 17 July 2014, between the hours of 6:00am and 6:00pm, 7 days a week. Concluding: 14 November 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Traffic control with possible delays of up to 5 minutes. On Site During NON working hours: Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 17 Jul 2014 13:06
Last report received from DTMR: 2014-08-27T19:50:25
WARREGO HIGHWAY, BAKING BOARD, 4413 - Planned Roadworks Both Directions Between approximately Chinchilla Golf Club and Stockyard Creek or, approximately 8 kilometres west of Rocky Creek. Commencing: 31 July 2014, 24 hours a day 7 days a week. Concluding: November 2014. No blockage No delays expected. Reduced speed limit (80km/h). Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 04 Aug 2014 10:20
Last report received from DTMR: 2014-08-27T19:50:25
DALBY KOGAN ROAD, KOGAN, 4406 - Planned Roadworks All directions At Braemar Creek Bridge, approximately 35 kilometers West of Dalby. Commencing: 3rd February 2014, between the hours of 6:00am and 6:00pm, Monday to Friday. Concluding: 3rd September 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Please proceed with caution. On Site During NON working hours: Single lane in operation, Reduced Speed Limit 60km/h. Portable traffic signals with possible delays of up to 5 minutes, Please proceed with caution. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 22 Jul 2014 11:50
Last report received from DTMR: 2014-08-27T19:50:25
TOOWOOMBA CECIL PLAINS ROAD, EVANSLEA, 4356 - Planned Roadworks Both Directions Between Evanslea Road, Evanslea and Bowneville Norwin Road, Norwin. Commencing: 27 May 2014, between the hours of 6:00am and 6:00pm, 7 days a week. Concluding: 31 October 2014, Weather Permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Single lane in operation, Reduced Speed Limit 40km/h, Traffic control with possible delays of up to 5 minutes. Please proceed with caution. On Site During NON working hours: Single lane in operation, Reduced Speed Limit 60km/h, Portable Traffic Signals with possible delays of up to 5 minutes. Please proceed with caution. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 13 May 2014 10:59
Last report received from DTMR: 2014-08-27T19:50:25
LEICHHARDT HIGHWAY, THE GUMS, 4406 - Planned Roadworks Both Directions Various locations between Donoghues Road, The Gums and Talinga Road, Moonie . Commencing: 13 May 2014, between the hours of 6:00am and 6:00pm, 7 days per week. Concluding: 30 August 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Single lane in operation, traffic control with possible delays of up to 15 minutes. Please allow for extra travel time. On Site During NON working hours: Reduced speed 60km/h, portable traffic signals with possible delays of up to 15 minutes, please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 28 Apr 2014 12:39
Last report received from DTMR: 2014-08-27T19:50:25
SURAT DEVELOPMENTAL ROAD, GLENMORGAN, 4423 - Planned Roadworks Both Directions Various locations between Windemere Road, Glenmorgan and Southglen North Road, The Gums. Commencing: 13 May 2014, between the hours of 6:00am and 6:00pm, 7 days a week. Concluding: 30 August 2014, weather permitting. Short delays expected. Changed traffic conditions. On Site during working hours: Reduced Speed Limit 40km/h, Single lane in operation, traffic control with possible delays of up to 15 minutes. Please allow for extra travel time. On Site During NON working hours: Reduced speed 60km/h, portable traffic signals with possible delays of up to 15 minutes, please allow for extra travel time. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 28 Apr 2014 12:47
Last report received from DTMR: 2014-08-27T19:50:25
RUTHVEN STREET, TOOWOOMBA CITY, 4350 - Planned Roadworks All directions Intersection of Ruthven Street and Chalk Drive, Toowoomba. Commencing: 30th 2014 April 2014, between the hours of 6:00am and 6:00pm Concluding: 30 September 2014, weather permitting. Limited to one lane No delays expected. Changed traffic conditions. NIGHT WORKS COMMENCING 25 AUGUST 2014, CONCLUDING 28 AUGUST 2014, BETWEEN THE HOURS OF 6:00PM AND 5:00AM WEATHER PERMITTING, LANE CLOSURES, DETOURS, REDUCED SPEED 40KM/H. HEAVY VEHICLE OPERATORS ARE ADVISED TO PLEASE CHECK THE TMR WEB SITE FOR SPECIFIC CONDITIONS:- www.tmr.qld.gov.au On Site during working hours: Limited to one lane both directions with reduced speeds to 40km/hour, Traffic Control on side Streets intersecting with the New England Highway southbound. Please proceed with caution and obey signage. On Site During NON working hours: Please proceed with caution and obey signage. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 26 Aug 2014 16:41
Last report received from DTMR: 2014-08-27T19:50:25
RUSSELL STREET, TOOWOOMBA CITY, 4350 - Planned Roadworks All directions Intersection Russell and Victoria Streets. Commencing: 07 April 2014, between the hours of 6:00am and 6:00pm, Monday to Saturday. Concluding: Approximately 19 September 2014, weather permitting. No delays expected. Changed traffic conditions. RUSSELL STREET CLOSED TO EAST BOUND TRAFFIC, AT THE INTERSECTION WITH VICTORIA STREET. USE ALTERNATE ROUTE Pedestrian access will be maintained and Businesses in the area will remain open and accessible Last edited: 12 May 2014 14:22
Last report received from DTMR: 2014-08-27T19:50:25
GOGGS STREET, TOOWOOMBA CITY, 4350 - Planned Roadworks All directions Intersection Prescott Street and Goggs Street. Goggs Street (between Kenric Street & Clifford Street) West Creek Channel (between Herries Street & James Street) . Commencing: 10 February 2014, between the hours of 6:30am and 6:30pm, Monday to Saturday. Concluding: September 2014. Unknown traffic impact. Changed traffic conditions. Goggs Street, TOOWOOMBA CITY: Tointon Street intersection to Kenric Street will be CLOSED from Monday 24 March 2014 for two weeks for stormwater drainage upgrade works. Detour via Langton Street. Access available to local businesses. Consider alternative routes if traveling through the area. Pay attention to signs and allow extra travel time when planning your trip. Changes include: * Short-term traffic arrangements will be in place along Goggs Street, between Kenric and Clifford streets. * Temporary road closures will occur between Clifford and Prescott streets, including the intersections. * Driveway and pedestrian access to businesses and residences will be maintained. * Footpath closures near the active work area and alternative routes will be signed. * Alternative traffic routes and redirections will be signed. Please drive to the conditions at all times. Last edited: 25 Mar 2014 10:58
Last report received from DTMR: 2014-08-27T19:50:25
Incidents
TARA KOGAN ROAD, TARA, 4421 - Potholes or road surface damage Hazard Both Directions Narrow soft Shoulders, speed restrictions the length of the road. No blockage Unknown traffic impact. Reduced speed limit (80km/h). Last edited: 31 Jul 2014 11:33
Last report received from DTMR: 2014-08-27T19:50:25
DRAYTON STREET, DALBY, 4405 - Potholes or road surface damage Hazard Intersection Drayton Street and Owen Street. No delays expected. Proceed with caution. Last edited: 14 Jul 2014 15:22
Last report received from DTMR: 2014-08-27T19:50:25
South West
Road Closures/Load Limits
CONDAMINE HIGHWAY, WARKON, 4417 - Snake Creek, approximately 17.5 kilometres east of intersection with Carnarvon Highway Open (with caution) Reduced speed limit (40Km/h). Side-track opened to 2 lanes, speed limited 40km/h Last edited: 11 Jul 2014 11:51
Last report received from DTMR: 2014-08-27T19:50:25
Roadworks
CARNARVON HIGHWAY, BEILBA, 4454 - Planned Roadworks Both Directions Intersection Fairview Road. Commencing: 22 July 2014, 24 hrs a day 7 days a week. Concluding: 25 November 2014, weather permitting No delays expected. Reduced speed limit (80km/h). Last edited: 21 Jul 2014 11:03
Last report received from DTMR: 2014-08-27T19:50:25
NOONDOO THALLON ROAD, THALLON, 4497 - Planned Roadworks All directions (Dunwinnie Road, 4 kilometers West of Thallon). Commencing: 7th June 2014 at 06.00am Concluding: 1st October 2014 at 06.00pm Short delays expected. Changed traffic conditions. WORK HOURS: Monday - Saturday, Single lane in operation, traffic control on site, speed reduced to 40km/hour, delays up to 5 minutes. AFTER HOURS: Speed reduced to 60km/hour. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 03 Jul 2014 10:59
Last report received from DTMR: 2014-08-27T19:50:25
Incidents
CARNARVON HIGHWAY, BAFFLE WEST, 4454 - Potholes or road surface damage Hazard All directions Between Baffle Creek and the Dawson River, over a 20km long section. Or approximately 20km North of Injune to 10km South of Rolleston. No delays expected. Proceed with caution. Heavy vehicle operators are advised that width and/or mass restrictions may apply at road works. Please check the TMR web site for site specific conditions: www.tmr.qld.gov.au Last edited: 07 Apr 2014 12:45
Last report received from DTMR: 2014-08-27T19:50:25
Central West
Road Closures/Load Limits
ISISFORD ILFRACOMBE ROAD, ISISFORD, 4731 - Open (with caution) Last edited: 22 Aug 2014 11:54 Next Update: 25 Aug 2014
Last report received from DTMR: 2014-08-27T19:50:25
CRAMSIE MUTTABURRA ROAD, LONGREACH, 4730 - Open (with caution) Last edited: 22 Aug 2014 11:51 Next Update: 25 Aug 2014
Last report received from DTMR: 2014-08-27T19:50:25
ILFRACOMBE ARAMAC ROAD, ARAMAC, 4726 - Restricted to four wheel drive vehicles only Last edited: 22 Aug 2014 11:50 Next Update: 25 Aug 2014
Last report received from DTMR: 2014-08-27T19:50:25
ARAMAC TORRENS CREEK ROAD, PELICAN CREEK, 4726 - Restricted to four wheel drive vehicles only Last edited: 22 Aug 2014 11:49 Next Update: 25 Aug 2014
Last report received from DTMR: 2014-08-27T19:50:25
Wide Bay-Burnett
Roadworks
BAUPLE WOOLOOGA ROAD, GOOTCHIE, 4650 - Planned Roadworks Both Directions Gootchie timber railway overpass, about 4.3km from the Bruce Highway. Commencing: 5am on Saturday 30 August Concluding:7pm on Sunday 31 August, weather permitting Road closed both directions Delays expected. Use alternative route. The closure will be in place between 5am on Saturday 30 August and 7pm on Sunday 31 August 2014. During this time, a temporary signed detour for light vehicles will be in place via Old Gympie Road and Netherby Road. The detour for heavy vehicles will be via the Wide Bay Highway. Last edited: 27 Aug 2014 08:14
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, APPLE TREE CREEK, 4660 - Planned Roadworks Both Directions Various sites between Childers and Booyal. Commencing: Wednesday 3 September 2014 Concluding:Friday 5 September 2014, weather permitting Lane or lanes reduced Delays expected. Reduced speed limit (40km/h). From early September, crews will begin maintenance reseal works near Booyal and will progressively move south Last edited: 26 Aug 2014 14:43
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, GIN GIN, 4671 - Planned Roadworks Both Directions Various sites between south of Gin Gin and the Gladstone/Bundaberg regional council border. Commencing: 1 September 2014 Concluding:5 September 2014, weather permitting Lane or lanes reduced Delays expected. Reduced speed limit (40km/h). From early September, crews will begin maintenance reseal works north of Gin Gin and will progressively move south Last edited: 26 Aug 2014 14:43
Last report received from DTMR: 2014-08-27T19:50:25
KENILWORTH SKYRING CREEK ROAD, TUCHEKOI, 4570 - Planned Roadworks Both Directions Chinaman Creek Bridge. Commencing: Tuesday 27 May 2014 Concluding:21 August 2014 No delays expected. Works have been completed and the bridge has reopened Last edited: 21 Aug 2014 14:08
Last report received from DTMR: 2014-08-27T19:50:25
CHILDERS ROAD, ELLIOTT, 4670 - Planned Roadworks Both Directions Between the Elliott River and Foleys Road. Commencing: Monday 25 August 2014 Concluding:December 2014, weather permitting Lane or lanes reduced Delays expected. Reduced speed limit (40km/h). Works will generally be carried out between 6am and 6pm, Monday to Saturday. Traffic controllers, single-lane closures and speed restrictions will be in place as required. Last edited: 21 Aug 2014 11:26
Last report received from DTMR: 2014-08-27T19:50:25
BUNYA HIGHWAY, WOOROOLIN, 4608 - Planned Roadworks Both Directions Just north of Wooroolin. Commencing: early September 2014 Concluding:March 2015, weather permitting Lane or lanes reduced Delays expected. Reduced speed limit (40km/h). Works will occur between 6am and 6pm, Monday to Friday. Traffic controllers, single lane closures and speed restrictions will be used as required to ensure the safety of motorists, pedestrians and roadworkers. Last edited: 27 Aug 2014 11:08
Last report received from DTMR: 2014-08-27T19:50:25
GYMPIE WOOLOOGA ROAD, WIDGEE, 4570 - Planned Roadworks Both Directions Between Widgee and the Burnett Highway. Commencing: mid-August Concluding:mid-September, weather permitting Partial lane closures Delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. At times during these works it will be necessary for single lane closures to be in place outside of work hours and when required, traffic signals will be in place to assist motorists. While every effort will be made to minimise the impacts, motorists may experience delays of seven minutes and should factor additional travel time to their journey. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett District) on 1300 728 390 during business hours. Last edited: 19 Aug 2014 14:39
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, TIARO, 4650 - Planned Roadworks Both Directions At the southern approach to Chinaman Creek Bridge, north of Tiaro. Commencing: 19 August 2014 Concluding:mid-September 2014 Limited to one lane Delays expected. Reduced speed limit (40km/h). Motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. At times during these works it will be necessary for single lane closures to be in place outside of work hours with traffic control in place. While every effort will be made to minimise impacts, motorists may experience delays of seven minutes and should factor additional travel time to their journey. For further information, please contact Transport and Main Roads (Wide Bay/Burnett District) on 1300 728 390 during business hours. Last edited: 14 Aug 2014 20:17
Last report received from DTMR: 2014-08-27T19:50:25
GYMPIE WOOLOOGA ROAD, LOWER WONGA, 4570 - Planned Roadworks Both Directions Between Wide Bay Highway and Warhurst Road . Commencing: mid-August Concluding:mid-September, weather permitting Partial lane closures Delays expected. Reduced speed limit (40km/h). Motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. At times it will be necessary for single lane closures to be in place outside of work hours and when required, traffic signals will be in place to assist motorists. While every effort will be made to minimise the impacts, motorists may experience delays of five minutes and should factor additional travel time to their journey. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett District) on 1300 728 390 during business hours. Last edited: 19 Aug 2014 14:34
Last report received from DTMR: 2014-08-27T19:50:25
KILKIVAN TANSEY ROAD, TANSEY, 4601 - Planned Roadworks Both Directions Commencing: now Concluding:mid-September 2014, weather permitting Partial lane closures Delays expected. Reduced speed limit (40km/h). Preliminary reconstruction works will be undertaken at several locations on Kilkivan–Tansey Road. Motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett District) on 1300 728 390 during business hours. Last edited: 19 Aug 2014 14:35
Last report received from DTMR: 2014-08-27T19:50:25
BOOYAL DALLARNIL ROAD, BOOYAL, 4671 - Planned Roadworks Both Directions About 800 metres south of Railway Road. Commencing: Wednesday 9 July Concluding:late August, weather permitting Partial lane closures Delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 19 Aug 2014 14:31
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, APPLE TREE CREEK, 4660 - Planned Roadworks Both Directions Between Chews Road (south) and Old Creek Road (north). Commencing: Tuesday 10 June Concluding:mid-September, weather permitting Partial lane closures Delays expected. Reduced speed limit (40km/h). During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 19 Aug 2014 14:31
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, BOOYAL, 4671 - Planned Roadworks Both Directions At Sandy Creek Bridge. Commencing: Tuesday 22 July Concluding:late September 2014 Short delays expected. Changed traffic conditions. Last edited: 17 Jul 2014 14:53
Last report received from DTMR: 2014-08-27T19:50:25
MARYBOROUGH HERVEY BAY ROAD, DUNDATHU, 4650 - Planned Roadworks Both Directions Near Saltwater Creek. Commencing: Tuesday 22 July Concluding:early September, weather permitting Short delays expected. Allow extra travel time. Motorists are advised to expect changed conditions including a reduced speed limit, traffic control and some temporary lane closures while the works are underway. The majority of works will be undertaken outside of peak periods to minimise traffic impacts. Last edited: 21 Jul 2014 08:06
Last report received from DTMR: 2014-08-27T19:50:25
GIN GIN MOUNT PERRY ROAD, WONBAH, 4671 - Planned Roadworks Both Directions Between Shields Road and Wonbah Road. Commencing: Monday 21 July Concluding:mid-September, weather permitting Partial lane closures Delays expected. Changed traffic conditions. During the works, motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. While every effort will be made to minimise the impacts, motorists may experience some delays and should factor additional travel time to their journey. Please slow down, be patient, drive to the changed traffic conditions and follow the instructions of road signage and/or traffic controllers. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett District) on 1300 728 390 during business hours. Last edited: 19 Aug 2014 14:36
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, CHERWELL, 4660 - Planned Roadworks Both Directions South of Doghole Creek (about 5km north of Howard). Commencing: April 2014 Concluding:August 2014, weather permitting Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 14:52
Last report received from DTMR: 2014-08-27T19:50:25
MARY VALLEY ROAD, KANDANGA, 4570 - Planned Roadworks Both Directions Between Dagun and Imbil. Commencing: 29 July 2014 Concluding:30 September 2014 Medium delays expected. Reduced speed limit (40km/h). Motorists may encounter stop-and-go traffic arrangements, single lane closures and reduced speed limits. At times it will be necessary for single lane closures to be in place outside of work hours and when required, traffic signals will be in place to assist motorists. While every effort will be made to minimise impacts, motorists may experience delays of five to ten minutes and should factor additional travel time to their journey. For further information on these works, please contact Transport and Main Roads (Wide Bay/Burnett District) on 1300 728 390 during business hours. Last edited: 11 Jul 2014 13:39
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, GIN GIN, 4671 - Planned Roadworks Both Directions At the northern entrance to Gin Gin. Commencing: Tuesday 24 June Concluding:Late August 2014, weather permitting Short delays expected. Changed traffic conditions. Works are underway to improve roadside drainage and parking facilities. Motorists and the local community should expect changed conditions while works are under way, including changed parking arrangements, reduced speed limits, partial lane closures and other temporary traffic control measures. Motorists may experience some delays if travelling during work hours, and should observe all safety signage and drive to suit the conditions Last edited: 17 Jun 2014 17:01
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, ISIS CENTRAL, 4660 - Planned Roadworks Both Directions Between North South Road and Adies Road. Commencing: Early May Concluding:late August 2014, weather permitting Short delays expected. Changed traffic conditions. Last edited: 10 Jul 2014 16:57
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, TAKILBERAN, 4671 - Planned Roadworks Both Directions Between south of Carman Road and Takilberan Creek. Commencing: May 2014 Concluding:September 2014, weather permitting No delays expected. Observe signage. Last edited: 02 May 2014 11:44
Last report received from DTMR: 2014-08-27T19:50:25
DAGUILAR HIGHWAY, SOUTH NANANGO, 4615 - Planned Roadworks Both Directions Just north of Beitzel Road between Yarraman and Nanango. Commencing: Monday 5 May Concluding:late 2014, weather permitting Short delays expected. Observe signage. Traffic controllers, single-lane closures and speed restrictions will be in place as required. Works will generally be carried out between 6am and 6pm, Monday to Saturday. For further information, please call Transport and Main Roads on 1300 728 390. Last edited: 06 May 2014 15:34
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, MONDURAN, 4671 - Planned Roadworks Between Cabbage Tree Creek and Carmans Road. Commencing: Concluding:late 2014, weather permitting Short delays expected. Changed traffic conditions. Works are underway to realign a section of the Bruce Highway about 10km north of Gin Gin. Motorists are advised to expect changed conditions and observe all safety signage. For further information, please contact Transport and Main Roads (Wide Bay/Burnett Region) on 1300 728 390 during business hours. Last edited: 08 Jan 2014 16:16
Last report received from DTMR: 2014-08-27T19:50:25
North West
Roadworks
FLINDERS HIGHWAY, JULIA CREEK, 4823 - Planned Roadworks Both Directions Gilliat Channels, 33km west of Julia Creek. Commencing: 29 July 12:00am Concluding:29 August 2014, at 12:00am Delays expected. Reduced speed limit (40km/h). Last edited: 25 Jul 2014 15:57
Last report received from DTMR: 2014-08-27T19:50:25
FLINDERS HIGHWAY, RICHMOND, 4740 - Planned Roadworks Both Directions Commencing: 27 June, at 1:27pm Concluding:30 September, at 12:00am Medium delays expected. Allow extra travel time. Multiple road work sites between Hughenden and Richmond. Last edited: 27 Jun 2014 13:28
Last report received from DTMR: 2014-08-27T19:50:25
FLINDERS HIGHWAY, JULIA CREEK, 4823 - Planned Roadworks Both Directions Commencing: 27 June, at 1:25pm Concluding:30 September, at 12:00am Medium delays expected. Allow extra travel time. Multiple construction sites on the Flinders Highway between Richmond and Julia Creek. Reduced speed limits, partial lane closures. Last edited: 27 Jun 2014 13:25
Last report received from DTMR: 2014-08-27T19:50:25
Incidents
BARKLY HIGHWAY, CAMOOWEAL, 4828 - Animal or wildlife Hazard Barkly Highway between Mount Isa and Camooweal. No blockage No delays expected. Proceed with caution. Last edited: 19 Aug 2014 09:39
Last report received from DTMR: 2014-08-27T19:50:25
Far North
Road Closures/Load Limits
KENNEDY DEVELOPMENTAL ROAD, CONJUBOY, 4871 - From Turkey Nest Dam turnoff to Platypus Creek culvert Open (with caution) Reduced speed limit (80Km/h). Last edited: 27 Aug 2014 11:42 Next Update: 01 Sept 2014
Last report received from DTMR: 2014-08-27T19:50:25
PENINSULA DEVELOPMENTAL ROAD, LAURA, 4871 - Laura - Coen Open (with caution) Proceed with caution. Drive to prevailing conditions Last edited: 27 Aug 2014 11:41 Next Update: 01 Sept 2014
Last report received from DTMR: 2014-08-27T19:50:25
MULGRAVE ROAD, PARRAMATTA PARK, 4870 - Between Buchan St and Severin St. Buses Excepted. Subject to a 25 tonne GVM limit Seek alternative transport method. Due to road works for drain replacement under the road, a 25 tonne load limit has been placed on Mulgrave Rd between Buchan St and Aumuller St. Buses are excepted Last edited: 27 Aug 2014 11:41 Next Update: 01 Sept 2014
Last report received from DTMR: 2014-08-27T19:50:25
HERBERTON PETFORD ROAD, IRVINEBANK, 4887 - From Irvinebank to Petford Restricted to high clearance vehicles only Proceed with caution. Last edited: 27 Aug 2014 11:41 Next Update: 01 Sept 2014
Last report received from DTMR: 2014-08-27T19:50:25
MULLIGAN HIGHWAY, MOUNT CARBINE, 4871 - Kelly St George Bridge Subject to a 42.5 tonne GVM limit Bridge/culvert damaged. Kelly St George Creek bridge 72km north of Mt Molloy is closed to all vehicles over 42.5t. Applications for permits for std config B-doubles and Type 1 road trains for emergency use will be considered. No permits will be given to excess mass vehicles Last edited: 27 Aug 2014 11:40 Next Update: 01 Sept 2014
Last report received from DTMR: 2014-08-27T19:50:25
UPPER BARRON ROAD, MALANDA, 4885 - Sections reduced to 60 kilometers per hour Open (with caution) Reduced speed limit (60Km/h). Last edited: 27 Aug 2014 11:40 Next Update: 01 Sept 2014
Last report received from DTMR: 2014-08-27T19:50:25
Special
LONGLANDS GAP ROAD, HERBERTON, 4887 - Special Event Roads affected may include, Herberton-Petford Rd, Longlands Gap Rd, Kennedy Highway and Tumoulin Rd. Commencing: in progress Concluding:to be advised Unknown traffic impact. Motorists are urged to show patience. Due to mine operations in Herberton, motorists can expect an increase in heavy vehicle movements between Herberton and Mt Garnet Last edited: 19 May 2014 10:53
Last report received from DTMR: 2014-08-27T19:50:25
Roadworks
LONGLANDS GAP ROAD, WONDECLA, 4887 - Planned Roadworks Both Directions Wondecla Creek Bridge. Commencing: in progress Concluding:September 2014 One lane closed Delays expected. Allow extra travel time. The bridge will be closed for approximately 15 minutes at a time while workers are on deck, or crane is operating Last edited: 13 Aug 2014 10:46
Last report received from DTMR: 2014-08-27T19:50:25
MULLIGAN HIGHWAY, COOKTOWN, 4895 - Planned Roadworks Both Directions From Trevethan Creek to Kilarney Road. Commencing: in progress Concluding:mid September 2014 One lane closed Unknown traffic impact. Changed traffic conditions. Last edited: 11 Aug 2014 15:57
Last report received from DTMR: 2014-08-27T19:50:25
EAST EVELYN ROAD, EVELYN, 4888 - Planned Roadworks Westbound Between Pipeclay Creek and Sluice Creek Rd. Commencing: 04 August 6:00am Concluding:Early November One lane blocked Unknown traffic impact. Reduced speed limit (40km/h). Last edited: 01 Aug 2014 14:34
Last report received from DTMR: 2014-08-27T19:50:25
PENINSULA DEVELOPMENTAL ROAD, LAURA, 4871 - Planned Roadworks Both Directions Commencing: 4 August 6:30am Concluding:end December 2014 Delays expected. Changed traffic conditions. Last edited: 30 Jul 2014 13:05
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, TULLY, 4854 - Planned Roadworks Southbound Approx 100m south of Dean Road. Commencing: 4 August 9:00am Concluding:mid September 2014 Short delays expected. Changed traffic conditions. Last edited: 23 Jul 2014 14:25
Last report received from DTMR: 2014-08-27T19:50:25
PALMERSTON HIGHWAY, MILLAA MILLAA, 4886 - Planned Roadworks Both Directions Beatrice River Bridge to Brooks Road. Commencing: in progress Concluding:October 2014 Short delays expected. Changed traffic conditions. Last edited: 23 Jul 2014 14:19
Last report received from DTMR: 2014-08-27T19:50:25
KENNEDY HIGHWAY, ATHERTON, 4883 - Planned Roadworks Both Directions Near Rockley Rd. Commencing: in progress Concluding:August 2014 Short delays expected. Last edited: 11 Jul 2014 12:23
Last report received from DTMR: 2014-08-27T19:50:25
GILLIES RANGE ROAD, LAKE BARRINE, 4884 - Planned Roadworks All directions Commencing: 16 June 6:00am Concluding:September 2014 Partial lane closures Unknown traffic impact. Changed traffic conditions. Last edited: 07 Aug 2014 11:36
Last report received from DTMR: 2014-08-27T19:50:25
SOUTH JOHNSTONE ROAD, BOOGAN, 4871 - Planned Roadworks Both Directions Near Innisfail Japoon Road intersection. Commencing: in progress Concluding:August 2014 Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 12:33
Last report received from DTMR: 2014-08-27T19:50:25
CAPTAIN COOK HIGHWAY, CRAIGLIE, 4877 - Planned Roadworks Both Directions Between Boer St and Old Port Rd. Commencing: 10 June 6:00am Concluding:end September Lane or lanes reduced Delays expected. Traffic control on scene. Last edited: 18 Aug 2014 07:28
Last report received from DTMR: 2014-08-27T19:50:25
PORT DOUGLAS ROAD, PORT DOUGLAS, 4877 - Planned Roadworks Both Directions Commencing: in progress Concluding:end September Lane or lanes reduced Delays expected. Traffic control on scene. Road reconstruction works have commenced at two sites within the Douglas Shire Council region. The first is a 660m section in Craiglie between Beor Street and the Shell Service Station. The other is a 1.1km section on Port Douglas Road, starting just past QT Resort heading into Port Douglas. The works at both sites will reconstruct the damaged road surface. Works will be carried out between 6am and 6pm Monday to Saturday. The contractor will work on one lane at a time at each location. Traffic controllers will be in place to assist with the flow of traffic. Some delays can be expected and the works may create dust, noise and some vibration. The works are expected to be completed by the end of September 2014, weather permitting. Last edited: 18 Aug 2014 07:21
Last report received from DTMR: 2014-08-27T19:50:25
PENINSULA DEVELOPMENTAL ROAD, ARCHER RIVER, 4871 - Planned Roadworks All directions Commencing: in progress Concluding:September 2014 Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 12:28
Last report received from DTMR: 2014-08-27T19:50:25
CAPTAIN COOK HIGHWAY, HOLLOWAYS BEACH, 4878 - Planned Roadworks All directions Holloways Beach roundabout nightworks for upgrade of bicycle facilities. Commencing: In progress Concluding:August 2014 Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 12:26
Last report received from DTMR: 2014-08-27T19:50:25
CAPTAIN COOK HIGHWAY, MACHANS BEACH, 4878 - Planned Roadworks All directions Machans Beach roundabout nightworks for upgrade of bicycle facilities. Commencing: in progress Concluding:August 2014 Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 12:20
Last report received from DTMR: 2014-08-27T19:50:25
CAPTAIN COOK HIGHWAY, SMITHFIELD, 4878 - Planned Roadworks All directions Caravonica roundabout nightworks for upgrade of bicycle facilities. Commencing: in progress Concluding:August 2014 Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 12:22
Last report received from DTMR: 2014-08-27T19:50:25
CAPTAIN COOK HIGHWAY, YORKEYS KNOB, 4878 - Planned Roadworks All directions Yorkeys Knob roundabout nightworks for upgrade of bicycle facilities. Commencing: in progress Concluding:August 2014 Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 12:22
Last report received from DTMR: 2014-08-27T19:50:25
GULF DEVELOPMENTAL ROAD, GEORGETOWN, 4871 - Planned Roadworks Both Directions Road widening and reconstruction in various sections from Georgetown to Mount Garnet. Commencing: in progress Concluding:November 2014 Short delays expected. Changed traffic conditions. Last edited: 11 Jul 2014 12:12
Last report received from DTMR: 2014-08-27T19:50:25
MALANDA ATHERTON ROAD, KUREEN, 4885 - Planned Roadworks Both Directions Commencing: in progress Concluding:September 2014 Lane or lanes reduced Unknown traffic impact. Changed traffic conditions. Last edited: 13 Aug 2014 10:57
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, WOREE, 4868 - Planned Roadworks All directions Cairns Bruce Highway Upgrade. Commencing: in progress Concluding:September 2014 Lane or lanes reduced Delays expected. Changed traffic conditions. Speed reductions may be in place for the safety of workers. These works are required for permanent line marking and bridge inspections We would also like to remind our stakeholders that, in the interest of your safety and that of our workers, the Queensland Police Service continue to patrol these road works. Please observe the posted speed limit as some areas have increased to 80km/h Last edited: 13 Aug 2014 11:03
Last report received from DTMR: 2014-08-27T19:50:25
CAPTAIN COOK HIGHWAY, BARRON, 4878 - Planned Roadworks Both Directions Night works at Holloways Beach roundabout from 7:00pm until 5:00am. Upgrade for bicycle facilities. Commencing: in progress Concluding:August 2014 Unknown traffic impact. Changed traffic conditions. Last edited: 11 Jul 2014 12:21
Last report received from DTMR: 2014-08-27T19:50:25
KENNEDY HIGHWAY, MACALISTER RANGE, 4871 - Planned Roadworks Both Directions Various sections of the Kuranda Range for slope stabilisation. Commencing: in progress Concluding:October 2014 One lane closed Delays expected. Changed traffic conditions. The work will repair multiple sites above and below the range road between the bottom of the range and Koah Road Last edited: 13 Aug 2014 11:02
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, MIDGENOO, 4854 - Planned Roadworks Both Directions Overtaking lanes between Broderick Road and Feluga Road. Commencing: in progress Concluding:October 2014 Lane or lanes reduced Delays expected. Changed traffic conditions. Works will be carried out Monday to Saturday between 6.30 am and 5.30 pm, weather permitting. For the safety of motorists and roadworkers, changed traffic conditions, traffic controllers and speed reductions will be implemented through the work site during working hours. Minor traffic delays expected Last edited: 13 Aug 2014 11:02
Last report received from DTMR: 2014-08-27T19:50:25
GILLIES RANGE ROAD, YUNGABURRA, 4884 - Planned Roadworks Both Directions Commencing: in progress Concluding:September 2014 Partial lane closures Unknown traffic impact. Changed traffic conditions. Works will be undertaken at: * Near Powley Road and 1.6km past the Lake Barrine access road, * Malanda-Lake Barrine Road intersection and Curtain Fig Tree Road in Yungaburra Residents wanting to access Gillies Range Road will need to travel via Elm Street and either Pine Street or Short Street. For further information about the project, please contact Lea Coghlan, Project Communications Officer, on 4040 6339 or email reconstruct_cairns@tmr.qld.gov.au Last edited: 07 Aug 2014 11:28
Last report received from DTMR: 2014-08-27T19:50:25
Incidents
KENNEDY HIGHWAY, KOAH, 4881 - Smoke or poor visibility Hazard All directions Near Koah Road due to earlier hazard reduction burn. Unknown traffic impact. Proceed with caution. Last edited: 26 Aug 2014 13:16
Last report received from DTMR: 2014-08-27T19:50:25
Mackay-Whitsunday
Roadworks
BRUCE HIGHWAY, MACKAY, 4740 - Planned Roadworks Coningsby. Commencing: 11 August 2014, at 1:56pm Concluding:30 September 2014, at 12:00am No blockage No delays expected. Observe signage. Construction of dual overtaking lanes north of Coningsby school to north of Koshs Road Last edited: 11 Aug 2014 13:57
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, SARINA, 4737 - Planned Roadworks Both Directions South of Tommy Creek, north of Hutchins Road. Commencing: 23 July, at 12:32pm Concluding:31 December, at 12:00am No delays expected. Observe signage. Works are currently underway to construct two overtaking lanes south of Sarina Last edited: 23 Jul 2014 15:20
Last report received from DTMR: 2014-08-27T19:50:25
DUTTON STREET, WALKERSTON, 4751 - Planned Roadworks All directions Access to Stewart St from Dutton St currently restricted. Access to Pitkin Stwill close from 27 August for 3 to 5 days. Stewart St will reopen while Pitkin St is closed. Night works taking place from 26 August for three nights between 6pm and 6am.. Commencing: 26 May 2014, at 1:00am Concluding:30 September 2014, at 12:00am Partial lane closures Delays expected. Changed traffic conditions. Works to upgrade Dutton Street and parts of Bold Street as part of Safer Roads Sooner Program. Works include pavement repairs and widening, construction of auxiliary turning lanes and pedestrian refuges. Last edited: 26 Aug 2014 12:54
Last report received from DTMR: 2014-08-27T19:50:25
PEAK DOWNS HIGHWAY, ETON, 4741 - Planned Roadworks Both Directions Road works to take place in Eton Township and Drapers Siding including the widening of Sandy Creek Bridge, installation of a pedestrian path and reconstruction of existing pavement from Barrier Street through to Baulch Road/Webbs Road.. Commencing: 16 September, at 6:00am Concluding:December 2014 Short delays expected. Allow extra travel time. Works currently underway in Eton. Expect short delays and potential single lane closures. All works are expected to be completed by late 2014. Last edited: 15 Jul 2014 11:09
Last report received from DTMR: 2014-08-27T19:50:25
Fitzroy
Roadworks
BRUCE HIGHWAY, MIRIAM VALE, 4677 - Planned Roadworks All directions Commencing: 04 August 3:48pm Concluding:29 August 2014, at 12:00am Partial lane closures No delays expected. Changed traffic conditions. Reconstruction roadworks are underway on the Bruce Highway (five sites between Benaraby and the Kolan River). Traffic control, including single lane closures, will be in place and delays of up to 15 minutes can be expected. Motorists are advised to drive to the changed conditions and follow all signage for their own safety and the safety of road workers. Last edited: 04 Aug 2014 15:49
Last report received from DTMR: 2014-08-27T19:50:25
DAWSON HIGHWAY, WOODERSON, 4680 - Planned Roadworks Both Directions Nine Mile Creek Bridge. Commencing: 01 August 9:37am Concluding:19 September 2014, at 12:00am No delays expected. Reduced speed limit (60km/h). Last edited: 01 Aug 2014 09:38
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, MOUNT LARCOM, 4695 - Planned Roadworks Both Directions Commencing: 09 July, at 11:18am Concluding:01 September, at 12:00am Short delays expected. Changed traffic conditions. Reconstruction roadworks are underway on the Bruce Highway (one site between Calliope and Mt Larcom). Traffic control, including single lane closures, will be in place and delays of up to 15 minutes can be expected. Motorists are advised to drive to the changed conditions and follow all signage for their own safety and the safety of road workers. Last edited: 09 Jul 2014 11:19
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, PORT CURTIS, 4700 - Planned Roadworks Both Directions Bruce Highway - Egans Hill to Yeppen Roundabout. Commencing: 10 April 10:29am Concluding:31 March, at 12:00am No delays expected. Changed traffic conditions. Construction has commenced on the $296 million Yeppen South project between Egans Hill and Yeppen roundabout, south of Rockhampton. Speed restrictions are in place. Last edited: 10 Apr 2014 10:30
Last report received from DTMR: 2014-08-27T19:50:25
EIDSVOLD THEODORE ROAD, CRACOW, 4719 - Planned Roadworks Both Directions Immediately to the east of Cracow. Commencing: 19 March, at 11:34am Concluding:31 December, at 6:00pm Short delays expected. Changed traffic conditions. Last edited: 10 Apr 2014 10:08
Last report received from DTMR: 2014-08-27T19:50:25
Incidents
EIDSVOLD THEODORE ROAD, CAMBOON, 4719 - Infrastructure damage Hazard Both Directions Boam Creek Bridge. No delays expected. Reduced speed limit (60km/h). Sidetrack under construction. Boam Creek Bridge will then be closed until repair works completed. Last edited: 29 Jul 2014 10:43
Last report received from DTMR: 2014-08-27T19:50:25
Northern
Special
FLINDERS STREET, TOWNSVILLE CITY, 4810 - Special Event Both Directions Between Denham Street and Stokes Street. Sundays 6am to 3pm. Commencing: 02 August, at 6:00am Concluding:17 June 2021, at 3:00pm Road closed both directions Unknown traffic impact. Use alternative route. Flinders Street between Denham Street and Stokes Street is where a planned event will be occurring every Sunday. This event will commence every Sunday at 6:00am and finish up the same day on 3:00pm. A full closure of Flinders Street between Denham Street and Stokes Street will be in place for the duration of the event. Last edited: 01 Aug 2014 14:43
Last report received from DTMR: 2014-08-27T19:50:25
Roadworks
DALRYMPLE ROAD, RICHMOND HILL, 4820 - Planned Roadworks Both Directions Power pole replacement will occur at the corner of Hacket Terrace and Dalrymple Road. Commencing: 08 September 2014, at 8:53am Concluding:19 September 2014, at 12:00am Partial lane closures No delays expected. Observe signage. Last edited: 26 Aug 2014 09:13
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, GIRU, 4809 - Planned Roadworks Both Directions Minor asphalt works will occur on the Huaghton River Bridge and at Collinsons Lagoon. Commencing: 27 August 2014, at 6:30am Concluding:03 September 2014, at 5:00pm Partial lane closures Delays expected. Changed traffic conditions. Last edited: 19 Aug 2014 10:06
Last report received from DTMR: 2014-08-27T19:50:25
THURINGOWA DRIVE, THURINGOWA CENTRAL, 4817 - Planned Roadworks Both Directions Installation of overhead optic fibre cable will occur near the intersection of Hinchinbrook Drive and Thuringowa Drive. Commencing: 26 August 2014, at 9:22am Concluding:28 August 2014, at 12:00am Partial lane closures No delays expected. Changed traffic conditions. Last edited: 26 Aug 2014 09:26
Last report received from DTMR: 2014-08-27T19:50:25
GILLIAN ROAD, MCDESME, 4807 - Planned Roadworks Eastbound Commencing: 25 August 2014, at 6:00am Concluding:03 October 2014, at 6:00pm Partial lane closures No delays expected. Observe signage. Last edited: 20 Aug 2014 16:24
Last report received from DTMR: 2014-08-27T19:50:25
REDBANK DRIVE, GREENVALE, 4816 - Planned Roadworks Erection of wind-up sign. Commencing: 22 August 2014, at 4:48pm Concluding:28 August 2014, at 8:00am Unknown traffic impact. Changed traffic conditions. Last edited: 22 Aug 2014 16:51
Last report received from DTMR: 2014-08-27T19:50:25
KALYNDA PARADE, BOHLE PLAINS, 4817 - Planned Roadworks All directions Commencing: 22 August 2014, at 4:21pm Concluding:31 October 2014, at 6:00pm Partial lane closures Unknown traffic impact. Observe signage. Last edited: 22 Aug 2014 16:26
Last report received from DTMR: 2014-08-27T19:50:25
LAKELAND BOULEVARD, IDALIA, 4811 - Planned Roadworks Lakeland Boulevard roundabout. Commencing: 21 August 2014, at 6:30am Concluding:18 September 2014, at 5:00pm No blockage No delays expected. Observe signage. Last edited: 19 Aug 2014 17:23
Last report received from DTMR: 2014-08-27T19:50:25
HERVEY RANGE ROAD, RANGEWOOD, 4817 - Planned Roadworks Westbound At the intersection of Ridge Drive. Commencing: 18 August 2014, at 1:09pm Concluding:30 November 2014, at 6:00pm Partial lane closures Delays expected. Observe signage. Last edited: 18 Aug 2014 13:10
Last report received from DTMR: 2014-08-27T19:50:25
GEDGE STREET, INGHAM, 4850 - Planned Roadworks Both Directions Commencing: 18 August 2014, at 6:00am Concluding:12 September 2014, at 6:00pm Partial lane closures No delays expected. Observe signage. Last edited: 08 Aug 2014 14:14
Last report received from DTMR: 2014-08-27T19:50:25
LANNERCOST STREET, INGHAM, 4850 - Planned Roadworks All directions Commencing: 15 August 2014, at 7:00am Concluding:11 October 2014, at 4:00pm No blockage No delays expected. Observe signage. Last edited: 15 Aug 2014 16:58
Last report received from DTMR: 2014-08-27T19:50:25
BECK DRIVE, CONDON, 4815 - Planned Roadworks Both Directions Ring Road Overpass. Commencing: 11 August 2014, at 6:00am Concluding:30 September 2014, at 6:00pm Lane or lanes reduced No delays expected. Traffic control on scene. Last edited: 08 Aug 2014 14:12
Last report received from DTMR: 2014-08-27T19:50:25
MENZIES STREET, INGHAM, 4850 - Planned Roadworks Both Directions Between Cartwright St and Marine Pde. Commencing: 11 August 2014, at 6:00am Concluding:05 September 2014, at 6:00pm Partial lane closures Unknown traffic impact. Observe signage. Last edited: 08 Aug 2014 14:13
Last report received from DTMR: 2014-08-27T19:50:25
COVELL STREET, INGHAM, 4850 - Planned Roadworks Eastbound Commencing: 11 August 2014, at 6:00am Concluding:05 September 2014, at 6:00pm Partial lane closures No delays expected. Observe signage. Last edited: 08 Aug 2014 14:14
Last report received from DTMR: 2014-08-27T19:50:25
INGHAM FORREST BEACH ROAD, FORREST BEACH, 4850 - Planned Roadworks Both Directions Commencing: 08 August 2014, at 10:07am Concluding:12 September 2014, at 6:00pm Partial lane closures Unknown traffic impact. Changed traffic conditions. Works are currently being undertaken on Haig Street. Last edited: 21 Aug 2014 15:27
Last report received from DTMR: 2014-08-27T19:50:25
ABERGOWRIE ROAD, ABERGOWRIE, 4850 - Planned Roadworks Westbound Commencing: 08 August 2014, at 9:54am Concluding:29 September 2014, at 6:00pm Partial lane closures Unknown traffic impact. Changed traffic conditions. Works are currently being undertaken on Stallons Lane. Last edited: 21 Aug 2014 13:19
Last report received from DTMR: 2014-08-27T19:50:25
TREBONNE ROAD, INGHAM, 4850 - Planned Roadworks Westbound Commencing: 08 August 2014, at 9:29am Concluding:28 September 2014, at 6:00pm Partial lane closures Unknown traffic impact. Changed traffic conditions. Reconstruction works will be taking place on Hamleigh Road. Last edited: 21 Aug 2014 13:25
Last report received from DTMR: 2014-08-27T19:50:25
GREGORY DEVELOPMENTAL ROAD, BASALT, 4820 - Planned Roadworks Both Directions Road reconstruction works will occur between Grey Creek and East Paddys Creek bridge. Commencing: 30 July 2014, at 11:09am Concluding:30 September 2014, at 6:00pm Both lanes affected No delays expected. Last edited: 08 Aug 2014 12:02
Last report received from DTMR: 2014-08-27T19:50:25
CHARTERS TOWERS ROAD, HYDE PARK, 4812 - Planned Roadworks Both Directions Installation of fibre optics cable near the intersection of Somer Street. Commencing: 25 July 2014, at 9:48am Concluding:18 September 2014, at 6:00pm No delays expected. Observe signage. Last edited: 18 Aug 2014 13:49
Last report received from DTMR: 2014-08-27T19:50:25
HUGH STREET, WEST END, 4810 - Planned Roadworks Various locations. Commencing: 25 July 2014, at 7:00am Concluding:16 October 2014, at 5:00pm No blockage No delays expected. Observe signage. Last edited: 08 Aug 2014 11:39
Last report received from DTMR: 2014-08-27T19:50:25
WOOLCOCK STREET, GARBUTT, 4814 - Planned Roadworks Commencing: 25 July 2014, at 7:00am Concluding:16 October 2014, at 5:00pm No blockage No delays expected. Last edited: 08 Aug 2014 11:39
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, MCDESME, 4807 - Planned Roadworks Both Directions Burdekin Bridge Maintenance. Commencing: 15 July 2014, at 9:30am Concluding:28 August 2014, at 2:30pm Partial lane closures Delays expected. Traffic control on scene. Burdekin River Bridge Maintenance - Until 29 August 2014 0930 to 1430. Works will require the bridge to be closed to all vehicles wider than 3.0m. All vehicles in excess of 3.0m will NOT be able to traverse the Burdekin River Bridge during this period and MUST use alternative routes. Monday 11 August to Wednesday 13 August 2014 9.30am to 2.30pm. Works will require single lane closures. All heavy vehicle operators with vehicles/loads in excess of 3.0m must contact Dave MacCauley on 0407 690 314 at least 48 hours in advance with an anticipated time of arrival to allow for barriers and other infrastructure to be cleared. Last edited: 14 Aug 2014 15:10
Last report received from DTMR: 2014-08-27T19:50:25
WOOLCOCK STREET, GARBUTT, 4814 - Planned Roadworks All directions Initial works to upgrade the intersection of Woolcock Street and Pilkington Street have commenced. Commencing: 10 July 2014, at 5:33pm Concluding:works will be ongoing Partial lane closures No delays expected. Traffic control on scene. Last edited: 08 Aug 2014 11:46
Last report received from DTMR: 2014-08-27T19:50:25
THURINGOWA DRIVE, KIRWAN, 4817 - Planned Roadworks Signage for road works on Hudson Street in place. Commencing: 30 June 2014, at 8:00am Concluding:30 September 2014, at 4:00pm No blockage No delays expected. Observe signage. Last edited: 08 Aug 2014 11:37
Last report received from DTMR: 2014-08-27T19:50:25
BOWEN ROAD, ROSSLEA, 4812 - Planned Roadworks Various locations along Bowen Road. Commencing: 25 June 2014, at 12:48pm Concluding:16 October 2014, at 5:00pm No blockage Unknown traffic impact. Observe signage. Last edited: 08 Aug 2014 11:37
Last report received from DTMR: 2014-08-27T19:50:25
ROSS RIVER ROAD, CRANBROOK, 4814 - Planned Roadworks Works will be occuring in the shoulder between Bamford Lane and Louisa Street . Commencing: 23 June 2014, at 9:00am Concluding:31 December 2014, at 2:30pm No blockage Unknown traffic impact. Last edited: 08 Aug 2014 11:38
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, GIRU, 4809 - Planned Roadworks All directions Commencing: 16 June 7:00am Concluding:01 December 2014, at 12:00pm No blockage Delays expected. Observe signage. Last edited: 15 Aug 2014 09:42
Last report received from DTMR: 2014-08-27T19:50:25
SAUNDERS STREET, RAILWAY ESTATE, 4810 - Planned Roadworks Works on footpath. Commencing: 13 June 2014, at 2:30pm Concluding:12 August 2015, at 8:00pm No blockage Unknown traffic impact. Changed traffic conditions. Last edited: 14 Aug 2014 16:32
Last report received from DTMR: 2014-08-27T19:50:25
ABBOTT STREET, CLUDEN, 4811 - Planned Roadworks All directions As part of the Vantassel to Cluden duplication project Abbott Street is closed at the intersection of the Bruce Highway detours are in place. Commencing: 07 June 6:00am Concluding:31 December 2014, at 11:00pm Partial lane closures No delays expected. Changed traffic conditions. Last edited: 08 Aug 2014 11:35
Last report received from DTMR: 2014-08-27T19:50:25
DALRYMPLE ROAD, MOUNT LOUISA, 4814 - Planned Roadworks All directions Intersection of Dalrymple Road, Banfield Drive & Angus Avenue. Commencing: 06 June 2014, at 11:48am Concluding:24 December 2014, at 5:00pm Partial lane closures Delays expected. Changed traffic conditions. Dalrymple Road Intersection Upgrade Intersection of Dalrymple Road, Banfield Drive & Angus Avenue Works have commenced at the intersection upgrade of Dalrymple Road, Banfield Drive & Angus Avenue intersection, Mt Louisa. The project will remove the current roundabout on Dalrymple Road and replace it with a fully signalised intersection (traffic lights). During these works, there will be a number of changed traffic conditions on Dalrymple Road, Banfield Drive and Angus Avenue including: - Lane closures - Speed restrictions - Restricted access for cyclists and pedestrians. Motorists should expect delays when travelling through the area, particularly during peak hours. To avoid delays, motorists are advised to allow extra travel time when using Dalrymple Road, Banfield Drive & Angus Avenue and consider alternative routes wherever possible during the project Last edited: 11 Aug 2014 10:14
Last report received from DTMR: 2014-08-27T19:50:25
HERVEY RANGE ROAD, BOHLE PLAINS, 4817 - Planned Roadworks Works occuring on road reserve in the vacinity of Gumlow Road. Commencing: 02 June 2014, at 6:00am Concluding:29 May 2015 No blockage No delays expected. Observe signage. Last edited: 08 Aug 2014 11:35
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, BEMERSIDE, 4850 - Planned Roadworks All directions Commencing: 01 June 6:30am Concluding:01 October 2014, at 6:00pm No blockage No delays expected. Observe signage. Last edited: 08 Aug 2014 11:36
Last report received from DTMR: 2014-08-27T19:50:25
INGHAM ROAD, MOUNT ST JOHN, 4818 - Planned Roadworks Both Directions Blakeys Crossing the section of Ingham Road between mather Street and Duckworth Street is being upgraded. From Wednesday 23 April until the completion of the project, council will close this section of Ingham Road. Commencing: October 2013 Concluding:prior to 2014/2015 wet season Road closed both directions No delays expected. Use alternative route. Last edited: 08 Aug 2014 11:38
Last report received from DTMR: 2014-08-27T19:50:25
UNIVERSITY ROAD, ANNANDALE, 4814 - Planned Roadworks All directions Intersection upgrade – University Road, Melton Black Drive and Macarthur Drive roundabout. . Commencing: March 2014 Concluding: September 2014 Partial lane closures Delays expected. Changed traffic conditions. Works will be taking place between 6.00am and 6.00pm, Monday to Saturday. Works are underway to upgrade the intersection of Melton Black Drive, Macarthur Drive and University Road in Annandale to a fully signalised intersection. Speed restrictions, lane closures and changed traffic conditions are in place on University Road and Macarthur Drive. To avoid delays, motorists are advised to allow extra travel time when using University Road or Macarthur Drive. Access to businesses in Annandale will be maintained at all times during the project. A temporary road closure will be inplace for Macarthur Drive between William Angliss Drive and Universtiy Road on Saturday 23 and Sunday 24 August to allow asphalting to occur Last edited: 18 Aug 2014 13:18
Last report received from DTMR: 2014-08-27T19:50:25
ROONEYS BRIDGE, RAILWAY ESTATE, 4810 - Planned Roadworks Both Directions Works to pedestrian walkway next to Rooneys Bridge. Commencing: 10 March 2014, at 6:00am Concluding:28 November 2014, at 5:00pm No blockage No delays expected. Observe signage. Last edited: 27 Aug 2014 16:22
Last report received from DTMR: 2014-08-27T19:50:25
ROSS RIVER ROAD, AITKENVALE, 4814 - Planned Roadworks Southbound Corner of Ross River Road and Nathan Street. Commencing: 24 January 6:00am Concluding:11 December 2014, at 6:00pm Partial lane closures Unknown traffic impact. Observe signage. Last edited: 15 Aug 2014 11:15
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, DEERAGUN, 4818 - Planned Roadworks All directions Commencing: 20 December 2013, at 12:00am Concluding:20 December 2014 No blockage No delays expected. Observe signage. Last edited: 08 Aug 2014 11:37
Last report received from DTMR: 2014-08-27T19:50:25
LAKESIDE DRIVE, IDALIA, 4811 - Planned Roadworks Both Directions Construction works on Lakeside Drive. Commencing: 30 November, at 7:00am Concluding:30 November 2014, at 6:30pm Unknown traffic impact. Observe signage. Last edited: 08 Aug 2014 11:37
Last report received from DTMR: 2014-08-27T19:50:25
HALIFAX ROAD, FORESTHOME, 4850 - Planned Roadworks Both Directions Along several locations through to the Halifax Lucinda Point Road . Commencing: 20 November 2013, at 5:29pm Concluding: October 2014 Both lanes affected No delays expected. Observe signage. INGHAM - HALIFAX - BEMERSIDE ROAD HALIFAX - LUCINDA POINT ROAD Various Sites Reconstruction works Anticipated Completion: October 2014 * Natural Disaster Relief and Recovery work along several sections of the Ingham-Halifax-Bemerside Road * This project will be delivered in stages and intermittently to best manage wet weather risk. * Completion is anticipated for October 2014. * motorists can expect lane closures, speed restrictions, delays of up to 15 minutes. Traffic controllers will be on site during the day with traffic lights in operation after hours. * Wide load restrictions of more than 3m will be in place and drivers are directed to contact Ben Gibson on 0477 306 851 or Matthew Smith on 0427 122 503 prior to passing through the roadworks, with notice to be provided a minimum of 48 hours in advance. Last edited: 15 Aug 2014 09:41
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, STUART, 4811 - Planned Roadworks Both Directions Between Vantassel Street and Stuart Drive. Wide load restrictions apply. Commencing: 09 October 2013, at 9:29am Concluding:Mid 2015 All lanes affected Delays expected. Reduced speed limit (60km/h). BRUCE HIGHWAY (Ayr - Townsville) Vantassel to Cluden Highway Duplication Anticipated completion: Early 2015 Works are continuing on the duplication of the Bruce Highway, between Vantassel Street and Stuart Drive, Cluden. Major traffic changes are in place around the Abbott Street intersection with a temporary detour and roundabout in place. A 60km/h speed restriction remains in place between Vantassel Street and Stuart Drive. Motorists travelling on this section of the Bruce Highway can expect minor delays, lane closures, stop/go traffic control, construction trucks turning on and off the highway, and further changed traffic conditions as construction progresses. The project is due for completion in mid-2015. Last edited: 08 Aug 2014 11:49
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, INGHAM, 4850 - Planned Roadworks Both Directions Arnot Creek Bridge 60 kilometre an hour speed restriction in place. Commencing: Early 2013 Concluding:Dec 2014 Both lanes affected No delays expected. Observe signage. Ingham to Cardwell Range Arnot Creek Bridge * The Arnot Creek Bridge is open to two lanes of traffic, however a 60km/hr speed limit over the bridge remains in place until bridge repairs have been investigated and completed. * Motorists are advised to observe and obey all signage when travelling through this site. Last edited: 08 Aug 2014 12:01
Last report received from DTMR: 2014-08-27T19:50:25
BRUCE HIGHWAY, BRANDON, 4808 - Planned Roadworks Southbound Sandy Corner to Collinsons Lagoon. Commencing: 30 November 2012, at 5:00pm Concluding: Sept 2014 All lanes affected Unknown traffic impact. Observe signage. Sandy Corner to Collinson's Lagoon Road realignment Anticipated completion - Sept 2014 * Presently there is no linemarking, so it is extremely important that motorists do not overtake or exceed the posted speed limits. The Department (TMR) urges all motorists to adhere to these restrictions as Queensland Police regularly patrol this section of the highway. Last edited: 08 Aug 2014 11:47
Last report received from DTMR: 2014-08-27T19:50:25
RIVERWAY DRIVE, THURINGOWA CENTRAL, 4817 - Planned Roadworks Southbound 210 metres south of the Village Boulevard intersection. Commencing: 27 September 12:00am Concluding:30 September 2014, at 12:00am No blockage No delays expected. Observe signage. Installation of a temporary access to construction site. Speed restrictions in place. Please drive with caution in the area. Last edited: 15 Aug 2014 09:41
Last report received from DTMR: 2014-08-27T19:50:25
Incidents
ROSS RIVER ROAD, THURINGOWA CENTRAL, 4817 - Multi-vehicle Crash All directions Ross River & Thuringowa Road. Partial lane closures Unknown traffic impact. Emergency services are on scene/en-route. Last edited: 27 Aug 2014 19:46
Last report received from DTMR: 2014-08-27T19:50:25
HERVEY RANGE ROAD, HERVEY RANGE, 4817 - Smoke or poor visibility Hazard Both Directions A controlled burn will take place between the Canal Creek Bridge and Alice River Bridge. No blockage No delays expected. Proceed with caution. Last edited: 26 Aug 2014 07:39
Last report received from DTMR: 2014-08-27T19:50:25